Eastern Building & Restoration Inc
BState contracts since 2007Updated Nov 13, 2026
Eastern Building & Restoration Inc holds 24 contracts worth $19.1M with 4 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2007.
- Total contract value
- $19.1M
- Current contract amounts
- Spent to date
- $17.9M
- 94% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 24
- Since 2007
- Agencies served
- 4
- Most with Office of General Services - Design & Construction
- Years active
- 19
- First contract 2007
Contact & company
Business information and how to reach the company.
Contracts
24 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Connect security & utilities services army aviation support modular offices latham albany county DQ1574CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1574C | Aug 22, 2013to Oct 18, 2014 | Aug 22, 2013 | Oct 18, 2014 | $280,323$223,733 spent | $223,733 | |
Provide curtain wall louvers state office building 17 albany county D43741CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43741C | Jul 15, 2013to Jun 30, 2015 | Jul 15, 2013 | Jun 30, 2015 | $1,625,809$1,623,403 spent | $1,623,403 | |
Block h cell back repairs general construction work greenhaven correction facility D41696CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D41696C | Jun 11, 2013to Oct 8, 2016 | Jun 11, 2013 | Oct 8, 2016 | $1,568,362$1,522,412 spent | $1,522,412 | |
Repair failed ceilings and replace insulation buildings 15 and 18 MT mcgregor CF DEC246CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC246C | Feb 12, 2013to Jul 29, 2013 | Feb 12, 2013 | Jul 29, 2013 | $150,000$71,855 spent | $71,855 | |
Replace membrane roof on DOT maintenance building defreestville rensselaer county D44360CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44360C | Dec 27, 2012to Dec 30, 2013 | Dec 27, 2012 | Dec 30, 2013 | $454,156$454,156 spent | $454,156 | |
Repair failed elevator building 3 capital district psychiatric center DEC161CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC161C | Dec 12, 2012to Apr 11, 2013 | Dec 12, 2012 | Apr 11, 2013 | $75,000$56,012 spent | $56,012 | |
Rehab 2ND floor locker general construction work state armory utica oneida county DQ1537CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1537C | Nov 9, 2012to May 31, 2015 | Nov 9, 2012 | May 31, 2015 | $632,978$605,041 spent | $605,041 | |
Repair Gym Floor T000096Contract not subject to state pre-audit | Central New York Psychiatric Center | Contract not subject to state pre-auditNot pre-audited | T000096 | Aug 1, 2012to Feb 28, 2013 | Aug 1, 2012 | Feb 28, 2013 | $22,262$22,262 spent | $22,262 | |
Provide storage cabinets & carrels 2ND floor esp cultural education center D44224CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44224C | Jan 19, 2012to Apr 14, 2013 | Jan 19, 2012 | Apr 14, 2013 | $137,868$137,733 spent | $137,733 | |
Rehab swan street garage & roadway gnaresp swan street BLDG D44148CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44148C | Nov 2, 2011to Nov 13, 2013 | Nov 2, 2011 | Nov 13, 2013 | $752,582$671,052 spent | $671,052 | |
CO#3-Contract Recreation Closed Contract D44148C-Rehab Swan Street Garage and Roadway Albany County D45642CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45642C | Nov 2, 2011to Nov 13, 2013 | Nov 2, 2011 | Nov 13, 2013 | $65,411$51,384 spent | $51,384 | |
Sucf 36115 exterior restoration-rockefeller institute of gov buildings suc at albany T005878Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005878 | Oct 25, 2011to Jul 30, 2013 | Oct 25, 2011 | Jul 30, 2013 | $1,952,943$1,952,943 spent | $1,952,943 | |
Provide clean up of debris & silt in basement guy park manor, amsterdam DEB700CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB700C | Sep 22, 2011to Jan 20, 2012 | Sep 22, 2011 | Jan 20, 2012 | $100,000$58,402 spent | $58,402 | |
Replace steel cell backs & domestic water piping auburn CF D44065CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44065C | Sep 14, 2011to Jan 26, 2014 | Sep 14, 2011 | Jan 26, 2014 | $1,720,009$1,679,605 spent | $1,679,605 | |
Provide clean up & restore pumps oem reg 2 office poughkeepsie, new york DEB661CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB661C | Sep 8, 2011to Aug 27, 2012 | Sep 8, 2011 | Aug 27, 2012 | $300,000$269,422 spent | $269,422 | |
Repair hazardous subfloor building 2 great meadow CF DEB639CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB639C | Sep 1, 2011to Dec 30, 2011 | Sep 1, 2011 | Dec 30, 2011 | $100,000$22,205 spent | $22,205 | |
Repair flood damaged interior finishes in dorms SUNY cobleskill DEB631CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB631C | Aug 30, 2011to Dec 28, 2011 | Aug 30, 2011 | Dec 28, 2011 | $300,000$230,441 spent | $230,441 | |
Northampton beach campground shower buildings D007914Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D007914 | Dec 1, 2010to Jun 15, 2011 | Dec 1, 2010 | Jun 15, 2011 | $597,000$569,748 spent | $569,748 | |
Plaza level masonry repairs empire state plaza D44036CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44036C | Nov 24, 2010to Jun 27, 2014 | Nov 24, 2010 | Jun 27, 2014 | $3,985,250$3,513,619 spent | $3,513,619 | |
Provide egress stairs - terrace level esp cultural education center D43538CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43538C | Oct 21, 2010to Dec 27, 2012 | Oct 21, 2010 | Dec 27, 2012 | $1,560,731$1,556,468 spent | $1,556,468 |
Connect security & utilities services army aviation support modular offices latham albany countyOffice of General Services - Design & ConstructionAug 22, 2013 – Oct 18, 2014$280,323
- Description
- Connect security & utilities services army aviation support modular offices latham albany county
- Contract number
- DQ1574C
- Type
- Construction: BuildingConstruction
- Term
- Aug 22, 2013 → Oct 18, 201414 months
- Approved
- Aug 22, 2013
- Status
- Ended
- Amount
- $280,323
- Spent to date
- $223,733 · 80% of the amount
Provide curtain wall louvers state office building 17 albany countyOffice of General Services - Design & ConstructionJul 15, 2013 – Jun 30, 2015$1,625,809
- Description
- Provide curtain wall louvers state office building 17 albany county
- Contract number
- D43741C
- Type
- Construction: BuildingConstruction
- Term
- Jul 15, 2013 → Jun 30, 20151.9 years
- Approved
- Jul 15, 2013
- Status
- Ended
- Amount
- $1,625,809
- Spent to date
- $1,623,403 · 100% of the amount
Block h cell back repairs general construction work greenhaven correction facilityOffice of General Services - Design & ConstructionJun 11, 2013 – Oct 8, 2016$1,568,362
- Description
- Block h cell back repairs general construction work greenhaven correction facility
- Contract number
- D41696C
- Type
- Construction: BuildingConstruction
- Term
- Jun 11, 2013 → Oct 8, 20163.3 years
- Approved
- Jun 11, 2013
- Status
- Ended
- Amount
- $1,568,362
- Spent to date
- $1,522,412 · 97% of the amount
Repair failed ceilings and replace insulation buildings 15 and 18 MT mcgregor CFOffice of General Services - Design & ConstructionFeb 12, 2013 – Jul 29, 2013$150,000
- Description
- Repair failed ceilings and replace insulation buildings 15 and 18 MT mcgregor CF
- Contract number
- DEC246C
- Type
- Construction: BuildingConstruction
- Term
- Feb 12, 2013 → Jul 29, 20135 months
- Approved
- Apr 5, 2013
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $71,855 · 48% of the amount
Replace membrane roof on DOT maintenance building defreestville rensselaer countyOffice of General Services - Design & ConstructionDec 27, 2012 – Dec 30, 2013$454,156
- Description
- Replace membrane roof on DOT maintenance building defreestville rensselaer county
- Contract number
- D44360C
- Type
- Construction: BuildingConstruction
- Term
- Dec 27, 2012 → Dec 30, 201312 months
- Approved
- Dec 28, 2012
- Status
- Ended
- Amount
- $454,156
- Spent to date
- $454,156 · 100% of the amount
Repair failed elevator building 3 capital district psychiatric centerOffice of General Services - Design & ConstructionDec 12, 2012 – Apr 11, 2013$75,000
- Description
- Repair failed elevator building 3 capital district psychiatric center
- Contract number
- DEC161C
- Type
- Construction: BuildingConstruction
- Term
- Dec 12, 2012 → Apr 11, 20134 months
- Approved
- Jan 8, 2013
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $56,012 · 75% of the amount
Rehab 2ND floor locker general construction work state armory utica oneida countyOffice of General Services - Design & ConstructionNov 9, 2012 – May 31, 2015$632,978
- Description
- Rehab 2ND floor locker general construction work state armory utica oneida county
- Contract number
- DQ1537C
- Type
- Construction: BuildingConstruction
- Term
- Nov 9, 2012 → May 31, 20152.6 years
- Approved
- Nov 9, 2012
- Status
- Ended
- Amount
- $632,978
- Spent to date
- $605,041 · 96% of the amount
Repair Gym FloorCentral New York Psychiatric CenterAug 1, 2012 – Feb 28, 2013$22,262
- Description
- Repair Gym Floor
- Contract number
- T000096
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Aug 1, 2012 → Feb 28, 20137 months
- Approved
- Aug 23, 2012
- Status
- Ended
- Amount
- $22,262
- Spent to date
- $22,262 · 100% of the amount
Provide storage cabinets & carrels 2ND floor esp cultural education centerOffice of General Services - Design & ConstructionJan 19, 2012 – Apr 14, 2013$137,868
- Description
- Provide storage cabinets & carrels 2ND floor esp cultural education center
- Contract number
- D44224C
- Type
- Construction: BuildingConstruction
- Term
- Jan 19, 2012 → Apr 14, 201315 months
- Approved
- Jan 19, 2012
- Status
- Ended
- Amount
- $137,868
- Spent to date
- $137,733 · 100% of the amount
Rehab swan street garage & roadway gnaresp swan street BLDGOffice of General Services - Design & ConstructionNov 2, 2011 – Nov 13, 2013$752,582
- Description
- Rehab swan street garage & roadway gnaresp swan street BLDG
- Contract number
- D44148C
- Type
- Construction: BuildingConstruction
- Term
- Nov 2, 2011 → Nov 13, 20132 years
- Approved
- Nov 2, 2011
- Status
- Ended
- Amount
- $752,582
- Spent to date
- $671,052 · 89% of the amount
CO#3-Contract Recreation Closed Contract D44148C-Rehab Swan Street Garage and Roadway Albany CountyOffice of General Services - Design & ConstructionNov 2, 2011 – Nov 13, 2013$65,411
- Description
- CO#3-Contract Recreation Closed Contract D44148C-Rehab Swan Street Garage and Roadway Albany County
- Contract number
- D45642C
- Type
- Construction: BuildingConstruction
- Term
- Nov 2, 2011 → Nov 13, 20132 years
- Approved
- Sep 12, 2017
- Status
- Ended
- Amount
- $65,411
- Spent to date
- $51,384 · 79% of the amount
Sucf 36115 exterior restoration-rockefeller institute of gov buildings suc at albanyState University Construction FundOct 25, 2011 – Jul 30, 2013$1,952,943
- Description
- Sucf 36115 exterior restoration-rockefeller institute of gov buildings suc at albany
- Contract number
- T005878
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 25, 2011 → Jul 30, 20131.8 years
- Approved
- Nov 1, 2011
- Status
- Ended
- Amount
- $1,952,943
- Spent to date
- $1,952,943 · 100% of the amount
Provide clean up of debris & silt in basement guy park manor, amsterdamOffice of General Services - Design & ConstructionSep 22, 2011 – Jan 20, 2012$100,000
- Description
- Provide clean up of debris & silt in basement guy park manor, amsterdam
- Contract number
- DEB700C
- Type
- Construction: BuildingConstruction
- Term
- Sep 22, 2011 → Jan 20, 20124 months
- Approved
- Nov 14, 2011
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $58,402 · 58% of the amount
Replace steel cell backs & domestic water piping auburn CFOffice of General Services - Design & ConstructionSep 14, 2011 – Jan 26, 2014$1,720,009
- Description
- Replace steel cell backs & domestic water piping auburn CF
- Contract number
- D44065C
- Type
- Construction: BuildingConstruction
- Term
- Sep 14, 2011 → Jan 26, 20142.3 years
- Approved
- Sep 14, 2011
- Status
- Ended
- Amount
- $1,720,009
- Spent to date
- $1,679,605 · 98% of the amount
Provide clean up & restore pumps oem reg 2 office poughkeepsie, new yorkOffice of General Services - Design & ConstructionSep 8, 2011 – Aug 27, 2012$300,000
- Description
- Provide clean up & restore pumps oem reg 2 office poughkeepsie, new york
- Contract number
- DEB661C
- Type
- Construction: BuildingConstruction
- Term
- Sep 8, 2011 → Aug 27, 201212 months
- Approved
- Mar 2, 2012
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $269,422 · 90% of the amount
Repair hazardous subfloor building 2 great meadow CFOffice of General Services - Design & ConstructionSep 1, 2011 – Dec 30, 2011$100,000
- Description
- Repair hazardous subfloor building 2 great meadow CF
- Contract number
- DEB639C
- Type
- Construction: BuildingConstruction
- Term
- Sep 1, 2011 → Dec 30, 20114 months
- Approved
- Sep 16, 2011
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $22,205 · 22% of the amount
Repair flood damaged interior finishes in dorms SUNY cobleskillOffice of General Services - Design & ConstructionAug 30, 2011 – Dec 28, 2011$300,000
- Description
- Repair flood damaged interior finishes in dorms SUNY cobleskill
- Contract number
- DEB631C
- Type
- Construction: BuildingConstruction
- Term
- Aug 30, 2011 → Dec 28, 20114 months
- Approved
- Sep 28, 2011
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $230,441 · 77% of the amount
Northampton beach campground shower buildingsDepartment of Environmental ConservationDec 1, 2010 – Jun 15, 2011$597,000
- Description
- Northampton beach campground shower buildings
- Contract number
- D007914
- Type
- Construction: BuildingConstruction
- Term
- Dec 1, 2010 → Jun 15, 20116 months
- Approved
- Dec 1, 2010
- Status
- Ended
- Amount
- $597,000
- Spent to date
- $569,748 · 95% of the amount
Plaza level masonry repairs empire state plazaOffice of General Services - Design & ConstructionNov 24, 2010 – Jun 27, 2014$3,985,250
- Description
- Plaza level masonry repairs empire state plaza
- Contract number
- D44036C
- Type
- Construction: BuildingConstruction
- Term
- Nov 24, 2010 → Jun 27, 20143.6 years
- Approved
- Nov 24, 2010
- Status
- Ended
- Amount
- $3,985,250
- Spent to date
- $3,513,619 · 88% of the amount
Provide egress stairs - terrace level esp cultural education centerOffice of General Services - Design & ConstructionOct 21, 2010 – Dec 27, 2012$1,560,731
- Description
- Provide egress stairs - terrace level esp cultural education center
- Contract number
- D43538C
- Type
- Construction: BuildingConstruction
- Term
- Oct 21, 2010 → Dec 27, 20122.2 years
- Approved
- Nov 3, 2011
- Status
- Ended
- Amount
- $1,560,731
- Spent to date
- $1,556,468 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building22 contracts$17.1M
- Contract not subject to state pre-audit2 contracts$2.0M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $1.6M | 1 |
| 2008: 0 contracts, $0.0 | 0 |
| 2009: 0 contracts, $0.0 | 0 |
| 2010: 6 contracts, $7.2M | 6 |
| 2011: 8 contracts, $5.3M | 8 |
| 2012: 5 contracts, $1.3M | 5 |
| 2013: 4 contracts, $3.6M | 4 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 0 contracts, $0.0 | 0 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 74/100): $19M in contracts, works with 4 agencies; but no contract since 2017.
- Contract volume+12.3measured
$19M in current contract value across 24 contracts, more than 90% of scored contractors.
- Recent activity−3.3measured
No active contracts today; the most recent was approved in September 2017.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+2.3measured
First contract started in August 2007 (19 years of contract history).
- Contract-type mix+4.7measured
2 contract types; the largest group is construction (90% of value). Goods and services contracts are 90% of the total.
- Spending vs. value0.0measured
On 24 completed contracts with spending recorded, spending is 94% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 74 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
Je Sheehan Contracting Corp
Potsdam, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $20.4M
- Contracts
- 25
- Active
- 3
- B
General Roofing Contractors LLC
Construction & Renovation
Since 20158 agencies
- Contract value
- $17.2M
- Contracts
- 21
- Active
- 0
- A
RB Robinson Contracting Inc
Construction & Renovation
Since 20146 agencies
- Contract value
- $14.4M
- Contracts
- 14
- Active
- 0
- A
Arrow Steel Window Corp
Farmingdale, NYConstruction & Renovation
Since 20075 agencies
- Contract value
- $14.2M
- Contracts
- 7
- Active
- 1
- A
Pro Con Group Inc
Staten Island, NYConstruction & Renovation
Since 20184 agencies
- Contract value
- $26.4M
- Contracts
- 8
- Active
- 1
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- Department of Environmental Conservation contractors
- Central New York Psychiatric Center contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.