Kimble Inc
AElmira, NY State contracts since 2012Updated Nov 13, 2026
Kimble Inc holds 66 contracts worth $27.8M with 3 New York State agencies, most with Office of General Services - Design & Construction; 16 active today. The first started in 2012.
- Total contract value
- $27.8M
- Current contract amounts
- Spent to date
- $17.9M
- 64% of contract value
- Active contracts
- 16
- $5.5M in active value
- Contracts on record
- 66
- Since 2012
- Agencies served
- 3
- Most with Office of General Services - Design & Construction
- Years active
- 14
- First contract 2012
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- Kimble, Inc
- Identifiers
- UEI UK9QYE2X1DQ2 · CAGE 8D9F8
- Federal registration
- Active · renews by Feb 2027
- In business since
- 1968
Industry codes (NAICS)
- 236220Commercial and Institutional Building Construction
Leadership
Chad Mosier
Vice President
Marco Bertron
President
Michael Ficarro
Corporate Secretary
Douglas Frederick
Accounting Manager
Greg Ficarro
Purchasing Manager
Joanne Benson
Office Manager
Liz Bouille-Sharma
Contracts Manager
Matt Hart
Project Manager
Matt Wickwire
Service Manager
Contracts
66 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Reconfigure bathrooms Bldgs 1,4,6,7 Elmira Psych Center Elmira Chemung County D47441HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47441H | Sep 11, 2026to Oct 28, 2028 | Sep 11, 2026 | Oct 28, 2028 | $138,000$0 spent | $0 | |
Replace reverse osmosis deionized water system Comstack Hall Cornell University in Tompkins County D016861Construction: BuildingActive | New York State Statutory College - Cornell University | Construction: BuildingConstruction | D016861 | Aug 29, 2026to Feb 25, 2028 | Aug 29, 2026 | Feb 25, 2028 | $574,400$0 spent | $0 | |
Replace water filtration system Kenneth Post Lab at Cornell University in Tompkins County D016840Construction: BuildingActive | New York State Statutory College - Cornell University | Construction: BuildingConstruction | D016840 | Aug 14, 2026to Feb 10, 2028 | Aug 14, 2026 | Feb 10, 2028 | $376,000$0 spent | $0 | |
Rehabilitate kitchen, dining hall and courtyard Fingerlakes Residential Center Tompkins County D47412PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47412P | Jul 9, 2026to Apr 25, 2029 | Jul 9, 2026 | Apr 25, 2029 | $733,300$19,248 spent | $19,248 | |
Replace roofs in buildings 2, 40 and 41 at Elmira Correctional Facility in Chemung County D47040HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47040H | Jun 15, 2026to Sep 5, 2027 | Jun 15, 2026 | Sep 5, 2027 | $237,000$8,729 spent | $8,729 | |
Replace roofs in buildings 2, 40 and 41 at Elmira Correctional Facility in Chemung County D47040PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47040P | Jun 5, 2026to Aug 26, 2027 | Jun 5, 2026 | Aug 26, 2027 | $74,400$5,225 spent | $5,225 | |
Provide temporary cooling Elmira Correctional Facility Chemung County DEF555HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF555H | May 5, 2026to Nov 1, 2027 | May 5, 2026 | Nov 1, 2027 | $500,000$162,341 spent | $162,341 | |
Rehabilitate Route 17 I86 rest area in Tioga County D47444PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47444P | Mar 27, 2026to Oct 2, 2027 | Mar 27, 2026 | Oct 2, 2027 | $263,000$128,261 spent | $128,261 | |
Electrical upgrades & backup generator Willard Drug Treatment Center Willard Seneca County DQ1891HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1891H | Jan 29, 2026to Feb 16, 2027 | Jan 29, 2026 | Feb 16, 2027 | $186,000$114,475 spent | $114,475 | |
Repair water supply system Dick Van Dyke Addiction Treatment Center Seneca County DEF490PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF490P | Jan 6, 2026to Nov 30, 2026 | Jan 6, 2026 | Nov 30, 2026 | $300,000$6,614 spent | $6,614 | |
Renovate 70 bedroom units and harden walls Finger Lakes RC Tompkins County DQ1894PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1894P | Dec 23, 2025to Nov 1, 2027 | Dec 23, 2025 | Nov 1, 2027 | $773,020$250,743 spent | $250,743 | |
Relocate Safety Office Bldg 9 & Rehabilitate Bldg 5 at the Elmira Psychiatric Center in Chemung Co D46064PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46064P | Jul 9, 2025to May 9, 2027 | Jul 9, 2025 | May 9, 2027 | $389,400$144,373 spent | $144,373 | |
Relocate Safety Office Bldg 9 & Rehabilitate Bldg 5 at the Elmira Psychiatric Center in Chemung Co D46064HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46064H | Jul 9, 2025to May 9, 2027 | Jul 9, 2025 | May 9, 2027 | $194,400$63,377 spent | $63,377 | |
Renovate Pharmacy Building 9 at Elmira Psychiatric Center in Chemung County D46205PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46205P | Jan 13, 2025to Dec 12, 2026 | Jan 13, 2025 | Dec 12, 2026 | $76,360$61,116 spent | $61,116 | |
Provide elevator addition & modernize existing elevators at the NYS Academy in Schuyler County D46123PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46123P | Sep 27, 2024to Nov 16, 2027 | Sep 27, 2024 | Nov 16, 2027 | $542,400$473,572 spent | $473,572 | |
Replace HVAC System Buildings 1 & 2 at NYS Academy of Fire Science in Schuyler County D46124PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46124P | Jul 10, 2024to Dec 21, 2026 | Jul 10, 2024 | Dec 21, 2026 | $159,938$150,860 spent | $150,860 | |
Chiller replacement at Ives Hall in Tompkins County D015753Construction: Miscellaneous | New York State Statutory College - Cornell University | Construction: MiscellaneousConstruction | D015753 | Mar 3, 2026to Jul 6, 2026 | Mar 3, 2026 | Jul 6, 2026 | $447,000$399,879 spent | $399,879 | |
Repair heating failures MacCormick Secure Center Tompkins County DEF508HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF508H | Feb 2, 2026to Sep 30, 2026 | Feb 2, 2026 | Sep 30, 2026 | $300,000$47,795 spent | $47,795 | |
Repair pipe leaks Auburn Correctional Facility Cayuga County DEF355PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF355P | Apr 4, 2025to Aug 2, 2025 | Apr 4, 2025 | Aug 2, 2025 | $200,000$19,935 spent | $19,935 | |
Repair hot water system Auburn Correctional Facility in Cayuga County DEF302PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF302P | Dec 20, 2024to Oct 6, 2025 | Dec 20, 2024 | Oct 6, 2025 | $950,000$914,681 spent | $914,681 |
Reconfigure bathrooms Bldgs 1,4,6,7 Elmira Psych Center Elmira Chemung CountyOffice of General Services - Design & ConstructionSep 11, 2026 – Oct 28, 2028Active$138,000
- Description
- Reconfigure bathrooms Bldgs 1,4,6,7 Elmira Psych Center Elmira Chemung County
- Contract number
- D47441H
- Type
- Construction: BuildingConstruction
- Term
- Sep 11, 2026 → Oct 28, 20282.2 years
- Approved
- Sep 11, 2026
- Status
- Active
- Amount
- $138,000
- Spent to date
- $0 · 0% of the amount
Replace reverse osmosis deionized water system Comstack Hall Cornell University in Tompkins CountyNew York State Statutory College - Cornell UniversityAug 29, 2026 – Feb 25, 2028Active$574,400
- Description
- Replace reverse osmosis deionized water system Comstack Hall Cornell University in Tompkins County
- Contract number
- D016861
- Type
- Construction: BuildingConstruction
- Term
- Aug 29, 2026 → Feb 25, 20281.5 years
- Approved
- Aug 19, 2026
- Status
- Active
- Amount
- $574,400
- Spent to date
- $0 · 0% of the amount
Replace water filtration system Kenneth Post Lab at Cornell University in Tompkins CountyNew York State Statutory College - Cornell UniversityAug 14, 2026 – Feb 10, 2028Active$376,000
- Description
- Replace water filtration system Kenneth Post Lab at Cornell University in Tompkins County
- Contract number
- D016840
- Type
- Construction: BuildingConstruction
- Term
- Aug 14, 2026 → Feb 10, 20281.5 years
- Approved
- Aug 5, 2026
- Status
- Active
- Amount
- $376,000
- Spent to date
- $0 · 0% of the amount
Rehabilitate kitchen, dining hall and courtyard Fingerlakes Residential Center Tompkins CountyOffice of General Services - Design & ConstructionJul 9, 2026 – Apr 25, 2029Active$733,300
- Description
- Rehabilitate kitchen, dining hall and courtyard Fingerlakes Residential Center Tompkins County
- Contract number
- D47412P
- Type
- Construction: BuildingConstruction
- Term
- Jul 9, 2026 → Apr 25, 20292.8 years
- Approved
- Jul 9, 2026
- Status
- Active
- Amount
- $733,300
- Spent to date
- $19,248 · 3% of the amount
Replace roofs in buildings 2, 40 and 41 at Elmira Correctional Facility in Chemung CountyOffice of General Services - Design & ConstructionJun 15, 2026 – Sep 5, 2027Active$237,000
- Description
- Replace roofs in buildings 2, 40 and 41 at Elmira Correctional Facility in Chemung County
- Contract number
- D47040H
- Type
- Construction: BuildingConstruction
- Term
- Jun 15, 2026 → Sep 5, 202715 months
- Approved
- Jun 15, 2026
- Status
- Active
- Amount
- $237,000
- Spent to date
- $8,729 · 4% of the amount
Replace roofs in buildings 2, 40 and 41 at Elmira Correctional Facility in Chemung CountyOffice of General Services - Design & ConstructionJun 5, 2026 – Aug 26, 2027Active$74,400
- Description
- Replace roofs in buildings 2, 40 and 41 at Elmira Correctional Facility in Chemung County
- Contract number
- D47040P
- Type
- Construction: BuildingConstruction
- Term
- Jun 5, 2026 → Aug 26, 202715 months
- Approved
- Jun 15, 2026
- Status
- Active
- Amount
- $74,400
- Spent to date
- $5,225 · 7% of the amount
Provide temporary cooling Elmira Correctional Facility Chemung CountyOffice of General Services - Design & ConstructionMay 5, 2026 – Nov 1, 2027Active$500,000
- Description
- Provide temporary cooling Elmira Correctional Facility Chemung County
- Contract number
- DEF555H
- Type
- Construction: BuildingConstruction
- Term
- May 5, 2026 → Nov 1, 20271.5 years
- Approved
- May 21, 2026
- Status
- Active
- Amount
- $500,000
- Spent to date
- $162,341 · 32% of the amount
Rehabilitate Route 17 I86 rest area in Tioga CountyOffice of General Services - Design & ConstructionMar 27, 2026 – Oct 2, 2027Active$263,000
- Description
- Rehabilitate Route 17 I86 rest area in Tioga County
- Contract number
- D47444P
- Type
- Construction: BuildingConstruction
- Term
- Mar 27, 2026 → Oct 2, 20271.5 years
- Approved
- Mar 27, 2026
- Status
- Active
- Amount
- $263,000
- Spent to date
- $128,261 · 49% of the amount
Electrical upgrades & backup generator Willard Drug Treatment Center Willard Seneca CountyOffice of General Services - Design & ConstructionJan 29, 2026 – Feb 16, 2027Active$186,000
- Description
- Electrical upgrades & backup generator Willard Drug Treatment Center Willard Seneca County
- Contract number
- DQ1891H
- Type
- Construction: BuildingConstruction
- Term
- Jan 29, 2026 → Feb 16, 202713 months
- Approved
- Jan 29, 2026
- Status
- Active
- Amount
- $186,000
- Spent to date
- $114,475 · 62% of the amount
Repair water supply system Dick Van Dyke Addiction Treatment Center Seneca CountyOffice of General Services - Design & ConstructionJan 6, 2026 – Nov 30, 2026Active$300,000
- Description
- Repair water supply system Dick Van Dyke Addiction Treatment Center Seneca County
- Contract number
- DEF490P
- Type
- Construction: BuildingConstruction
- Term
- Jan 6, 2026 → Nov 30, 202611 months
- Approved
- Jan 27, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $6,614 · 2% of the amount
Renovate 70 bedroom units and harden walls Finger Lakes RC Tompkins CountyOffice of General Services - Design & ConstructionDec 23, 2025 – Nov 1, 2027Active$773,020
- Description
- Renovate 70 bedroom units and harden walls Finger Lakes RC Tompkins County
- Contract number
- DQ1894P
- Type
- Construction: BuildingConstruction
- Term
- Dec 23, 2025 → Nov 1, 20271.8 years
- Approved
- Dec 23, 2025
- Status
- Active
- Amount
- $773,020
- Spent to date
- $250,743 · 32% of the amount
Relocate Safety Office Bldg 9 & Rehabilitate Bldg 5 at the Elmira Psychiatric Center in Chemung CoOffice of General Services - Design & ConstructionJul 9, 2025 – May 9, 2027Active$389,400
- Description
- Relocate Safety Office Bldg 9 & Rehabilitate Bldg 5 at the Elmira Psychiatric Center in Chemung Co
- Contract number
- D46064P
- Type
- Construction: BuildingConstruction
- Term
- Jul 9, 2025 → May 9, 20271.8 years
- Approved
- Jul 9, 2025
- Status
- Active
- Amount
- $389,400
- Spent to date
- $144,373 · 37% of the amount
Relocate Safety Office Bldg 9 & Rehabilitate Bldg 5 at the Elmira Psychiatric Center in Chemung CoOffice of General Services - Design & ConstructionJul 9, 2025 – May 9, 2027Active$194,400
- Description
- Relocate Safety Office Bldg 9 & Rehabilitate Bldg 5 at the Elmira Psychiatric Center in Chemung Co
- Contract number
- D46064H
- Type
- Construction: BuildingConstruction
- Term
- Jul 9, 2025 → May 9, 20271.8 years
- Approved
- Jul 9, 2025
- Status
- Active
- Amount
- $194,400
- Spent to date
- $63,377 · 33% of the amount
Renovate Pharmacy Building 9 at Elmira Psychiatric Center in Chemung CountyOffice of General Services - Design & ConstructionJan 13, 2025 – Dec 12, 2026Active$76,360
- Description
- Renovate Pharmacy Building 9 at Elmira Psychiatric Center in Chemung County
- Contract number
- D46205P
- Type
- Construction: BuildingConstruction
- Term
- Jan 13, 2025 → Dec 12, 20261.9 years
- Approved
- Jan 13, 2025
- Status
- Active
- Amount
- $76,360
- Spent to date
- $61,116 · 80% of the amount
Provide elevator addition & modernize existing elevators at the NYS Academy in Schuyler CountyOffice of General Services - Design & ConstructionSep 27, 2024 – Nov 16, 2027Active$542,400
- Description
- Provide elevator addition & modernize existing elevators at the NYS Academy in Schuyler County
- Contract number
- D46123P
- Type
- Construction: BuildingConstruction
- Term
- Sep 27, 2024 → Nov 16, 20273.2 years
- Approved
- Sep 27, 2024
- Status
- Active
- Amount
- $542,400
- Spent to date
- $473,572 · 87% of the amount
Replace HVAC System Buildings 1 & 2 at NYS Academy of Fire Science in Schuyler CountyOffice of General Services - Design & ConstructionJul 10, 2024 – Dec 21, 2026Active$159,938
- Description
- Replace HVAC System Buildings 1 & 2 at NYS Academy of Fire Science in Schuyler County
- Contract number
- D46124P
- Type
- Construction: BuildingConstruction
- Term
- Jul 10, 2024 → Dec 21, 20262.4 years
- Approved
- Jul 10, 2024
- Status
- Active
- Amount
- $159,938
- Spent to date
- $150,860 · 94% of the amount
Chiller replacement at Ives Hall in Tompkins CountyNew York State Statutory College - Cornell UniversityMar 3, 2026 – Jul 6, 2026$447,000
- Description
- Chiller replacement at Ives Hall in Tompkins County
- Contract number
- D015753
- Type
- Construction: MiscellaneousConstruction
- Term
- Mar 3, 2026 → Jul 6, 20264 months
- Approved
- Mar 3, 2026
- Status
- Ended
- Amount
- $447,000
- Spent to date
- $399,879 · 89% of the amount
Repair heating failures MacCormick Secure Center Tompkins CountyOffice of General Services - Design & ConstructionFeb 2, 2026 – Sep 30, 2026$300,000
- Description
- Repair heating failures MacCormick Secure Center Tompkins County
- Contract number
- DEF508H
- Type
- Construction: BuildingConstruction
- Term
- Feb 2, 2026 → Sep 30, 20268 months
- Approved
- Mar 12, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $47,795 · 16% of the amount
Repair pipe leaks Auburn Correctional Facility Cayuga CountyOffice of General Services - Design & ConstructionApr 4, 2025 – Aug 2, 2025$200,000
- Description
- Repair pipe leaks Auburn Correctional Facility Cayuga County
- Contract number
- DEF355P
- Type
- Construction: BuildingConstruction
- Term
- Apr 4, 2025 → Aug 2, 20254 months
- Approved
- Apr 29, 2025
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $19,935 · 10% of the amount
Repair hot water system Auburn Correctional Facility in Cayuga CountyOffice of General Services - Design & ConstructionDec 20, 2024 – Oct 6, 2025$950,000
- Description
- Repair hot water system Auburn Correctional Facility in Cayuga County
- Contract number
- DEF302P
- Type
- Construction: BuildingConstruction
- Term
- Dec 20, 2024 → Oct 6, 202510 months
- Approved
- Jan 23, 2025
- Status
- Ended
- Amount
- $950,000
- Spent to date
- $914,681 · 96% of the amount
Contract-type mix
Share of contract value by type
- Construction59 contracts$25.0M
- Contract not subject to state pre-audit7 contracts$2.8M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2012: 1 contracts, $289.8K | 1 |
| 2013: 0 contracts, $0.0 | 0 |
| 2014: 4 contracts, $1.5M | 4 |
| 2015: 1 contracts, $581.1K | 1 |
| 2016: 6 contracts, $1.1M | 6 |
| 2017: 3 contracts, $2.0M | 3 |
| 2018: 1 contracts, $525.8K | 1 |
| 2019: 2 contracts, $362.3K | 2 |
| 2020: 5 contracts, $1.3M | 5 |
| 2021: 5 contracts, $4.0M | 5 |
| 2022: 10 contracts, $3.4M | 10 |
| 2023: 5 contracts, $3.2M | 5 |
| 2024: 6 contracts, $3.8M | 6 |
| 2025: 5 contracts, $1.6M | 5 |
| 2026: 12 contracts, $4.1M | 12 |
How the Contractor Score adds up
Extensive (A, 100/100): 16 active contracts, $28M in contracts.
- Contract volume+13.6measured
$28M in current contract value across 66 contracts, more than 92% of scored contractors.
- Recent activity+20.2measured
16 active contracts today; the most recent was approved in September 2026.
- Agency breadth+6.8measured
Contracts with 3 different state agencies and facilities.
- Experience+0.5measured
First contract started in September 2012 (14 years of contract history).
- Contract-type mix+5.9measured
3 contract types; the largest group is construction (90% of value). Goods and services contracts are 90% of the total.
- Spending vs. value−0.6measured
On 50 completed contracts with spending recorded, spending is 73% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 101.6, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Landry Mechanical Contractors
Construction & Renovation
Since 20097 agencies
- Contract value
- $16.5M
- Contracts
- 27
- Active
- 0
- A
RB Robinson Contracting Inc
Construction & Renovation
Since 20146 agencies
- Contract value
- $14.4M
- Contracts
- 14
- Active
- 0
- A
Postler & Jaeckle Corp
Rochester, NYConstruction & Renovation
Since 200819 agencies
- Contract value
- $56.7M
- Contracts
- 101
- Active
- 12
- A
Schuler-Haas Electric Corp
Construction & Renovation
Since 20077 agencies
- Contract value
- $61.5M
- Contracts
- 53
- Active
- 0
- A
Hmi Mechanical Systems Inc
Construction & Renovation
Since 20087 agencies
- Contract value
- $65.9M
- Contracts
- 135
- Active
- 0
- A
Hale Contracting Inc
Construction & Renovation
Since 20183 agencies
- Contract value
- $10.1M
- Contracts
- 8
- Active
- 1
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- New York State Statutory College - Cornell University contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.