Brockway Mechanical Systems I NC
BState contracts since 2009Updated Nov 13, 2026
Brockway Mechanical Systems I NC holds 31 contracts worth $12.4M with 4 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2009.
- Total contract value
- $12.4M
- Current contract amounts
- Spent to date
- $10.9M
- 88% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 31
- Since 2009
- Agencies served
- 4
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Contracts
31 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Replace Defective Water Heaters Franklin CF Franklin County DM3060HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3060H | Sep 23, 2015to Jul 24, 2016 | Sep 23, 2015 | Jul 24, 2016 | $712,369$704,056 spent | $704,056 | |
Replace fiberglass structure 43, sewage trtmt plant, altona CF D44930CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44930C | May 19, 2015to Feb 13, 2016 | May 19, 2015 | Feb 13, 2016 | $161,161$148,934 spent | $148,934 | |
Emergency-Thaw & Restore Frozen Fire Protect Line-Upstate CF DEC893PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC893P | Mar 18, 2015to Jun 16, 2015 | Mar 18, 2015 | Jun 16, 2015 | $150,000$20,692 spent | $20,692 | |
Job order contracting - area 4 D45084HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45084H | Jan 22, 2015to Jan 20, 2017 | Jan 22, 2015 | Jan 20, 2017 | $500,000$496,552 spent | $496,552 | |
Job order contracting - area 4 D45084PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45084P | Jan 22, 2015to Jan 20, 2017 | Jan 22, 2015 | Jan 20, 2017 | $500,000$51,963 spent | $51,963 | |
Replace failed domestic water heaters franklin CF malone franklin county DEC736PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC736P | Oct 6, 2014to Apr 30, 2015 | Oct 6, 2014 | Apr 30, 2015 | $300,000$250,401 spent | $250,401 | |
Hawkins hall food venue projec T000519Contract not subject to state pre-audit | College at Plattsburgh | Contract not subject to state pre-auditNot pre-audited | T000519 | Jun 5, 2014to Aug 15, 2014 | Jun 5, 2014 | Aug 15, 2014 | $560,239$397,854 spent | $397,854 | |
Replace annex water main clinton county CF D44709PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44709P | Jun 2, 2014to Nov 9, 2015 | Jun 2, 2014 | Nov 9, 2015 | $368,763$357,882 spent | $357,882 | |
Replace feedwater tank ? powerhouse building 13 adirondack CF D44707HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44707H | Apr 16, 2014to Jul 31, 2016 | Apr 16, 2014 | Jul 31, 2016 | $606,682$606,595 spent | $606,595 | |
Replace chillers infirmary building franklin CF DM3035HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3035H | Feb 24, 2014to Nov 21, 2014 | Feb 24, 2014 | Nov 21, 2014 | $143,143$126,743 spent | $126,743 | |
Replace observation tower HVAC clinton CF D44508HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44508H | Nov 29, 2013to Dec 13, 2015 | Nov 29, 2013 | Dec 13, 2015 | $50,660$50,638 spent | $50,638 | |
Banks hall kitchen ventilation T000501Contract not subject to state pre-audit | College at Plattsburgh | Contract not subject to state pre-auditNot pre-audited | T000501 | May 20, 2013to Aug 2, 2013 | May 20, 2013 | Aug 2, 2013 | $179,179$171,965 spent | $171,965 | |
Replace boiler building 14 altona CF HVAC D44516HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44516H | Apr 12, 2013to Aug 17, 2015 | Apr 12, 2013 | Aug 17, 2015 | $627,616$614,622 spent | $614,622 | |
Provide & upgrade existing natural gas HVAC components bare hill CF & franklin CF & upstate CF DQ1507HConstruction: Miscellaneous | Office of General Services - Design & Construction | Construction: MiscellaneousConstruction | DQ1507H | Nov 20, 2012to Dec 29, 2017 | Nov 20, 2012 | Dec 29, 2017 | $2,777,706$2,776,710 spent | $2,776,710 | |
Lake luzerne campground shower buildings warren county D008726Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D008726 | Oct 11, 2012to Aug 13, 2013 | Oct 11, 2012 | Aug 13, 2013 | $175,175$168,121 spent | $168,121 | |
Lake luzerne CG shower buildin D008727Contract not subject to state pre-audit | Department of Environmental Conservation | Contract not subject to state pre-auditNot pre-audited | D008727 | Oct 4, 2012to Aug 13, 2013 | Oct 4, 2012 | Aug 13, 2013 | $25,575$24,575 spent | $24,575 | |
Repair tube leak in boiler #2 great meadow CF DEC028HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC028H | Sep 17, 2012to Apr 25, 2013 | Sep 17, 2012 | Apr 25, 2013 | $300,000$67,677 spent | $67,677 | |
Repair leaking condensate return line and support structures sunmount ddso DEB983HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB983H | Jul 17, 2012to Nov 14, 2012 | Jul 17, 2012 | Nov 14, 2012 | $150,000$69,109 spent | $69,109 | |
Plumbing work for shower rehab in buildings 3 4 5 6 7 18 & 19 at franklin county CF D44267PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44267P | May 31, 2012to Mar 31, 2015 | May 31, 2012 | Mar 31, 2015 | $717,597$696,889 spent | $696,889 | |
Rehabilitate shower areas buildings 13 - 19 at main bare hill CF D44259PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44259P | May 21, 2012to Oct 14, 2014 | May 21, 2012 | Oct 14, 2014 | $697,010$654,669 spent | $654,669 |
Replace Defective Water Heaters Franklin CF Franklin CountyOffice of General Services - Design & ConstructionSep 23, 2015 – Jul 24, 2016$712,369
- Description
- Replace Defective Water Heaters Franklin CF Franklin County
- Contract number
- DM3060H
- Type
- Construction: BuildingConstruction
- Term
- Sep 23, 2015 → Jul 24, 201610 months
- Approved
- Sep 23, 2015
- Status
- Ended
- Amount
- $712,369
- Spent to date
- $704,056 · 99% of the amount
Replace fiberglass structure 43, sewage trtmt plant, altona CFOffice of General Services - Design & ConstructionMay 19, 2015 – Feb 13, 2016$161,161
- Description
- Replace fiberglass structure 43, sewage trtmt plant, altona CF
- Contract number
- D44930C
- Type
- Construction: BuildingConstruction
- Term
- May 19, 2015 → Feb 13, 20169 months
- Approved
- May 19, 2015
- Status
- Ended
- Amount
- $161,161
- Spent to date
- $148,934 · 92% of the amount
Emergency-Thaw & Restore Frozen Fire Protect Line-Upstate CFOffice of General Services - Design & ConstructionMar 18, 2015 – Jun 16, 2015$150,000
- Description
- Emergency-Thaw & Restore Frozen Fire Protect Line-Upstate CF
- Contract number
- DEC893P
- Type
- Construction: BuildingConstruction
- Term
- Mar 18, 2015 → Jun 16, 20153 months
- Approved
- Apr 22, 2015
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $20,692 · 14% of the amount
Job order contracting - area 4Office of General Services - Design & ConstructionJan 22, 2015 – Jan 20, 2017$500,000
- Description
- Job order contracting - area 4
- Contract number
- D45084H
- Type
- Construction: BuildingConstruction
- Term
- Jan 22, 2015 → Jan 20, 20172 years
- Approved
- Jan 22, 2015
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $496,552 · 99% of the amount
Job order contracting - area 4Office of General Services - Design & ConstructionJan 22, 2015 – Jan 20, 2017$500,000
- Description
- Job order contracting - area 4
- Contract number
- D45084P
- Type
- Construction: BuildingConstruction
- Term
- Jan 22, 2015 → Jan 20, 20172 years
- Approved
- Jan 22, 2015
- Status
- Ended
- Amount
- $500,000
- Spent to date
- $51,963 · 10% of the amount
Replace failed domestic water heaters franklin CF malone franklin countyOffice of General Services - Design & ConstructionOct 6, 2014 – Apr 30, 2015$300,000
- Description
- Replace failed domestic water heaters franklin CF malone franklin county
- Contract number
- DEC736P
- Type
- Construction: BuildingConstruction
- Term
- Oct 6, 2014 → Apr 30, 20157 months
- Approved
- Oct 23, 2014
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $250,401 · 83% of the amount
Hawkins hall food venue projecCollege at PlattsburghJun 5, 2014 – Aug 15, 2014$560,239
- Description
- Hawkins hall food venue projec
- Contract number
- T000519
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Plattsburgh
- Term
- Jun 5, 2014 → Aug 15, 20142 months
- Approved
- Jun 7, 2014
- Status
- Ended
- Amount
- $560,239
- Spent to date
- $397,854 · 71% of the amount
Replace annex water main clinton county CFOffice of General Services - Design & ConstructionJun 2, 2014 – Nov 9, 2015$368,763
- Description
- Replace annex water main clinton county CF
- Contract number
- D44709P
- Type
- Construction: BuildingConstruction
- Term
- Jun 2, 2014 → Nov 9, 201517 months
- Approved
- Jun 2, 2014
- Status
- Ended
- Amount
- $368,763
- Spent to date
- $357,882 · 97% of the amount
Replace feedwater tank ? powerhouse building 13 adirondack CFOffice of General Services - Design & ConstructionApr 16, 2014 – Jul 31, 2016$606,682
- Description
- Replace feedwater tank ? powerhouse building 13 adirondack CF
- Contract number
- D44707H
- Type
- Construction: BuildingConstruction
- Term
- Apr 16, 2014 → Jul 31, 20162.3 years
- Approved
- Apr 16, 2014
- Status
- Ended
- Amount
- $606,682
- Spent to date
- $606,595 · 100% of the amount
Replace chillers infirmary building franklin CFOffice of General Services - Design & ConstructionFeb 24, 2014 – Nov 21, 2014$143,143
- Description
- Replace chillers infirmary building franklin CF
- Contract number
- DM3035H
- Type
- Construction: BuildingConstruction
- Term
- Feb 24, 2014 → Nov 21, 20149 months
- Approved
- Feb 24, 2014
- Status
- Ended
- Amount
- $143,143
- Spent to date
- $126,743 · 89% of the amount
Replace observation tower HVAC clinton CFOffice of General Services - Design & ConstructionNov 29, 2013 – Dec 13, 2015$50,660
- Description
- Replace observation tower HVAC clinton CF
- Contract number
- D44508H
- Type
- Construction: BuildingConstruction
- Term
- Nov 29, 2013 → Dec 13, 20152 years
- Approved
- Nov 29, 2013
- Status
- Ended
- Amount
- $50,660
- Spent to date
- $50,638 · 100% of the amount
Banks hall kitchen ventilationCollege at PlattsburghMay 20, 2013 – Aug 2, 2013$179,179
- Description
- Banks hall kitchen ventilation
- Contract number
- T000501
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Plattsburgh
- Term
- May 20, 2013 → Aug 2, 20132 months
- Approved
- Apr 30, 2013
- Status
- Ended
- Amount
- $179,179
- Spent to date
- $171,965 · 96% of the amount
Replace boiler building 14 altona CF HVACOffice of General Services - Design & ConstructionApr 12, 2013 – Aug 17, 2015$627,616
- Description
- Replace boiler building 14 altona CF HVAC
- Contract number
- D44516H
- Type
- Construction: BuildingConstruction
- Term
- Apr 12, 2013 → Aug 17, 20152.3 years
- Approved
- Apr 12, 2013
- Status
- Ended
- Amount
- $627,616
- Spent to date
- $614,622 · 98% of the amount
Provide & upgrade existing natural gas HVAC components bare hill CF & franklin CF & upstate CFOffice of General Services - Design & ConstructionNov 20, 2012 – Dec 29, 2017$2,777,706
- Description
- Provide & upgrade existing natural gas HVAC components bare hill CF & franklin CF & upstate CF
- Contract number
- DQ1507H
- Type
- Construction: MiscellaneousConstruction
- Term
- Nov 20, 2012 → Dec 29, 20175.1 years
- Approved
- Nov 20, 2012
- Status
- Ended
- Amount
- $2,777,706
- Spent to date
- $2,776,710 · 100% of the amount
Lake luzerne campground shower buildings warren countyDepartment of Environmental ConservationOct 11, 2012 – Aug 13, 2013$175,175
- Description
- Lake luzerne campground shower buildings warren county
- Contract number
- D008726
- Type
- Construction: BuildingConstruction
- Term
- Oct 11, 2012 → Aug 13, 201310 months
- Approved
- Oct 11, 2012
- Status
- Ended
- Amount
- $175,175
- Spent to date
- $168,121 · 96% of the amount
Lake luzerne CG shower buildinDepartment of Environmental ConservationOct 4, 2012 – Aug 13, 2013$25,575
- Description
- Lake luzerne CG shower buildin
- Contract number
- D008727
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 4, 2012 → Aug 13, 201310 months
- Approved
- Sep 27, 2012
- Status
- Ended
- Amount
- $25,575
- Spent to date
- $24,575 · 96% of the amount
Repair tube leak in boiler #2 great meadow CFOffice of General Services - Design & ConstructionSep 17, 2012 – Apr 25, 2013$300,000
- Description
- Repair tube leak in boiler #2 great meadow CF
- Contract number
- DEC028H
- Type
- Construction: BuildingConstruction
- Term
- Sep 17, 2012 → Apr 25, 20137 months
- Approved
- Nov 2, 2012
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $67,677 · 23% of the amount
Repair leaking condensate return line and support structures sunmount ddsoOffice of General Services - Design & ConstructionJul 17, 2012 – Nov 14, 2012$150,000
- Description
- Repair leaking condensate return line and support structures sunmount ddso
- Contract number
- DEB983H
- Type
- Construction: BuildingConstruction
- Term
- Jul 17, 2012 → Nov 14, 20124 months
- Approved
- Aug 23, 2012
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $69,109 · 46% of the amount
Plumbing work for shower rehab in buildings 3 4 5 6 7 18 & 19 at franklin county CFOffice of General Services - Design & ConstructionMay 31, 2012 – Mar 31, 2015$717,597
- Description
- Plumbing work for shower rehab in buildings 3 4 5 6 7 18 & 19 at franklin county CF
- Contract number
- D44267P
- Type
- Construction: BuildingConstruction
- Term
- May 31, 2012 → Mar 31, 20152.8 years
- Approved
- May 31, 2012
- Status
- Ended
- Amount
- $717,597
- Spent to date
- $696,889 · 97% of the amount
Rehabilitate shower areas buildings 13 - 19 at main bare hill CFOffice of General Services - Design & ConstructionMay 21, 2012 – Oct 14, 2014$697,010
- Description
- Rehabilitate shower areas buildings 13 - 19 at main bare hill CF
- Contract number
- D44259P
- Type
- Construction: BuildingConstruction
- Term
- May 21, 2012 → Oct 14, 20142.4 years
- Approved
- May 21, 2012
- Status
- Ended
- Amount
- $697,010
- Spent to date
- $654,669 · 94% of the amount
Contract-type mix
Share of contract value by type
- Construction26 contracts$11.3M
- Contract not subject to state pre-audit5 contracts$1.1M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 3 contracts, $148.0K | 3 |
| 2010: 4 contracts, $1.6M | 4 |
| 2011: 2 contracts, $541.5K | 2 |
| 2012: 9 contracts, $5.3M | 9 |
| 2013: 3 contracts, $857.5K | 3 |
| 2014: 5 contracts, $2.0M | 5 |
| 2015: 5 contracts, $2.0M | 5 |
| 2016: 0 contracts, $0.0 | 0 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 73/100): $12M in contracts, works with 4 agencies; but no contract since 2015.
- Contract volume+11.0measured
$12M in current contract value across 31 contracts, more than 87% of scored contractors.
- Recent activity−4.1measured
No active contracts today; the most recent was approved in September 2015.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+1.8measured
First contract started in February 2009 (17 years of contract history).
- Contract-type mix+5.9measured
3 contract types; the largest group is construction (91% of value). Goods and services contracts are 91% of the total.
- Spending vs. value−0.1measured
On 31 completed contracts with spending recorded, spending is 88% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 73 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Weydman Electric Inc
Tonawanda, NYConstruction & Renovation
Since 200810 agencies
- Contract value
- $34.4M
- Contracts
- 44
- Active
- 7
- B
Steven E Fuller Excavating Inc
Keeseville, NYConstruction & Renovation
Since 20095 agencies
- Contract value
- $4.4M
- Contracts
- 14
- Active
- 0
- A
LH Laplante Company Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $43.4M
- Contracts
- 68
- Active
- 4
- A
Dow Electric Inc
Malone, NYConstruction & Renovation
Since 200810 agencies
- Contract value
- $71.1M
- Contracts
- 116
- Active
- 5
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
Luck Brothers Inc
Construction & Renovation
Since 20068 agencies
- Contract value
- $248.1M
- Contracts
- 78
- Active
- 6
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- College at Plattsburgh contractors
- Department of Environmental Conservation contractors
- State University Construction Fund contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.