Welder Package
Solicitation # W911S226U2450Updated Jan 15, 2026
This RFP closed on Jan 22, 2026.
Closed
Jan 22, 2026
Responses were due Jan 22, 2026, 8:00 AM EST
- Posted
- Jan 15, 2026
- Closed
- Jan 22, 2026
Similar open RFPs
Same NAICS group or Supplies, Equipment & Furniture, nearby first, ranked by score.
Why this score
29 days to respond, new this week; but small typical award (~$56K).
Why this score
29 days to respond, new this week; but small typical award (~$125K).
Why this score
29 days to respond, new this week; but small typical award (~$57K).
Why this score
29 days to respond, new this week; but small typical award (~$125K).
Why this score
25 days to respond, active buyer ($169M FY24–FY26); but small typical award (~$56K).
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
What this RFP is about
Department of the Army (W6QM MICC-FT DRUM), part of the Department of Defense, posted a combined synopsis/solicitation titled “Welder Package” under solicitation number W911S226U2450. It was posted on Jan 15, 2026. The response deadline was Jan 22, 2026, 8:00 AM EST. It is classified under NAICS 333992 (Welding and Soldering Equipment Manufacturing) and product/service code 3438. The set-aside is listed as Small Business Set Aside - Total. The listed point of contact is Charlie Snell.
Key facts
- Issuer
- Department of the Army
- Department / office
- Department of Defense›Department of the Army›W6QM MICC-FT DRUM
- Sector
- Federal
- Category
- Supplies, Equipment & Furniture
- PSC
- 3438
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- Not stated
- ZIP 74501
- Value
- Not stated
- Solicitation #
- W911S226U2450
- Listing
- Official federal notice
Score at publication
Score breakdown
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
- Value0.0unknown
No value published, and there isn't enough award history to estimate one. Scored as neutral.
- Competition & access+4.5estimated
Total small-business set-aside.
- Issuer & market+3.2estimated
2,008 other RFPs from Department of the Army on RFP Detector in the past 12 months; no award history found.
- Time & stage−1.7measured
Solicitation, bids due: 7 days to respond (due Jan 22, 2026, 8:00 AM EST). Tight.
- Clarity & completeness+1.6estimated
Documents not listed, named contact with email and phone, 366-word description.
- Freshness+9.0measured
Posted today.
50 + contributions = 67 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Jan 15, 2026.
Requirements & submission
Eligibility · Small Business Set Aside - Total
Small-business set-asides reserve a contract, or part of it, for businesses that meet the size standard for the NAICS code on the notice. "Total" set-asides restrict the whole requirement; "partial" set-asides restrict part of it.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Description
MIG WELDER PACKAGE 3) General RequirementsThis section provides the specification requirements for the Welding Machine Package. Note: Every item listed in this section shall be accounted for in the offeror?s proposal for it to be considered (see section 6.).a) System shall meet all applicable OSHA standards and regulations.b) Vendor Shall ensure All Components of the system are compatible. c) Power supply shall have a minimum duty cycle of 100% at 36volts/400 amps.d) Machine Shall be compatible with 480-volt 3 phase power.e) System Shall be able to do the following processes,1. Shielded Metal Arc Welding (SMAW)2. Direct Current Gas Tungsten Arc Welding (DC GTAW)a. High Frequency Startb. Lift Arc3. Gas Metal Arc Welding (GMAW)4. Pulse Gas Metal Arc Welding (GMAW-P)5. Flux Core Arc Welding (FCAW)f) The wire feeder shall be a dual wire setup.1. The Wire feeder shall have a minimum duty cycle of 100% at 100 volts/600 amps.2. The Wire feeder Shall include spool covers for 33lb wire spools.3. The Wire feeder Shall include 2, 15ft (min) 300amp Mig gun assemblies.4. The Wire feeder Shall be compatible with ?Miller style? power pins on the Mig gun assemblies.5. Wire feeder control cable and weld power cable Shall be included.6. 25 ft work sense lead shall be included.7. Vendor Shall include Feeder drive roll kits of the following sizes (Dual size reversable are acceptable).a. .035 V-Grooveb. .045 V-Groovec. .062 V-Groove8. Vendor Shall include Wire Guides of the following sizes.a. .035b. .045c. .062g) System Shall include a wireless remote foot controller.1. Wireless foot control Shall accept ?AA? size batteries.2. Vendor Shall provide batteries to fill the controller not less than 2 times.h) System Shall include a heavy-duty foot control pedal with 20ft of cord.i) System Shall Include 2 Sheild Gas Flow meter regulators.j) System Shall include 2 gas hoses (4ft min).k) Machine must include a cooler.1. Cooler must be removeable for service/repair.l) Machine must have dedicated Tig Torch Connection.m) Machine must have dedicated Tig Gas hose Connection.n) Machine must have dedicated Tig Remote Connection.o) Machine must have dedicated Stick Connection.p) Machine must have dedicated Work cable Connection.q) Running Gear/Cart Shall be included.1. 2 brackets to stow the foot controls Shall be included.r) 25 ft(min) Work Lead Shall be included.
Documents
No documents are listed for this notice.
Contacts
Charlie Snell
Primary
Points of contact as published on the notice.
Timeline & history
Combined Synopsis/Solicitation posted
Responses were due
More from Department of the Army
869 open RFPs from this issuer and its offices.
40FT Class 3 Steel Pole
Department of the Army
Why this score
Small-business set-aside, recently updated; but only 1 day left.
40FT Class 3 Steel Pole
Department of the Army
Why this score
Small-business set-aside, recently updated; but only 1 day left.
Facility Maintenance and Repair Services, APS Zutendaal, Belgium
Department of the Army · Zutendaal
Why this score
Clear, complete notice; but only 1 day left.
Custodial Services - Cranston, RI (RI007)
Department of the Army
Why this score
Active buyer ($1.4B FY24–FY26), full and open; but only 1 day left.
Refuse and Recycling Services - Edison, NJ (NJ003)
Department of the Army
Why this score
New this week, full and open; but only 1 day left.
FY27 NWK Facilitated Partnering SATOC
Department of the Army
Why this score
Active buyer ($1.7B FY24–FY26), full and open; but only 1 day left.
RFP Detector Scores are informational.How we score →
About this notice
Official federal notice. Updated Jan 15, 2026.
Official solicitation:Sign in free to open the official solicitation