E W Tompkins Company Inc holds 25 contracts worth $48.1M with 2 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2002.
- Total contract value
- $48.1M
- Current contract amounts
- Spent to date
- $46.0M
- 95% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 25
- Since 2002
- Agencies served
- 2
- Most with Office of General Services - Design & Construction
- Years active
- 24
- First contract 2002
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- E W Tompkins Co Inc
- Identifiers
- UEI D7RNF3GGH2C9 · CAGE 382H0
- Federal registration
- Active · renews by Feb 2027
- In business since
- 1921
Leadership
Sean Clayton
Mr.
Kevin Miller
Contracts
25 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Repair steam condensate leak building 22 SOB Albany county DEE552HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE552H | Mar 29, 2021to Oct 29, 2021 | Mar 29, 2021 | Oct 29, 2021 | $150,000$127,936 spent | $127,936 | |
Repair/replace DHW heaters Greene CF DEE506PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE506P | Dec 29, 2020to Dec 1, 2022 | Dec 29, 2020 | Dec 1, 2022 | $750,000$598,551 spent | $598,551 | |
Upgrade Elevators Sheridan Avenue Steam Plant H Albany County D45465HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45465H | Jul 2, 2018to Dec 19, 2019 | Jul 2, 2018 | Dec 19, 2019 | $42,720$39,871 spent | $39,871 | |
Provide Boiler, Main Building Columbia Secure Center for Girls Columbia County (H) D45442HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45442H | Jun 12, 2018to Jun 20, 2019 | Jun 12, 2018 | Jun 20, 2019 | $378,600$359,208 spent | $359,208 | |
Repair Air Handler Unit, 2nd Floor, Bldg 55 Mohawk CF Oneida County DED822HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED822H | May 15, 2018to Jul 25, 2018 | May 15, 2018 | Jul 25, 2018 | $100,000$12,994 spent | $12,994 | |
Provide Structural Repairs to East Parking Garage Albany County D45149PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45149P | Jul 6, 2017to Sep 29, 2019 | Jul 6, 2017 | Sep 29, 2019 | $492,600$472,633 spent | $472,633 | |
Provide concrete and mechanical system repairs, various locations, Albany. (H) D45414HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45414H | Dec 7, 2016to Mar 5, 2020 | Dec 7, 2016 | Mar 5, 2020 | $600,000$19,486 spent | $19,486 | |
Provide concrete and mechanical system repairs, various locations, Albany (P) D45414PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45414P | Dec 7, 2016to Mar 5, 2020 | Dec 7, 2016 | Mar 5, 2020 | $300,000$51,767 spent | $51,767 | |
Reconstruction of Schodack Rest Area I-90 Town of Schodack, Rensselaer County Region 1 (Mech) D263234Construction: Building | Department of Transportation | Construction: BuildingConstruction | D263234 | Jul 22, 2016to Oct 10, 2016 | Jul 22, 2016 | Oct 10, 2016 | $113,240$113,240 spent | $113,240 | |
Reconstruction of Schodack Rest Area I-90 Town of Schodack, Rensselaer County Region 1 (P) D263235Construction: Building | Department of Transportation | Construction: BuildingConstruction | D263235 | Jul 22, 2016to Oct 10, 2016 | Jul 22, 2016 | Oct 10, 2016 | $78,440$78,440 spent | $78,440 | |
Repair/Replace Failed Chiller at Griffin Lab, Slingerland, Albany County DED019HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED019H | Sep 16, 2015to Jul 5, 2016 | Sep 16, 2015 | Jul 5, 2016 | $200,000$192,253 spent | $192,253 | |
Repair broken cooling coil building 1 capital district PC DEC619HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC619H | Apr 23, 2014to Aug 21, 2014 | Apr 23, 2014 | Aug 21, 2014 | $100,000$26,890 spent | $26,890 | |
Facility decommission plumbing systems oneida CF DEC402PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC402P | Aug 13, 2013to Jun 30, 2014 | Aug 13, 2013 | Jun 30, 2014 | $300,000$37,998 spent | $37,998 | |
Facility closure decommission HVAC systems oneida CF DEC400HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC400H | Aug 13, 2013to Dec 11, 2013 | Aug 13, 2013 | Dec 11, 2013 | $300,000$107,982 spent | $107,982 | |
Provide above ground hot water piping HVAC work marcy correctional facility oneida county D44303HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44303H | Apr 19, 2013to Sep 25, 2017 | Apr 19, 2013 | Sep 25, 2017 | $9,623,305$9,553,426 spent | $9,553,426 | |
Repair building chiller dmna headquarters latham new york DEC243HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC243H | Feb 8, 2013to Jun 8, 2013 | Feb 8, 2013 | Jun 8, 2013 | $300,000$175,690 spent | $175,690 | |
Repair various leaks powerhouse BLDG mid state CF DEB777HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB777H | Nov 29, 2011to Mar 28, 2012 | Nov 29, 2011 | Mar 28, 2012 | $100,000$11,162 spent | $11,162 | |
Repair failed controls on summer boiler coxsackie CF DEB585HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB585H | Jul 6, 2011to Nov 3, 2011 | Jul 6, 2011 | Nov 3, 2011 | $75,000$24,744 spent | $24,744 | |
Repair steam leaks bldgs 10 & 19 great meadow CF DEB545HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB545H | May 20, 2011to Sep 17, 2011 | May 20, 2011 | Sep 17, 2011 | $75,000$13,261 spent | $13,261 | |
Replace failed circulator pumps in powerhouse mid state CF DEB035HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB035H | Dec 11, 2009to May 25, 2011 | Dec 11, 2009 | May 25, 2011 | $300,000$218,869 spent | $218,869 |
Repair steam condensate leak building 22 SOB Albany countyOffice of General Services - Design & ConstructionMar 29, 2021 – Oct 29, 2021$150,000
- Description
- Repair steam condensate leak building 22 SOB Albany county
- Contract number
- DEE552H
- Type
- Construction: BuildingConstruction
- Term
- Mar 29, 2021 → Oct 29, 20217 months
- Approved
- Apr 23, 2021
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $127,936 · 85% of the amount
Repair/replace DHW heaters Greene CFOffice of General Services - Design & ConstructionDec 29, 2020 – Dec 1, 2022$750,000
- Description
- Repair/replace DHW heaters Greene CF
- Contract number
- DEE506P
- Type
- Construction: BuildingConstruction
- Term
- Dec 29, 2020 → Dec 1, 20221.9 years
- Approved
- Feb 11, 2021
- Status
- Ended
- Amount
- $750,000
- Spent to date
- $598,551 · 80% of the amount
Upgrade Elevators Sheridan Avenue Steam Plant H Albany CountyOffice of General Services - Design & ConstructionJul 2, 2018 – Dec 19, 2019$42,720
- Description
- Upgrade Elevators Sheridan Avenue Steam Plant H Albany County
- Contract number
- D45465H
- Type
- Construction: BuildingConstruction
- Term
- Jul 2, 2018 → Dec 19, 20191.5 years
- Approved
- Jul 2, 2018
- Status
- Ended
- Amount
- $42,720
- Spent to date
- $39,871 · 93% of the amount
Provide Boiler, Main Building Columbia Secure Center for Girls Columbia County (H)Office of General Services - Design & ConstructionJun 12, 2018 – Jun 20, 2019$378,600
- Description
- Provide Boiler, Main Building Columbia Secure Center for Girls Columbia County (H)
- Contract number
- D45442H
- Type
- Construction: BuildingConstruction
- Term
- Jun 12, 2018 → Jun 20, 201912 months
- Approved
- Jun 12, 2018
- Status
- Ended
- Amount
- $378,600
- Spent to date
- $359,208 · 95% of the amount
Repair Air Handler Unit, 2nd Floor, Bldg 55 Mohawk CF Oneida CountyOffice of General Services - Design & ConstructionMay 15, 2018 – Jul 25, 2018$100,000
- Description
- Repair Air Handler Unit, 2nd Floor, Bldg 55 Mohawk CF Oneida County
- Contract number
- DED822H
- Type
- Construction: BuildingConstruction
- Term
- May 15, 2018 → Jul 25, 20182 months
- Approved
- Jul 9, 2018
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $12,994 · 13% of the amount
Provide Structural Repairs to East Parking Garage Albany CountyOffice of General Services - Design & ConstructionJul 6, 2017 – Sep 29, 2019$492,600
- Description
- Provide Structural Repairs to East Parking Garage Albany County
- Contract number
- D45149P
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2017 → Sep 29, 20192.3 years
- Approved
- Jul 6, 2017
- Status
- Ended
- Amount
- $492,600
- Spent to date
- $472,633 · 96% of the amount
Provide concrete and mechanical system repairs, various locations, Albany. (H)Office of General Services - Design & ConstructionDec 7, 2016 – Mar 5, 2020$600,000
- Description
- Provide concrete and mechanical system repairs, various locations, Albany. (H)
- Contract number
- D45414H
- Type
- Construction: BuildingConstruction
- Term
- Dec 7, 2016 → Mar 5, 20203.3 years
- Approved
- Dec 7, 2016
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $19,486 · 3% of the amount
Provide concrete and mechanical system repairs, various locations, Albany (P)Office of General Services - Design & ConstructionDec 7, 2016 – Mar 5, 2020$300,000
- Description
- Provide concrete and mechanical system repairs, various locations, Albany (P)
- Contract number
- D45414P
- Type
- Construction: BuildingConstruction
- Term
- Dec 7, 2016 → Mar 5, 20203.3 years
- Approved
- Dec 7, 2016
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $51,767 · 17% of the amount
Reconstruction of Schodack Rest Area I-90 Town of Schodack, Rensselaer County Region 1 (Mech)Department of TransportationJul 22, 2016 – Oct 10, 2016$113,240
- Description
- Reconstruction of Schodack Rest Area I-90 Town of Schodack, Rensselaer County Region 1 (Mech)
- Contract number
- D263234
- Type
- Construction: BuildingConstruction
- Term
- Jul 22, 2016 → Oct 10, 20163 months
- Approved
- Jul 22, 2016
- Status
- Ended
- Amount
- $113,240
- Spent to date
- $113,240 · 100% of the amount
Reconstruction of Schodack Rest Area I-90 Town of Schodack, Rensselaer County Region 1 (P)Department of TransportationJul 22, 2016 – Oct 10, 2016$78,440
- Description
- Reconstruction of Schodack Rest Area I-90 Town of Schodack, Rensselaer County Region 1 (P)
- Contract number
- D263235
- Type
- Construction: BuildingConstruction
- Term
- Jul 22, 2016 → Oct 10, 20163 months
- Approved
- Jul 22, 2016
- Status
- Ended
- Amount
- $78,440
- Spent to date
- $78,440 · 100% of the amount
Repair/Replace Failed Chiller at Griffin Lab, Slingerland, Albany CountyOffice of General Services - Design & ConstructionSep 16, 2015 – Jul 5, 2016$200,000
- Description
- Repair/Replace Failed Chiller at Griffin Lab, Slingerland, Albany County
- Contract number
- DED019H
- Type
- Construction: BuildingConstruction
- Term
- Sep 16, 2015 → Jul 5, 201610 months
- Approved
- Nov 17, 2015
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $192,253 · 96% of the amount
Repair broken cooling coil building 1 capital district PCOffice of General Services - Design & ConstructionApr 23, 2014 – Aug 21, 2014$100,000
- Description
- Repair broken cooling coil building 1 capital district PC
- Contract number
- DEC619H
- Type
- Construction: BuildingConstruction
- Term
- Apr 23, 2014 → Aug 21, 20144 months
- Approved
- May 16, 2014
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $26,890 · 27% of the amount
Facility decommission plumbing systems oneida CFOffice of General Services - Design & ConstructionAug 13, 2013 – Jun 30, 2014$300,000
- Description
- Facility decommission plumbing systems oneida CF
- Contract number
- DEC402P
- Type
- Construction: BuildingConstruction
- Term
- Aug 13, 2013 → Jun 30, 201411 months
- Approved
- Sep 24, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $37,998 · 13% of the amount
Facility closure decommission HVAC systems oneida CFOffice of General Services - Design & ConstructionAug 13, 2013 – Dec 11, 2013$300,000
- Description
- Facility closure decommission HVAC systems oneida CF
- Contract number
- DEC400H
- Type
- Construction: BuildingConstruction
- Term
- Aug 13, 2013 → Dec 11, 20134 months
- Approved
- Sep 24, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $107,982 · 36% of the amount
Provide above ground hot water piping HVAC work marcy correctional facility oneida countyOffice of General Services - Design & ConstructionApr 19, 2013 – Sep 25, 2017$9,623,305
- Description
- Provide above ground hot water piping HVAC work marcy correctional facility oneida county
- Contract number
- D44303H
- Type
- Construction: BuildingConstruction
- Term
- Apr 19, 2013 → Sep 25, 20174.4 years
- Approved
- Apr 19, 2013
- Status
- Ended
- Amount
- $9,623,305
- Spent to date
- $9,553,426 · 99% of the amount
Repair building chiller dmna headquarters latham new yorkOffice of General Services - Design & ConstructionFeb 8, 2013 – Jun 8, 2013$300,000
- Description
- Repair building chiller dmna headquarters latham new york
- Contract number
- DEC243H
- Type
- Construction: BuildingConstruction
- Term
- Feb 8, 2013 → Jun 8, 20134 months
- Approved
- Apr 5, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $175,690 · 59% of the amount
Repair various leaks powerhouse BLDG mid state CFOffice of General Services - Design & ConstructionNov 29, 2011 – Mar 28, 2012$100,000
- Description
- Repair various leaks powerhouse BLDG mid state CF
- Contract number
- DEB777H
- Type
- Construction: BuildingConstruction
- Term
- Nov 29, 2011 → Mar 28, 20124 months
- Approved
- Dec 28, 2011
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $11,162 · 11% of the amount
Repair failed controls on summer boiler coxsackie CFOffice of General Services - Design & ConstructionJul 6, 2011 – Nov 3, 2011$75,000
- Description
- Repair failed controls on summer boiler coxsackie CF
- Contract number
- DEB585H
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2011 → Nov 3, 20114 months
- Approved
- Aug 12, 2011
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $24,744 · 33% of the amount
Repair steam leaks bldgs 10 & 19 great meadow CFOffice of General Services - Design & ConstructionMay 20, 2011 – Sep 17, 2011$75,000
- Description
- Repair steam leaks bldgs 10 & 19 great meadow CF
- Contract number
- DEB545H
- Type
- Construction: BuildingConstruction
- Term
- May 20, 2011 → Sep 17, 20114 months
- Approved
- Jun 22, 2011
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $13,261 · 18% of the amount
Replace failed circulator pumps in powerhouse mid state CFOffice of General Services - Design & ConstructionDec 11, 2009 – May 25, 2011$300,000
- Description
- Replace failed circulator pumps in powerhouse mid state CF
- Contract number
- DEB035H
- Type
- Construction: BuildingConstruction
- Term
- Dec 11, 2009 → May 25, 201117 months
- Approved
- Jun 17, 2011
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $218,869 · 73% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building25 contracts$48.1M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 3 contracts, $4.9M | 3 |
| 2008: 0 contracts, $0.0 | 0 |
| 2009: 1 contracts, $300.0K | 1 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 3 contracts, $250.0K | 3 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 4 contracts, $10.5M | 4 |
| 2014: 1 contracts, $100.0K | 1 |
| 2015: 1 contracts, $200.0K | 1 |
| 2016: 4 contracts, $1.1M | 4 |
| 2017: 1 contracts, $492.6K | 1 |
| 2018: 3 contracts, $521.3K | 3 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 1 contracts, $750.0K | 1 |
| 2021: 1 contracts, $150.0K | 1 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 80/100): $48M in contracts, active federal registration.
- Contract volume+15.3measured
$48M in current contract value across 25 contracts, more than 94% of scored contractors.
- Recent activity−1.2measured
No active contracts today; the most recent was approved in April 2021.
- Agency breadth+4.3measured
Contracts with 2 different state agencies and facilities.
- Experience+3.1measured
First contract started in November 2002 (23 years of contract history).
- Contract-type mix+3.3measured
1 contract type; the largest group is construction (100% of value). Goods and services contracts are 100% of the total.
- Spending vs. value0.0measured
On 25 completed contracts with spending recorded, spending is 95% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 80 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
LH Laplante Company Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $43.4M
- Contracts
- 68
- Active
- 4
- A
The Franklin Company Contractors Inc
College Point, NYConstruction & Renovation
Since 20124 agencies
- Contract value
- $42.1M
- Contracts
- 12
- Active
- 1
- A
Pioneer Landscaping & Asphalt Paving Inc
Kings Park, NYConstruction & Renovation
Since 20184 agencies
- Contract value
- $41.6M
- Contracts
- 13
- Active
- 1
- A
DLC Electric LLC
Troy, NYConstruction & Renovation
Since 20094 agencies
- Contract value
- $56.4M
- Contracts
- 43
- Active
- 5
- A
GGG Construction Corp
Hicksville, NYConstruction & Renovation
Since 20062 agencies
- Contract value
- $56.7M
- Contracts
- 20
- Active
- 3
- A
Ocs Industries
Poughkeepsie, NYConstruction & Renovation
Since 20166 agencies
- Contract value
- $57.6M
- Contracts
- 13
- Active
- 2
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Department of Transportation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.