Brownell Electric Corp
AState contracts since 2008Updated Nov 13, 2026
Brownell Electric Corp holds 32 contracts worth $7.1M with 2 New York State agencies, most with Office of General Services - Design & Construction; 2 active today. The first started in 2008.
- Total contract value
- $7.1M
- Current contract amounts
- Spent to date
- $3.9M
- 56% of contract value
- Active contracts
- 2
- $1.4M in active value
- Contracts on record
- 32
- Since 2008
- Agencies served
- 2
- Most with Office of General Services - Design & Construction
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Contracts
32 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Provide alterations Office of the Adjutant General Area DMNA Headquarters in Albany County D46234EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46234E | Sep 18, 2026to May 4, 2028 | Sep 18, 2026 | May 4, 2028 | $824,000$0 spent | $0 | |
Replace heat pumps mezzanine floor and floors 15-16 Ten Eyck Office Building Albany Albany County D47334EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47334E | Aug 21, 2025to Dec 1, 2027 | Aug 21, 2025 | Dec 1, 2027 | $560,000$343,665 spent | $343,665 | |
Restore heat Ten Eyck Office Building Albany County DEF449EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF449E | Oct 28, 2025to Feb 25, 2026 | Oct 28, 2025 | Feb 25, 2026 | $300,000$66,999 spent | $66,999 | |
Replace steam line and alternate heat source at multiple bldgs Washington CF Washington County D47532EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47532E | Jun 18, 2025to May 12, 2026 | Jun 18, 2025 | May 12, 2026 | $290,328$273,917 spent | $273,917 | |
Replace hot water storage tank in Building 8 at Washington Correctional Facility in Washington Co DQ1890EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1890E | Mar 5, 2025to Jan 5, 2026 | Mar 5, 2025 | Jan 5, 2026 | $14,900$13,000 spent | $13,000 | |
Restore flood damage at the Education Building in Albany County DEF307EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF307E | Feb 11, 2025to Oct 9, 2025 | Feb 11, 2025 | Oct 9, 2025 | $300,000$137,000 spent | $137,000 | |
Provide heated sidewalk electrical at 625 Broadway State Office Building in Albany County D47512EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47512E | Jun 25, 2024to Mar 20, 2025 | Jun 25, 2024 | Mar 20, 2025 | $88,836$79,000 spent | $79,000 | |
Repair Switchgear Great Meadow Correctional Facility in Washington County DEF171EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF171E | Apr 2, 2024to Jul 31, 2024 | Apr 2, 2024 | Jul 31, 2024 | $150,000$115,046 spent | $115,046 | |
Provide Modifications SOEK Storage Facility Washington Correctional Annex Bldg in Washington County D47406EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47406E | Feb 28, 2024to Mar 31, 2025 | Feb 28, 2024 | Mar 31, 2025 | $427,000$391,767 spent | $391,767 | |
Provide structural repairs at the Sheridan Hollow Parking Facility Albany County D46095EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46095E | Jun 20, 2023to Oct 29, 2025 | Jun 20, 2023 | Oct 29, 2025 | $234,084$228,334 spent | $228,334 | |
Replace HVAC system Building #1 Capital District Psychiatric Center Albany County D45595EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45595E | Feb 20, 2021to Oct 17, 2024 | Feb 20, 2021 | Oct 17, 2024 | $518,856$518,856 spent | $518,856 | |
Provide Building Alterations f DEE305EContract not subject to state pre-audit | Office of General Services - Design & Construction | Contract not subject to state pre-auditNot pre-audited | DEE305E | Mar 26, 2020to Oct 23, 2020 | Mar 26, 2020 | Oct 23, 2020 | $300,000$94,855 spent | $94,855 | |
Remediate Water Infiltration Of HV Switchgear Elecrical Ten Eyck OB Albany County DEE246EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE246E | Dec 18, 2019to May 30, 2020 | Dec 18, 2019 | May 30, 2020 | $600,000$75,353 spent | $75,353 | |
Rehab Restrooms Bldg 1 Capital District Psychiatric Center Albany County D45790EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45790E | Oct 29, 2019to Jan 22, 2022 | Oct 29, 2019 | Jan 22, 2022 | $202,337$187,335 spent | $187,335 | |
Renovate HVAC System Ten Eyck Office Building Albany County D45584EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45584E | Jun 5, 2019to Aug 27, 2020 | Jun 5, 2019 | Aug 27, 2020 | $239,000$223,591 spent | $223,591 | |
Rehabilitate Concession Stand Beach Bathhouse Moreau Lake State Park (E) D005408Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005408 | Mar 13, 2019to Dec 27, 2019 | Mar 13, 2019 | Dec 27, 2019 | $46,129$46,129 spent | $46,129 | |
Repair & Replace HVAC System Brookwood Secure Center Columbia County E D45460EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45460E | Aug 29, 2018to Oct 18, 2019 | Aug 29, 2018 | Oct 18, 2019 | $123,300$108,769 spent | $108,769 | |
Roosevelt II Bathhouse Rehab Saratoga Spa State Park Saratoga County (E) D005264Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005264 | Feb 27, 2018to Dec 24, 2018 | Feb 27, 2018 | Dec 24, 2018 | $296,500$104,658 spent | $104,658 | |
Repair UPS system, Bldg. 1/3,Upstate CF DED383EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED383E | Dec 20, 2016to May 31, 2017 | Dec 20, 2016 | May 31, 2017 | $300,000$95,735 spent | $95,735 | |
Renovate medical clinic, brookwood SC, columbia county D44810EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44810E | Sep 15, 2016to Nov 11, 2017 | Sep 15, 2016 | Nov 11, 2017 | $161,600$161,504 spent | $161,504 |
Provide alterations Office of the Adjutant General Area DMNA Headquarters in Albany CountyOffice of General Services - Design & ConstructionSep 18, 2026 – May 4, 2028Active$824,000
- Description
- Provide alterations Office of the Adjutant General Area DMNA Headquarters in Albany County
- Contract number
- D46234E
- Type
- Construction: BuildingConstruction
- Term
- Sep 18, 2026 → May 4, 20281.7 years
- Approved
- Sep 18, 2026
- Status
- Active
- Amount
- $824,000
- Spent to date
- $0 · 0% of the amount
Replace heat pumps mezzanine floor and floors 15-16 Ten Eyck Office Building Albany Albany CountyOffice of General Services - Design & ConstructionAug 21, 2025 – Dec 1, 2027Active$560,000
- Description
- Replace heat pumps mezzanine floor and floors 15-16 Ten Eyck Office Building Albany Albany County
- Contract number
- D47334E
- Type
- Construction: BuildingConstruction
- Term
- Aug 21, 2025 → Dec 1, 20272.3 years
- Approved
- Aug 21, 2025
- Status
- Active
- Amount
- $560,000
- Spent to date
- $343,665 · 61% of the amount
Restore heat Ten Eyck Office Building Albany CountyOffice of General Services - Design & ConstructionOct 28, 2025 – Feb 25, 2026$300,000
- Description
- Restore heat Ten Eyck Office Building Albany County
- Contract number
- DEF449E
- Type
- Construction: BuildingConstruction
- Term
- Oct 28, 2025 → Feb 25, 20264 months
- Approved
- Dec 4, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $66,999 · 22% of the amount
Replace steam line and alternate heat source at multiple bldgs Washington CF Washington CountyOffice of General Services - Design & ConstructionJun 18, 2025 – May 12, 2026$290,328
- Description
- Replace steam line and alternate heat source at multiple bldgs Washington CF Washington County
- Contract number
- D47532E
- Type
- Construction: BuildingConstruction
- Term
- Jun 18, 2025 → May 12, 202611 months
- Approved
- Jun 18, 2025
- Status
- Ended
- Amount
- $290,328
- Spent to date
- $273,917 · 94% of the amount
Replace hot water storage tank in Building 8 at Washington Correctional Facility in Washington CoOffice of General Services - Design & ConstructionMar 5, 2025 – Jan 5, 2026$14,900
- Description
- Replace hot water storage tank in Building 8 at Washington Correctional Facility in Washington Co
- Contract number
- DQ1890E
- Type
- Construction: BuildingConstruction
- Term
- Mar 5, 2025 → Jan 5, 202610 months
- Approved
- Mar 5, 2025
- Status
- Ended
- Amount
- $14,900
- Spent to date
- $13,000 · 87% of the amount
Restore flood damage at the Education Building in Albany CountyOffice of General Services - Design & ConstructionFeb 11, 2025 – Oct 9, 2025$300,000
- Description
- Restore flood damage at the Education Building in Albany County
- Contract number
- DEF307E
- Type
- Construction: BuildingConstruction
- Term
- Feb 11, 2025 → Oct 9, 20258 months
- Approved
- Mar 19, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $137,000 · 46% of the amount
Provide heated sidewalk electrical at 625 Broadway State Office Building in Albany CountyOffice of General Services - Design & ConstructionJun 25, 2024 – Mar 20, 2025$88,836
- Description
- Provide heated sidewalk electrical at 625 Broadway State Office Building in Albany County
- Contract number
- D47512E
- Type
- Construction: BuildingConstruction
- Term
- Jun 25, 2024 → Mar 20, 20259 months
- Approved
- Jun 25, 2024
- Status
- Ended
- Amount
- $88,836
- Spent to date
- $79,000 · 89% of the amount
Repair Switchgear Great Meadow Correctional Facility in Washington CountyOffice of General Services - Design & ConstructionApr 2, 2024 – Jul 31, 2024$150,000
- Description
- Repair Switchgear Great Meadow Correctional Facility in Washington County
- Contract number
- DEF171E
- Type
- Construction: BuildingConstruction
- Term
- Apr 2, 2024 → Jul 31, 20244 months
- Approved
- Apr 18, 2024
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $115,046 · 77% of the amount
Provide Modifications SOEK Storage Facility Washington Correctional Annex Bldg in Washington CountyOffice of General Services - Design & ConstructionFeb 28, 2024 – Mar 31, 2025$427,000
- Description
- Provide Modifications SOEK Storage Facility Washington Correctional Annex Bldg in Washington County
- Contract number
- D47406E
- Type
- Construction: BuildingConstruction
- Term
- Feb 28, 2024 → Mar 31, 202513 months
- Approved
- Feb 28, 2024
- Status
- Ended
- Amount
- $427,000
- Spent to date
- $391,767 · 92% of the amount
Provide structural repairs at the Sheridan Hollow Parking Facility Albany CountyOffice of General Services - Design & ConstructionJun 20, 2023 – Oct 29, 2025$234,084
- Description
- Provide structural repairs at the Sheridan Hollow Parking Facility Albany County
- Contract number
- D46095E
- Type
- Construction: BuildingConstruction
- Term
- Jun 20, 2023 → Oct 29, 20252.3 years
- Approved
- Jun 20, 2023
- Status
- Ended
- Amount
- $234,084
- Spent to date
- $228,334 · 98% of the amount
Replace HVAC system Building #1 Capital District Psychiatric Center Albany CountyOffice of General Services - Design & ConstructionFeb 20, 2021 – Oct 17, 2024$518,856
- Description
- Replace HVAC system Building #1 Capital District Psychiatric Center Albany County
- Contract number
- D45595E
- Type
- Construction: BuildingConstruction
- Term
- Feb 20, 2021 → Oct 17, 20243.7 years
- Approved
- Feb 20, 2021
- Status
- Ended
- Amount
- $518,856
- Spent to date
- $518,856 · 100% of the amount
Provide Building Alterations fOffice of General Services - Design & ConstructionMar 26, 2020 – Oct 23, 2020$300,000
- Description
- Provide Building Alterations f
- Contract number
- DEE305E
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 26, 2020 → Oct 23, 20207 months
- Approved
- Jun 10, 2020
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $94,855 · 32% of the amount
Remediate Water Infiltration Of HV Switchgear Elecrical Ten Eyck OB Albany CountyOffice of General Services - Design & ConstructionDec 18, 2019 – May 30, 2020$600,000
- Description
- Remediate Water Infiltration Of HV Switchgear Elecrical Ten Eyck OB Albany County
- Contract number
- DEE246E
- Type
- Construction: BuildingConstruction
- Term
- Dec 18, 2019 → May 30, 20205 months
- Approved
- Jan 28, 2020
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $75,353 · 13% of the amount
Rehab Restrooms Bldg 1 Capital District Psychiatric Center Albany CountyOffice of General Services - Design & ConstructionOct 29, 2019 – Jan 22, 2022$202,337
- Description
- Rehab Restrooms Bldg 1 Capital District Psychiatric Center Albany County
- Contract number
- D45790E
- Type
- Construction: BuildingConstruction
- Term
- Oct 29, 2019 → Jan 22, 20222.3 years
- Approved
- Oct 29, 2019
- Status
- Ended
- Amount
- $202,337
- Spent to date
- $187,335 · 93% of the amount
Renovate HVAC System Ten Eyck Office Building Albany CountyOffice of General Services - Design & ConstructionJun 5, 2019 – Aug 27, 2020$239,000
- Description
- Renovate HVAC System Ten Eyck Office Building Albany County
- Contract number
- D45584E
- Type
- Construction: BuildingConstruction
- Term
- Jun 5, 2019 → Aug 27, 202015 months
- Approved
- Jun 5, 2019
- Status
- Ended
- Amount
- $239,000
- Spent to date
- $223,591 · 94% of the amount
Rehabilitate Concession Stand Beach Bathhouse Moreau Lake State Park (E)Office of Parks Recreation & Historic PreservationMar 13, 2019 – Dec 27, 2019$46,129
- Description
- Rehabilitate Concession Stand Beach Bathhouse Moreau Lake State Park (E)
- Contract number
- D005408
- Type
- Construction: BuildingConstruction
- Term
- Mar 13, 2019 → Dec 27, 20199 months
- Approved
- Mar 13, 2019
- Status
- Ended
- Amount
- $46,129
- Spent to date
- $46,129 · 100% of the amount
Repair & Replace HVAC System Brookwood Secure Center Columbia County EOffice of General Services - Design & ConstructionAug 29, 2018 – Oct 18, 2019$123,300
- Description
- Repair & Replace HVAC System Brookwood Secure Center Columbia County E
- Contract number
- D45460E
- Type
- Construction: BuildingConstruction
- Term
- Aug 29, 2018 → Oct 18, 201914 months
- Approved
- Aug 29, 2018
- Status
- Ended
- Amount
- $123,300
- Spent to date
- $108,769 · 88% of the amount
Roosevelt II Bathhouse Rehab Saratoga Spa State Park Saratoga County (E)Office of Parks Recreation & Historic PreservationFeb 27, 2018 – Dec 24, 2018$296,500
- Description
- Roosevelt II Bathhouse Rehab Saratoga Spa State Park Saratoga County (E)
- Contract number
- D005264
- Type
- Construction: BuildingConstruction
- Term
- Feb 27, 2018 → Dec 24, 201810 months
- Approved
- Feb 27, 2018
- Status
- Ended
- Amount
- $296,500
- Spent to date
- $104,658 · 35% of the amount
Repair UPS system, Bldg. 1/3,Upstate CFOffice of General Services - Design & ConstructionDec 20, 2016 – May 31, 2017$300,000
- Description
- Repair UPS system, Bldg. 1/3,Upstate CF
- Contract number
- DED383E
- Type
- Construction: BuildingConstruction
- Term
- Dec 20, 2016 → May 31, 20175 months
- Approved
- Feb 14, 2017
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $95,735 · 32% of the amount
Renovate medical clinic, brookwood SC, columbia countyOffice of General Services - Design & ConstructionSep 15, 2016 – Nov 11, 2017$161,600
- Description
- Renovate medical clinic, brookwood SC, columbia county
- Contract number
- D44810E
- Type
- Construction: BuildingConstruction
- Term
- Sep 15, 2016 → Nov 11, 201714 months
- Approved
- Sep 15, 2016
- Status
- Ended
- Amount
- $161,600
- Spent to date
- $161,504 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building30 contracts$6.8M
- Contract not subject to state pre-audit2 contracts$320.6K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 2 contracts, $195.4K | 2 |
| 2009: 0 contracts, $0.0 | 0 |
| 2010: 3 contracts, $406.6K | 3 |
| 2011: 1 contracts, $150.0K | 1 |
| 2012: 1 contracts, $41.6K | 1 |
| 2013: 1 contracts, $50.0K | 1 |
| 2014: 3 contracts, $257.3K | 3 |
| 2015: 1 contracts, $20.6K | 1 |
| 2016: 2 contracts, $461.6K | 2 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 2 contracts, $419.8K | 2 |
| 2019: 4 contracts, $1.1M | 4 |
| 2020: 1 contracts, $300.0K | 1 |
| 2021: 1 contracts, $518.9K | 1 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 1 contracts, $234.1K | 1 |
| 2024: 3 contracts, $665.8K | 3 |
| 2025: 5 contracts, $1.5M | 5 |
| 2026: 1 contracts, $824.0K | 1 |
How the Contractor Score adds up
Extensive (A, 84/100): 2 active contracts, $7.1M in contracts.
- Contract volume+9.2measured
$7.1M in current contract value across 32 contracts, more than 83% of scored contractors.
- Recent activity+14.8measured
2 active contracts today; the most recent was approved in September 2026.
- Agency breadth+4.3measured
Contracts with 2 different state agencies and facilities.
- Experience+2.0measured
First contract started in July 2008 (18 years of contract history).
- Contract-type mix+5.0measured
2 contract types; the largest group is construction (95% of value). Goods and services contracts are 95% of the total.
- Spending vs. value−0.8measured
On 30 completed contracts with spending recorded, spending is 63% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 84 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- B
Grove Roofing Services Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $7.1M
- Contracts
- 19
- Active
- 0
- B
Gerards Plumbing & Heating Corp
Construction & Renovation
Since 20102 agencies
- Contract value
- $7.2M
- Contracts
- 20
- Active
- 1
- B
F W Construction Corp
Construction & Renovation
Since 20063 agencies
- Contract value
- $7.3M
- Contracts
- 12
- Active
- 0
- B
Con-Tech Construction Technology Inc
Construction & Renovation
Since 20103 agencies
- Contract value
- $7.3M
- Contracts
- 26
- Active
- 0
- A
Peter J Catanzaro Inc
Brooklyn, NYConstruction & Renovation
Since 20072 agencies
- Contract value
- $6.9M
- Contracts
- 24
- Active
- 1
- B
Branon Construction Co Inc
Construction & Renovation
Since 20114 agencies
- Contract value
- $7.4M
- Contracts
- 8
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.