Crescent Contracting Corp
AState contracts since 2007Updated Nov 13, 2026
Crescent Contracting Corp holds 40 contracts worth $28.7M with 3 New York State agencies, most with Office of General Services - Design & Construction; 1 active today. The first started in 2007.
- Total contract value
- $28.7M
- Current contract amounts
- Spent to date
- $15.5M
- 54% of contract value
- Active contracts
- 1
- $187.8K in active value
- Contracts on record
- 40
- Since 2007
- Agencies served
- 3
- Most with Office of General Services - Design & Construction
- Years active
- 19
- First contract 2007
Contact & company
Business information and how to reach the company.
Phone
Address
Contracts
40 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Upgrade elevators Buildings 81 & 82 & 83 Pilgrim PC Suffolk County D47130PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47130P | Sep 20, 2024to Sep 17, 2027 | Sep 20, 2024 | Sep 17, 2027 | $187,767$41,227 spent | $41,227 | |
Repair gas line leaks at Riverbank State Park in New York County DEF493PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF493P | Jan 12, 2026to Jul 11, 2026 | Jan 12, 2026 | Jul 11, 2026 | $400,000$5,583 spent | $5,583 | |
Replace grease trap & piping Building 144 Cook Chill Production Center Rockland County D47236PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47236P | Jul 13, 2023to Feb 1, 2025 | Jul 13, 2023 | Feb 1, 2025 | $616,253$595,853 spent | $595,853 | |
Purchase and installation of UV reactor at Roberto Clemente State Park OP31000Service: Other / misc. services | Office of Parks Recreation & Historic Preservation | Service: Other / misc. servicesService | OP31000 | Jun 19, 2023to Mar 31, 2024 | Jun 19, 2023 | Mar 31, 2024 | $145,369$145,369 spent | $145,369 | |
Remediate Campus for Asylum Se TEE998PContract not subject to state pre-audit | Office of General Services - Design & Construction | Contract not subject to state pre-auditNot pre-audited | TEE998P | May 22, 2023to Sep 18, 2024 | May 22, 2023 | Sep 18, 2024 | $300,000$186,230 spent | $186,230 | |
Plumbing and fire protection requirements contract D232023Construction: Standby contracts | City University Construction Fund | Construction: Standby contractsConstruction | D232023 | Apr 12, 2023to Dec 31, 2025 | Apr 12, 2023 | Dec 31, 2025 | $695,784$0 spent | $0 | |
Repair water line at Edgecombe Correctional Facility New York County DEE972PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE972P | Apr 10, 2023to Aug 8, 2023 | Apr 10, 2023 | Aug 8, 2023 | $100,000$14,053 spent | $14,053 | |
Repair cold water main Building 144 Cook Chill Production Center Rockland County DEE868PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE868P | Aug 31, 2022to Aug 26, 2023 | Aug 31, 2022 | Aug 26, 2023 | $75,000$46,897 spent | $46,897 | |
Job Order Contracting plumbing area 1 Bronx Kings Nassau NY Queens Richmond Suffolk Counties D47231PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47231P | Aug 1, 2022to Aug 1, 2025 | Aug 1, 2022 | Aug 1, 2025 | $750,000$95,969 spent | $95,969 | |
Repair steam system leaks Sing Sing CF Ossining Westchester County DEE833HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE833H | Jun 6, 2022to Apr 12, 2023 | Jun 6, 2022 | Apr 12, 2023 | $1,500,000$18,328 spent | $18,328 | |
Remove & replace water storage tank Queensboro CF Queens County D46068CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46068C | Aug 13, 2021to Apr 15, 2022 | Aug 13, 2021 | Apr 15, 2022 | $442,471$422,171 spent | $422,171 | |
Repair waste line Bldg 84 Taconic Correction Facility Westchester County DEE524PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE524P | Jan 26, 2021to May 26, 2021 | Jan 26, 2021 | May 26, 2021 | $75,000$0 spent | $0 | |
Restore Heat, Bldg 103 Manhattan PC DEE521PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE521P | Jan 21, 2021to Oct 15, 2021 | Jan 21, 2021 | Oct 15, 2021 | $300,000$99,939 spent | $99,939 | |
Investigate & Repair Broken Water Line Bldg 1 Edgecombe CF New York County DEE263PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE263P | Jan 9, 2020to May 8, 2020 | Jan 9, 2020 | May 8, 2020 | $100,000$21,687 spent | $21,687 | |
Repair Boiler Edgecombe CF New York County DEE188HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE188H | Oct 4, 2019to Nov 30, 2022 | Oct 4, 2019 | Nov 30, 2022 | $900,000$759,249 spent | $759,249 | |
Repair AC System Bldg 11 Bernard Fineson DDSO Queens County DED859HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED859H | Jul 3, 2018to Oct 31, 2018 | Jul 3, 2018 | Oct 31, 2018 | $200,000$60,685 spent | $60,685 | |
Repair Cast Iron Boiler HVAC, Whitestone Armory, Queens County DED589HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED589H | Sep 6, 2017to Feb 13, 2018 | Sep 6, 2017 | Feb 13, 2018 | $150,000$59,246 spent | $59,246 | |
Repair leaking water main, building 1, edgecomb CF DED390PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED390P | Dec 27, 2016to Apr 26, 2017 | Dec 27, 2016 | Apr 26, 2017 | $100,000$3,503 spent | $3,503 | |
Repair leaking HW lines, Blgd. 6, Sing Sing. DED301HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED301H | Sep 19, 2016to Apr 13, 2017 | Sep 19, 2016 | Apr 13, 2017 | $300,000$44,721 spent | $44,721 | |
Job Order Contracting - Area 1 Plumbing D45371PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45371P | Jun 6, 2016to Jun 5, 2019 | Jun 6, 2016 | Jun 5, 2019 | $750,000$131,622 spent | $131,622 |
Upgrade elevators Buildings 81 & 82 & 83 Pilgrim PC Suffolk CountyOffice of General Services - Design & ConstructionSep 20, 2024 – Sep 17, 2027Active$187,767
- Description
- Upgrade elevators Buildings 81 & 82 & 83 Pilgrim PC Suffolk County
- Contract number
- D47130P
- Type
- Construction: BuildingConstruction
- Term
- Sep 20, 2024 → Sep 17, 20273 years
- Approved
- Sep 20, 2024
- Status
- Active
- Amount
- $187,767
- Spent to date
- $41,227 · 22% of the amount
Repair gas line leaks at Riverbank State Park in New York CountyOffice of General Services - Design & ConstructionJan 12, 2026 – Jul 11, 2026$400,000
- Description
- Repair gas line leaks at Riverbank State Park in New York County
- Contract number
- DEF493P
- Type
- Construction: BuildingConstruction
- Term
- Jan 12, 2026 → Jul 11, 20266 months
- Approved
- Jan 27, 2026
- Status
- Ended
- Amount
- $400,000
- Spent to date
- $5,583 · 1% of the amount
Replace grease trap & piping Building 144 Cook Chill Production Center Rockland CountyOffice of General Services - Design & ConstructionJul 13, 2023 – Feb 1, 2025$616,253
- Description
- Replace grease trap & piping Building 144 Cook Chill Production Center Rockland County
- Contract number
- D47236P
- Type
- Construction: BuildingConstruction
- Term
- Jul 13, 2023 → Feb 1, 20251.6 years
- Approved
- Jul 13, 2023
- Status
- Ended
- Amount
- $616,253
- Spent to date
- $595,853 · 97% of the amount
Purchase and installation of UV reactor at Roberto Clemente State ParkOffice of Parks Recreation & Historic PreservationJun 19, 2023 – Mar 31, 2024$145,369
- Description
- Purchase and installation of UV reactor at Roberto Clemente State Park
- Contract number
- OP31000
- Type
- Service: Other / misc. servicesService
- Term
- Jun 19, 2023 → Mar 31, 20249 months
- Approved
- Oct 20, 2023
- Status
- Ended
- Amount
- $145,369
- Spent to date
- $145,369 · 100% of the amount
Remediate Campus for Asylum SeOffice of General Services - Design & ConstructionMay 22, 2023 – Sep 18, 2024$300,000
- Description
- Remediate Campus for Asylum Se
- Contract number
- TEE998P
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 22, 2023 → Sep 18, 202416 months
- Approved
- Jun 7, 2023
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $186,230 · 62% of the amount
Plumbing and fire protection requirements contractCity University Construction FundApr 12, 2023 – Dec 31, 2025$695,784
- Description
- Plumbing and fire protection requirements contract
- Contract number
- D232023
- Type
- Construction: Standby contractsConstruction
- Term
- Apr 12, 2023 → Dec 31, 20252.8 years
- Approved
- Apr 12, 2023
- Status
- Ended
- Amount
- $695,784
- Spent to date
- $0 · 0% of the amount
Repair water line at Edgecombe Correctional Facility New York CountyOffice of General Services - Design & ConstructionApr 10, 2023 – Aug 8, 2023$100,000
- Description
- Repair water line at Edgecombe Correctional Facility New York County
- Contract number
- DEE972P
- Type
- Construction: BuildingConstruction
- Term
- Apr 10, 2023 → Aug 8, 20234 months
- Approved
- Jun 1, 2023
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $14,053 · 14% of the amount
Repair cold water main Building 144 Cook Chill Production Center Rockland CountyOffice of General Services - Design & ConstructionAug 31, 2022 – Aug 26, 2023$75,000
- Description
- Repair cold water main Building 144 Cook Chill Production Center Rockland County
- Contract number
- DEE868P
- Type
- Construction: BuildingConstruction
- Term
- Aug 31, 2022 → Aug 26, 202312 months
- Approved
- Oct 7, 2022
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $46,897 · 63% of the amount
Job Order Contracting plumbing area 1 Bronx Kings Nassau NY Queens Richmond Suffolk CountiesOffice of General Services - Design & ConstructionAug 1, 2022 – Aug 1, 2025$750,000
- Description
- Job Order Contracting plumbing area 1 Bronx Kings Nassau NY Queens Richmond Suffolk Counties
- Contract number
- D47231P
- Type
- Construction: BuildingConstruction
- Term
- Aug 1, 2022 → Aug 1, 20253 years
- Approved
- Aug 1, 2022
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $95,969 · 13% of the amount
Repair steam system leaks Sing Sing CF Ossining Westchester CountyOffice of General Services - Design & ConstructionJun 6, 2022 – Apr 12, 2023$1,500,000
- Description
- Repair steam system leaks Sing Sing CF Ossining Westchester County
- Contract number
- DEE833H
- Type
- Construction: BuildingConstruction
- Term
- Jun 6, 2022 → Apr 12, 202310 months
- Approved
- Jul 21, 2022
- Status
- Ended
- Amount
- $1,500,000
- Spent to date
- $18,328 · 1% of the amount
Remove & replace water storage tank Queensboro CF Queens CountyOffice of General Services - Design & ConstructionAug 13, 2021 – Apr 15, 2022$442,471
- Description
- Remove & replace water storage tank Queensboro CF Queens County
- Contract number
- D46068C
- Type
- Construction: BuildingConstruction
- Term
- Aug 13, 2021 → Apr 15, 20228 months
- Approved
- Aug 13, 2021
- Status
- Ended
- Amount
- $442,471
- Spent to date
- $422,171 · 95% of the amount
Repair waste line Bldg 84 Taconic Correction Facility Westchester CountyOffice of General Services - Design & ConstructionJan 26, 2021 – May 26, 2021$75,000
- Description
- Repair waste line Bldg 84 Taconic Correction Facility Westchester County
- Contract number
- DEE524P
- Type
- Construction: BuildingConstruction
- Term
- Jan 26, 2021 → May 26, 20214 months
- Approved
- Apr 26, 2021
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $0 · 0% of the amount
Restore Heat, Bldg 103 Manhattan PCOffice of General Services - Design & ConstructionJan 21, 2021 – Oct 15, 2021$300,000
- Description
- Restore Heat, Bldg 103 Manhattan PC
- Contract number
- DEE521P
- Type
- Construction: BuildingConstruction
- Term
- Jan 21, 2021 → Oct 15, 20219 months
- Approved
- Apr 21, 2021
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $99,939 · 33% of the amount
Investigate & Repair Broken Water Line Bldg 1 Edgecombe CF New York CountyOffice of General Services - Design & ConstructionJan 9, 2020 – May 8, 2020$100,000
- Description
- Investigate & Repair Broken Water Line Bldg 1 Edgecombe CF New York County
- Contract number
- DEE263P
- Type
- Construction: BuildingConstruction
- Term
- Jan 9, 2020 → May 8, 20204 months
- Approved
- Feb 20, 2020
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $21,687 · 22% of the amount
Repair Boiler Edgecombe CF New York CountyOffice of General Services - Design & ConstructionOct 4, 2019 – Nov 30, 2022$900,000
- Description
- Repair Boiler Edgecombe CF New York County
- Contract number
- DEE188H
- Type
- Construction: BuildingConstruction
- Term
- Oct 4, 2019 → Nov 30, 20223.2 years
- Approved
- Dec 3, 2019
- Status
- Ended
- Amount
- $900,000
- Spent to date
- $759,249 · 84% of the amount
Repair AC System Bldg 11 Bernard Fineson DDSO Queens CountyOffice of General Services - Design & ConstructionJul 3, 2018 – Oct 31, 2018$200,000
- Description
- Repair AC System Bldg 11 Bernard Fineson DDSO Queens County
- Contract number
- DED859H
- Type
- Construction: BuildingConstruction
- Term
- Jul 3, 2018 → Oct 31, 20184 months
- Approved
- Sep 25, 2018
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $60,685 · 30% of the amount
Repair Cast Iron Boiler HVAC, Whitestone Armory, Queens CountyOffice of General Services - Design & ConstructionSep 6, 2017 – Feb 13, 2018$150,000
- Description
- Repair Cast Iron Boiler HVAC, Whitestone Armory, Queens County
- Contract number
- DED589H
- Type
- Construction: BuildingConstruction
- Term
- Sep 6, 2017 → Feb 13, 20185 months
- Approved
- Sep 29, 2017
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $59,246 · 39% of the amount
Repair leaking water main, building 1, edgecomb CFOffice of General Services - Design & ConstructionDec 27, 2016 – Apr 26, 2017$100,000
- Description
- Repair leaking water main, building 1, edgecomb CF
- Contract number
- DED390P
- Type
- Construction: BuildingConstruction
- Term
- Dec 27, 2016 → Apr 26, 20174 months
- Approved
- Feb 3, 2017
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $3,503 · 4% of the amount
Repair leaking HW lines, Blgd. 6, Sing Sing.Office of General Services - Design & ConstructionSep 19, 2016 – Apr 13, 2017$300,000
- Description
- Repair leaking HW lines, Blgd. 6, Sing Sing.
- Contract number
- DED301H
- Type
- Construction: BuildingConstruction
- Term
- Sep 19, 2016 → Apr 13, 20177 months
- Approved
- Oct 7, 2016
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $44,721 · 15% of the amount
Job Order Contracting - Area 1 PlumbingOffice of General Services - Design & ConstructionJun 6, 2016 – Jun 5, 2019$750,000
- Description
- Job Order Contracting - Area 1 Plumbing
- Contract number
- D45371P
- Type
- Construction: BuildingConstruction
- Term
- Jun 6, 2016 → Jun 5, 20193 years
- Approved
- Jun 6, 2016
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $131,622 · 18% of the amount
Contract-type mix
Share of contract value by type
- Construction35 contracts$23.0M
- Service2 contracts$3.6M
- Contract not subject to state pre-audit3 contracts$2.1M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $3.0M | 1 |
| 2008: 0 contracts, $0.0 | 0 |
| 2009: 1 contracts, $3.3M | 1 |
| 2010: 4 contracts, $4.6M | 4 |
| 2011: 3 contracts, $755.4K | 3 |
| 2012: 3 contracts, $4.7M | 3 |
| 2013: 1 contracts, $300.0K | 1 |
| 2014: 2 contracts, $1.7M | 2 |
| 2015: 2 contracts, $210.0K | 2 |
| 2016: 6 contracts, $3.2M | 6 |
| 2017: 1 contracts, $150.0K | 1 |
| 2018: 1 contracts, $200.0K | 1 |
| 2019: 1 contracts, $900.0K | 1 |
| 2020: 1 contracts, $100.0K | 1 |
| 2021: 3 contracts, $817.5K | 3 |
| 2022: 3 contracts, $2.3M | 3 |
| 2023: 5 contracts, $1.9M | 5 |
| 2024: 1 contracts, $187.8K | 1 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 1 contracts, $400.0K | 1 |
How the Contractor Score adds up
Extensive (A, 91/100): $29M in contracts, 1 active contract.
- Contract volume+13.7measured
$29M in current contract value across 40 contracts, more than 92% of scored contractors.
- Recent activity+11.8measured
1 active contract today; the most recent was approved in January 2026.
- Agency breadth+6.8measured
Contracts with 3 different state agencies and facilities.
- Experience+2.4measured
First contract started in March 2007 (19 years of contract history).
- Contract-type mix+7.5measured
6 contract types; the largest group is construction (80% of value). Goods and services contracts are 93% of the total.
- Spending vs. value−1.0measured
On 37 completed contracts with spending recorded, spending is 56% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 91 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Abcd Construction Corp
Brooklyn, NYConstruction & Renovation
Since 20085 agencies
- Contract value
- $59.0M
- Contracts
- 22
- Active
- 4
- B
T & R Alarm Electrical Systems Inc
Construction & Renovation
Since 20084 agencies
- Contract value
- $7.7M
- Contracts
- 15
- Active
- 0
- B
Ridley Electric Company Inc
Construction & Renovation
Since 20067 agencies
- Contract value
- $28.4M
- Contracts
- 18
- Active
- 0
- A
Project Eye Consultants Inc
Construction & Renovation
Since 20103 agencies
- Contract value
- $28.2M
- Contracts
- 20
- Active
- 1
- A
Kimble Inc
Elmira, NYConstruction & Renovation
Since 20123 agencies
- Contract value
- $27.8M
- Contracts
- 66
- Active
- 16
- A
Continental Construction LLC
Gouverneur, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $29.9M
- Contracts
- 69
- Active
- 2
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- City University Construction Fund contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.