Gerards Plumbing & Heating Corp
BState contracts since 2010Updated Nov 13, 2026
Gerards Plumbing & Heating Corp holds 20 contracts worth $7.2M with 2 New York State agencies, most with Office of General Services - Design & Construction; 1 active today. The first started in 2010.
- Total contract value
- $7.2M
- Current contract amounts
- Spent to date
- $6.0M
- 84% of contract value
- Active contracts
- 1
- $1.3M in active value
- Contracts on record
- 20
- Since 2010
- Agencies served
- 2
- Most with Office of General Services - Design & Construction
- Years active
- 16
- First contract 2010
Contact & company
Business information and how to reach the company.
Contracts
20 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Provide Temporary Kitchen & Replace Floors Bldg 144 Cook Chill Production Center Rockland County DQ1707HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1707H | Jun 5, 2019to Dec 29, 2026 | Jun 5, 2019 | Dec 29, 2026 | $1,327,579$1,159,766 spent | $1,159,766 | |
Aquatics locker room plumbing rehabilitation Denny Farrell Riverbank SP New York County D006054Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006054 | May 23, 2023to May 31, 2024 | May 23, 2023 | May 31, 2024 | $1,530,292$1,526,652 spent | $1,526,652 | |
Repair failed sewer line South Beach PC Richmond County Region 2 DEE810PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE810P | Apr 13, 2022to Aug 11, 2022 | Apr 13, 2022 | Aug 11, 2022 | $250,000$40,874 spent | $40,874 | |
Repairs and testing of gas lines Riverbank SP DEE546PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE546P | Mar 11, 2021to Mar 31, 2022 | Mar 11, 2021 | Mar 31, 2022 | $475,000$457,766 spent | $457,766 | |
Repair water line Edgecombe Correctional Facility New York county DEE453PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE453P | Oct 14, 2020to Apr 12, 2021 | Oct 14, 2020 | Apr 12, 2021 | $200,000$29,508 spent | $29,508 | |
Repair & Replace Domestic Hot Water Heater Bldg 144 Cook Chill Production Center Rockland County DEE285PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE285P | Feb 11, 2020to Jun 15, 2022 | Feb 11, 2020 | Jun 15, 2022 | $450,000$416,565 spent | $416,565 | |
Repair Sewer Line Annex Building 4 New York PI New York County DEE170PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE170P | Aug 28, 2019to Dec 26, 2019 | Aug 28, 2019 | Dec 26, 2019 | $75,000$15,862 spent | $15,862 | |
Repair Sanitary Sewer Bldg 6 South Beach PC Richmond County DEE122PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE122P | Jun 14, 2019to Dec 11, 2019 | Jun 14, 2019 | Dec 11, 2019 | $150,000$40,673 spent | $40,673 | |
Repair Hot Water Tank Failure Bldg 1 Kingsboro PC Kings County DEE093HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE093H | May 10, 2019to Nov 15, 2019 | May 10, 2019 | Nov 15, 2019 | $150,000$133,511 spent | $133,511 | |
Repair Replace AC Unit Dunlap Bldg 102 Equipment Room Manhattan PC NY County DEE067HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE067H | Apr 1, 2019to Sep 28, 2019 | Apr 1, 2019 | Sep 28, 2019 | $200,000$71,958 spent | $71,958 | |
Investigate & Repair/Replace Gas Lines Riverbank State Park New York County DED935PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED935P | Oct 4, 2018to Dec 31, 2021 | Oct 4, 2018 | Dec 31, 2021 | $600,000$599,789 spent | $599,789 | |
Repair / Replace Broken Roof Drain Bldg 19 Rockland PC Rockland County DED806PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED806P | Apr 24, 2018to Aug 22, 2018 | Apr 24, 2018 | Aug 22, 2018 | $75,000$16,621 spent | $16,621 | |
Repair Water Line Roof Top Holding Tank Lincoln CF New York County DED747PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED747P | Feb 13, 2018to Jun 20, 2018 | Feb 13, 2018 | Jun 20, 2018 | $150,000$98,023 spent | $98,023 | |
Rehabilitate Elevators Shirley Chisholm State Off. Bldg. Plumbing Kings County (P) D44780PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44780P | Aug 23, 2017to Oct 17, 2020 | Aug 23, 2017 | Oct 17, 2020 | $157,775$157,653 spent | $157,653 | |
Repair Broken Plumbing Line at South Beach PC Richmond County DED505PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED505P | May 31, 2017to Sep 28, 2017 | May 31, 2017 | Sep 28, 2017 | $80,000$73,015 spent | $73,015 | |
Replace Boiler Staten Island Armory - HVAC 2 Trades DQ1641HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1641H | Nov 28, 2016to Mar 23, 2018 | Nov 28, 2016 | Mar 23, 2018 | $993,260$951,987 spent | $951,987 | |
Repair & test leaking gas line bayview CF new york county DEC757PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC757P | Oct 24, 2014to Feb 21, 2015 | Oct 24, 2014 | Feb 21, 2015 | $125,000$102,181 spent | $102,181 | |
Repair broken natural gas line state armory 5TH ave new york county DEC184PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC184P | Jan 3, 2013to May 3, 2013 | Jan 3, 2013 | May 3, 2013 | $75,000$13,260 spent | $13,260 | |
Restore ruptured steam line building 20 south beach PC DEB425HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB425H | Dec 10, 2010to Oct 6, 2011 | Dec 10, 2010 | Oct 6, 2011 | $76,500$75,259 spent | $75,259 | |
Replace leaking domestic hot water heater BLDG 11 south beach PC DEB183PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB183P | Apr 8, 2010to Feb 5, 2011 | Apr 8, 2010 | Feb 5, 2011 | $75,000$57,800 spent | $57,800 |
Provide Temporary Kitchen & Replace Floors Bldg 144 Cook Chill Production Center Rockland CountyOffice of General Services - Design & ConstructionJun 5, 2019 – Dec 29, 2026Active$1,327,579
- Description
- Provide Temporary Kitchen & Replace Floors Bldg 144 Cook Chill Production Center Rockland County
- Contract number
- DQ1707H
- Type
- Construction: BuildingConstruction
- Term
- Jun 5, 2019 → Dec 29, 20267.6 years
- Approved
- Jun 5, 2019
- Status
- Active
- Amount
- $1,327,579
- Spent to date
- $1,159,766 · 87% of the amount
Aquatics locker room plumbing rehabilitation Denny Farrell Riverbank SP New York CountyOffice of Parks Recreation & Historic PreservationMay 23, 2023 – May 31, 2024$1,530,292
- Description
- Aquatics locker room plumbing rehabilitation Denny Farrell Riverbank SP New York County
- Contract number
- D006054
- Type
- Construction: BuildingConstruction
- Term
- May 23, 2023 → May 31, 202412 months
- Approved
- May 23, 2023
- Status
- Ended
- Amount
- $1,530,292
- Spent to date
- $1,526,652 · 100% of the amount
Repair failed sewer line South Beach PC Richmond County Region 2Office of General Services - Design & ConstructionApr 13, 2022 – Aug 11, 2022$250,000
- Description
- Repair failed sewer line South Beach PC Richmond County Region 2
- Contract number
- DEE810P
- Type
- Construction: BuildingConstruction
- Term
- Apr 13, 2022 → Aug 11, 20224 months
- Approved
- May 10, 2022
- Status
- Ended
- Amount
- $250,000
- Spent to date
- $40,874 · 16% of the amount
Repairs and testing of gas lines Riverbank SPOffice of General Services - Design & ConstructionMar 11, 2021 – Mar 31, 2022$475,000
- Description
- Repairs and testing of gas lines Riverbank SP
- Contract number
- DEE546P
- Type
- Construction: BuildingConstruction
- Term
- Mar 11, 2021 → Mar 31, 202213 months
- Approved
- Apr 30, 2021
- Status
- Ended
- Amount
- $475,000
- Spent to date
- $457,766 · 96% of the amount
Repair water line Edgecombe Correctional Facility New York countyOffice of General Services - Design & ConstructionOct 14, 2020 – Apr 12, 2021$200,000
- Description
- Repair water line Edgecombe Correctional Facility New York county
- Contract number
- DEE453P
- Type
- Construction: BuildingConstruction
- Term
- Oct 14, 2020 → Apr 12, 20216 months
- Approved
- Nov 27, 2020
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $29,508 · 15% of the amount
Repair & Replace Domestic Hot Water Heater Bldg 144 Cook Chill Production Center Rockland CountyOffice of General Services - Design & ConstructionFeb 11, 2020 – Jun 15, 2022$450,000
- Description
- Repair & Replace Domestic Hot Water Heater Bldg 144 Cook Chill Production Center Rockland County
- Contract number
- DEE285P
- Type
- Construction: BuildingConstruction
- Term
- Feb 11, 2020 → Jun 15, 20222.3 years
- Approved
- Mar 10, 2020
- Status
- Ended
- Amount
- $450,000
- Spent to date
- $416,565 · 93% of the amount
Repair Sewer Line Annex Building 4 New York PI New York CountyOffice of General Services - Design & ConstructionAug 28, 2019 – Dec 26, 2019$75,000
- Description
- Repair Sewer Line Annex Building 4 New York PI New York County
- Contract number
- DEE170P
- Type
- Construction: BuildingConstruction
- Term
- Aug 28, 2019 → Dec 26, 20194 months
- Approved
- Oct 11, 2019
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $15,862 · 21% of the amount
Repair Sanitary Sewer Bldg 6 South Beach PC Richmond CountyOffice of General Services - Design & ConstructionJun 14, 2019 – Dec 11, 2019$150,000
- Description
- Repair Sanitary Sewer Bldg 6 South Beach PC Richmond County
- Contract number
- DEE122P
- Type
- Construction: BuildingConstruction
- Term
- Jun 14, 2019 → Dec 11, 20196 months
- Approved
- Aug 19, 2019
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $40,673 · 27% of the amount
Repair Hot Water Tank Failure Bldg 1 Kingsboro PC Kings CountyOffice of General Services - Design & ConstructionMay 10, 2019 – Nov 15, 2019$150,000
- Description
- Repair Hot Water Tank Failure Bldg 1 Kingsboro PC Kings County
- Contract number
- DEE093H
- Type
- Construction: BuildingConstruction
- Term
- May 10, 2019 → Nov 15, 20196 months
- Approved
- Jul 10, 2019
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $133,511 · 89% of the amount
Repair Replace AC Unit Dunlap Bldg 102 Equipment Room Manhattan PC NY CountyOffice of General Services - Design & ConstructionApr 1, 2019 – Sep 28, 2019$200,000
- Description
- Repair Replace AC Unit Dunlap Bldg 102 Equipment Room Manhattan PC NY County
- Contract number
- DEE067H
- Type
- Construction: BuildingConstruction
- Term
- Apr 1, 2019 → Sep 28, 20196 months
- Approved
- May 30, 2019
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $71,958 · 36% of the amount
Investigate & Repair/Replace Gas Lines Riverbank State Park New York CountyOffice of General Services - Design & ConstructionOct 4, 2018 – Dec 31, 2021$600,000
- Description
- Investigate & Repair/Replace Gas Lines Riverbank State Park New York County
- Contract number
- DED935P
- Type
- Construction: BuildingConstruction
- Term
- Oct 4, 2018 → Dec 31, 20213.3 years
- Approved
- Oct 31, 2018
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $599,789 · 100% of the amount
Repair / Replace Broken Roof Drain Bldg 19 Rockland PC Rockland CountyOffice of General Services - Design & ConstructionApr 24, 2018 – Aug 22, 2018$75,000
- Description
- Repair / Replace Broken Roof Drain Bldg 19 Rockland PC Rockland County
- Contract number
- DED806P
- Type
- Construction: BuildingConstruction
- Term
- Apr 24, 2018 → Aug 22, 20184 months
- Approved
- Jun 14, 2018
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $16,621 · 22% of the amount
Repair Water Line Roof Top Holding Tank Lincoln CF New York CountyOffice of General Services - Design & ConstructionFeb 13, 2018 – Jun 20, 2018$150,000
- Description
- Repair Water Line Roof Top Holding Tank Lincoln CF New York County
- Contract number
- DED747P
- Type
- Construction: BuildingConstruction
- Term
- Feb 13, 2018 → Jun 20, 20184 months
- Approved
- Mar 19, 2018
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $98,023 · 65% of the amount
Rehabilitate Elevators Shirley Chisholm State Off. Bldg. Plumbing Kings County (P)Office of General Services - Design & ConstructionAug 23, 2017 – Oct 17, 2020$157,775
- Description
- Rehabilitate Elevators Shirley Chisholm State Off. Bldg. Plumbing Kings County (P)
- Contract number
- D44780P
- Type
- Construction: BuildingConstruction
- Term
- Aug 23, 2017 → Oct 17, 20203.2 years
- Approved
- Aug 23, 2017
- Status
- Ended
- Amount
- $157,775
- Spent to date
- $157,653 · 100% of the amount
Repair Broken Plumbing Line at South Beach PC Richmond CountyOffice of General Services - Design & ConstructionMay 31, 2017 – Sep 28, 2017$80,000
- Description
- Repair Broken Plumbing Line at South Beach PC Richmond County
- Contract number
- DED505P
- Type
- Construction: BuildingConstruction
- Term
- May 31, 2017 → Sep 28, 20174 months
- Approved
- Jul 5, 2017
- Status
- Ended
- Amount
- $80,000
- Spent to date
- $73,015 · 91% of the amount
Replace Boiler Staten Island Armory - HVAC 2 TradesOffice of General Services - Design & ConstructionNov 28, 2016 – Mar 23, 2018$993,260
- Description
- Replace Boiler Staten Island Armory - HVAC 2 Trades
- Contract number
- DQ1641H
- Type
- Construction: BuildingConstruction
- Term
- Nov 28, 2016 → Mar 23, 201816 months
- Approved
- Nov 28, 2016
- Status
- Ended
- Amount
- $993,260
- Spent to date
- $951,987 · 96% of the amount
Repair & test leaking gas line bayview CF new york countyOffice of General Services - Design & ConstructionOct 24, 2014 – Feb 21, 2015$125,000
- Description
- Repair & test leaking gas line bayview CF new york county
- Contract number
- DEC757P
- Type
- Construction: BuildingConstruction
- Term
- Oct 24, 2014 → Feb 21, 20154 months
- Approved
- Nov 21, 2014
- Status
- Ended
- Amount
- $125,000
- Spent to date
- $102,181 · 82% of the amount
Repair broken natural gas line state armory 5TH ave new york countyOffice of General Services - Design & ConstructionJan 3, 2013 – May 3, 2013$75,000
- Description
- Repair broken natural gas line state armory 5TH ave new york county
- Contract number
- DEC184P
- Type
- Construction: BuildingConstruction
- Term
- Jan 3, 2013 → May 3, 20134 months
- Approved
- Feb 21, 2013
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $13,260 · 18% of the amount
Restore ruptured steam line building 20 south beach PCOffice of General Services - Design & ConstructionDec 10, 2010 – Oct 6, 2011$76,500
- Description
- Restore ruptured steam line building 20 south beach PC
- Contract number
- DEB425H
- Type
- Construction: BuildingConstruction
- Term
- Dec 10, 2010 → Oct 6, 201110 months
- Approved
- Apr 29, 2011
- Status
- Ended
- Amount
- $76,500
- Spent to date
- $75,259 · 98% of the amount
Replace leaking domestic hot water heater BLDG 11 south beach PCOffice of General Services - Design & ConstructionApr 8, 2010 – Feb 5, 2011$75,000
- Description
- Replace leaking domestic hot water heater BLDG 11 south beach PC
- Contract number
- DEB183P
- Type
- Construction: BuildingConstruction
- Term
- Apr 8, 2010 → Feb 5, 201110 months
- Approved
- Aug 16, 2010
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $57,800 · 77% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building20 contracts$7.2M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2010: 2 contracts, $151.5K | 2 |
| 2011: 0 contracts, $0.0 | 0 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 1 contracts, $75.0K | 1 |
| 2014: 1 contracts, $125.0K | 1 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 1 contracts, $993.3K | 1 |
| 2017: 2 contracts, $237.8K | 2 |
| 2018: 3 contracts, $825.0K | 3 |
| 2019: 5 contracts, $1.9M | 5 |
| 2020: 2 contracts, $650.0K | 2 |
| 2021: 1 contracts, $475.0K | 1 |
| 2022: 1 contracts, $250.0K | 1 |
| 2023: 1 contracts, $1.5M | 1 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 76/100): $7.2M in contracts, 1 active contract.
- Contract volume+9.2measured
$7.2M in current contract value across 20 contracts, more than 83% of scored contractors.
- Recent activity+7.8measured
1 active contract today; the most recent was approved in May 2023.
- Agency breadth+4.3measured
Contracts with 2 different state agencies and facilities.
- Experience+1.5measured
First contract started in April 2010 (16 years of contract history).
- Contract-type mix+3.3measured
1 contract type; the largest group is construction (100% of value). Goods and services contracts are 100% of the total.
- Spending vs. value−0.3measured
On 19 completed contracts with spending recorded, spending is 83% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 76 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- B
F W Construction Corp
Construction & Renovation
Since 20063 agencies
- Contract value
- $7.3M
- Contracts
- 12
- Active
- 0
- B
Con-Tech Construction Technology Inc
Construction & Renovation
Since 20103 agencies
- Contract value
- $7.3M
- Contracts
- 26
- Active
- 0
- A
Brownell Electric Corp
Construction & Renovation
Since 20082 agencies
- Contract value
- $7.1M
- Contracts
- 32
- Active
- 2
- B
Branon Construction Co Inc
Construction & Renovation
Since 20114 agencies
- Contract value
- $7.4M
- Contracts
- 8
- Active
- 0
- B
Grove Roofing Services Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $7.1M
- Contracts
- 19
- Active
- 0
- B
Nichter Construction Inc
Construction & Renovation
Since 20115 agencies
- Contract value
- $7.5M
- Contracts
- 7
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.