General Roofing Contractors LLC
BState contracts since 2015Updated Nov 13, 2026
General Roofing Contractors LLC holds 21 contracts worth $17.2M with 8 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2015.
- Total contract value
- $17.2M
- Current contract amounts
- Spent to date
- $16.6M
- 96% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 21
- Since 2015
- Agencies served
- 8
- Most with Office of General Services - Design & Construction
- Years active
- 11
- First contract 2015
Contact & company
Business information and how to reach the company.
Contracts
21 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Roof rehabilitation NYSDEC Training Academy Village of Cleveland Oswego County D012002Construction: Building | Department of Environmental Conservation | Construction: BuildingConstruction | D012002 | Mar 29, 2021to Nov 29, 2021 | Mar 29, 2021 | Nov 29, 2021 | $1,088,222$1,030,962 spent | $1,030,962 | |
Replace roofing bldg 132 Attica CF Wyoming County DM3113CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3113C | Jan 20, 2021to Oct 5, 2021 | Jan 20, 2021 | Oct 5, 2021 | $595,222$562,422 spent | $562,422 | |
Replace Roofs & Provide Exterior Stairs Brookwood Secure Facility Columbia County D45319CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45319C | Oct 9, 2020to Apr 10, 2022 | Oct 9, 2020 | Apr 10, 2022 | $1,138,222$1,101,936 spent | $1,101,936 | |
Bid# c11906a re-bid of old lib T991289Contract not subject to state pre-audit | College at New Paltz | Contract not subject to state pre-auditNot pre-audited | T991289 | Feb 20, 2020to Mar 31, 2021 | Feb 20, 2020 | Mar 31, 2021 | $694,300$694,300 spent | $694,300 | |
Replace Mayfield Office Roof Fulton County D042015Construction: Building | Hudson River - Black River Regulating District | Construction: BuildingConstruction | D042015 | Mar 15, 2019to Dec 31, 2019 | Mar 15, 2019 | Dec 31, 2019 | $81,261$0 spent | $0 | |
Replace EPDM Roofs Auburn Armory Cayuga County DQ1777CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1777C | Mar 7, 2019to Aug 7, 2020 | Mar 7, 2019 | Aug 7, 2020 | $641,023$628,881 spent | $628,881 | |
Replace Roof & Siding Salt Dome Columbia County DOT Region 8 D45758CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45758C | Sep 25, 2018to Aug 19, 2019 | Sep 25, 2018 | Aug 19, 2019 | $286,011$268,070 spent | $268,070 | |
Replace Roof Bld 23 West Wing Clinton CF Clinton County DED896TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED896T | Sep 7, 2018to Jan 10, 2019 | Sep 7, 2018 | Jan 10, 2019 | $275,299$257,229 spent | $257,229 | |
SUCF061013 Replace Roofs - Va T006430Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006430 | Jul 6, 2018to Nov 10, 2020 | Jul 6, 2018 | Nov 10, 2020 | $2,806,397$2,806,397 spent | $2,806,397 | |
Replace Roofs Bldgs 144 & 152 Groveland CF Livingston County DQ1731CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1731C | Jun 1, 2018to Oct 10, 2019 | Jun 1, 2018 | Oct 10, 2019 | $1,308,743$1,282,565 spent | $1,282,565 | |
Replace Roofing, Building 73, Albion CF, Orleans County DM3093CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3093C | May 8, 2018to Feb 28, 2019 | May 8, 2018 | Feb 28, 2019 | $694,828$649,080 spent | $649,080 | |
Replace roof, Bldg. 18, State Campus, Albany County D45515CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45515C | Feb 14, 2018to Apr 10, 2019 | Feb 14, 2018 | Apr 10, 2019 | $2,635,198$2,487,825 spent | $2,487,825 | |
Replace Roof, Building 22, Clinton CF Warren County (GC) DM3086CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3086C | Oct 20, 2017to Aug 18, 2018 | Oct 20, 2017 | Aug 18, 2018 | $174,398$149,366 spent | $149,366 | |
Ciw roofing re-cover d079dx T300405Contract not subject to state pre-audit | SUNY at Binghamton | Contract not subject to state pre-auditNot pre-audited | T300405 | Aug 18, 2017to Jan 22, 2018 | Aug 18, 2017 | Jan 22, 2018 | $153,785$153,785 spent | $153,785 | |
Repair Leaking Roof & Int. Fin DED368TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED368T | Dec 5, 2016to Apr 5, 2017 | Dec 5, 2016 | Apr 5, 2017 | $150,000$107,129 spent | $107,129 | |
Replace Roofing System, Wood Siding, Program Bldg #4 @ Altona CF, Clinton County D45203CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45203C | Nov 7, 2016to Feb 5, 2018 | Nov 7, 2016 | Feb 5, 2018 | $784,847$773,039 spent | $773,039 | |
Replace Various Roofs Kingston State Armory Ulster County DQ1633CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1633C | Jul 22, 2016to Feb 18, 2018 | Jul 22, 2016 | Feb 18, 2018 | $757,959$746,412 spent | $746,412 | |
Roof replacement (vroman and w T000533Contract not subject to state pre-audit | College of Agriculture and Technology at Cobleskill | Contract not subject to state pre-auditNot pre-audited | T000533 | May 1, 2016to Aug 31, 2016 | May 1, 2016 | Aug 31, 2016 | $479,776$477,611 spent | $477,611 | |
Replace Roofs, Buildings 46 & 11, I Block & G Block, Elmira CF D44962CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44962C | Apr 25, 2016to Dec 26, 2017 | Apr 25, 2016 | Dec 26, 2017 | $1,046,348$1,023,634 spent | $1,023,634 | |
Replace Roofs, North Housing Units, Otisville CF, Orange County D45002CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45002C | Nov 23, 2015to Jan 18, 2017 | Nov 23, 2015 | Jan 18, 2017 | $960,632$940,171 spent | $940,171 |
Roof rehabilitation NYSDEC Training Academy Village of Cleveland Oswego CountyDepartment of Environmental ConservationMar 29, 2021 – Nov 29, 2021$1,088,222
- Description
- Roof rehabilitation NYSDEC Training Academy Village of Cleveland Oswego County
- Contract number
- D012002
- Type
- Construction: BuildingConstruction
- Term
- Mar 29, 2021 → Nov 29, 20218 months
- Approved
- Mar 29, 2021
- Status
- Ended
- Amount
- $1,088,222
- Spent to date
- $1,030,962 · 95% of the amount
Replace roofing bldg 132 Attica CF Wyoming CountyOffice of General Services - Design & ConstructionJan 20, 2021 – Oct 5, 2021$595,222
- Description
- Replace roofing bldg 132 Attica CF Wyoming County
- Contract number
- DM3113C
- Type
- Construction: BuildingConstruction
- Term
- Jan 20, 2021 → Oct 5, 20218 months
- Approved
- Jan 20, 2021
- Status
- Ended
- Amount
- $595,222
- Spent to date
- $562,422 · 94% of the amount
Replace Roofs & Provide Exterior Stairs Brookwood Secure Facility Columbia CountyOffice of General Services - Design & ConstructionOct 9, 2020 – Apr 10, 2022$1,138,222
- Description
- Replace Roofs & Provide Exterior Stairs Brookwood Secure Facility Columbia County
- Contract number
- D45319C
- Type
- Construction: BuildingConstruction
- Term
- Oct 9, 2020 → Apr 10, 20221.5 years
- Approved
- Oct 9, 2020
- Status
- Ended
- Amount
- $1,138,222
- Spent to date
- $1,101,936 · 97% of the amount
Bid# c11906a re-bid of old libCollege at New PaltzFeb 20, 2020 – Mar 31, 2021$694,300
- Description
- Bid# c11906a re-bid of old lib
- Contract number
- T991289
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at New Paltz
- Term
- Feb 20, 2020 → Mar 31, 202113 months
- Approved
- Mar 27, 2020
- Status
- Ended
- Amount
- $694,300
- Spent to date
- $694,300 · 100% of the amount
Replace Mayfield Office Roof Fulton CountyHudson River - Black River Regulating DistrictMar 15, 2019 – Dec 31, 2019$81,261
- Description
- Replace Mayfield Office Roof Fulton County
- Contract number
- D042015
- Type
- Construction: BuildingConstruction
- Term
- Mar 15, 2019 → Dec 31, 201910 months
- Approved
- Mar 15, 2019
- Status
- Ended
- Amount
- $81,261
- Spent to date
- $0 · 0% of the amount
Replace EPDM Roofs Auburn Armory Cayuga CountyOffice of General Services - Design & ConstructionMar 7, 2019 – Aug 7, 2020$641,023
- Description
- Replace EPDM Roofs Auburn Armory Cayuga County
- Contract number
- DQ1777C
- Type
- Construction: BuildingConstruction
- Term
- Mar 7, 2019 → Aug 7, 202017 months
- Approved
- Mar 7, 2019
- Status
- Ended
- Amount
- $641,023
- Spent to date
- $628,881 · 98% of the amount
Replace Roof & Siding Salt Dome Columbia County DOT Region 8Office of General Services - Design & ConstructionSep 25, 2018 – Aug 19, 2019$286,011
- Description
- Replace Roof & Siding Salt Dome Columbia County DOT Region 8
- Contract number
- D45758C
- Type
- Construction: BuildingConstruction
- Term
- Sep 25, 2018 → Aug 19, 201911 months
- Approved
- Sep 25, 2018
- Status
- Ended
- Amount
- $286,011
- Spent to date
- $268,070 · 94% of the amount
Replace Roof Bld 23 West Wing Clinton CF Clinton CountyOffice of General Services - Design & ConstructionSep 7, 2018 – Jan 10, 2019$275,299
- Description
- Replace Roof Bld 23 West Wing Clinton CF Clinton County
- Contract number
- DED896T
- Type
- Construction: BuildingConstruction
- Term
- Sep 7, 2018 → Jan 10, 20194 months
- Approved
- Oct 30, 2018
- Status
- Ended
- Amount
- $275,299
- Spent to date
- $257,229 · 93% of the amount
SUCF061013 Replace Roofs - VaState University Construction FundJul 6, 2018 – Nov 10, 2020$2,806,397
- Description
- SUCF061013 Replace Roofs - Va
- Contract number
- T006430
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jul 6, 2018 → Nov 10, 20202.3 years
- Approved
- Jul 6, 2018
- Status
- Ended
- Amount
- $2,806,397
- Spent to date
- $2,806,397 · 100% of the amount
Replace Roofs Bldgs 144 & 152 Groveland CF Livingston CountyOffice of General Services - Design & ConstructionJun 1, 2018 – Oct 10, 2019$1,308,743
- Description
- Replace Roofs Bldgs 144 & 152 Groveland CF Livingston County
- Contract number
- DQ1731C
- Type
- Construction: BuildingConstruction
- Term
- Jun 1, 2018 → Oct 10, 201916 months
- Approved
- Jun 1, 2018
- Status
- Ended
- Amount
- $1,308,743
- Spent to date
- $1,282,565 · 98% of the amount
Replace Roofing, Building 73, Albion CF, Orleans CountyOffice of General Services - Design & ConstructionMay 8, 2018 – Feb 28, 2019$694,828
- Description
- Replace Roofing, Building 73, Albion CF, Orleans County
- Contract number
- DM3093C
- Type
- Construction: BuildingConstruction
- Term
- May 8, 2018 → Feb 28, 201910 months
- Approved
- May 8, 2018
- Status
- Ended
- Amount
- $694,828
- Spent to date
- $649,080 · 93% of the amount
Replace roof, Bldg. 18, State Campus, Albany CountyOffice of General Services - Design & ConstructionFeb 14, 2018 – Apr 10, 2019$2,635,198
- Description
- Replace roof, Bldg. 18, State Campus, Albany County
- Contract number
- D45515C
- Type
- Construction: BuildingConstruction
- Term
- Feb 14, 2018 → Apr 10, 201914 months
- Approved
- Feb 14, 2018
- Status
- Ended
- Amount
- $2,635,198
- Spent to date
- $2,487,825 · 94% of the amount
Replace Roof, Building 22, Clinton CF Warren County (GC)Office of General Services - Design & ConstructionOct 20, 2017 – Aug 18, 2018$174,398
- Description
- Replace Roof, Building 22, Clinton CF Warren County (GC)
- Contract number
- DM3086C
- Type
- Construction: BuildingConstruction
- Term
- Oct 20, 2017 → Aug 18, 201810 months
- Approved
- Oct 20, 2017
- Status
- Ended
- Amount
- $174,398
- Spent to date
- $149,366 · 86% of the amount
Ciw roofing re-cover d079dxSUNY at BinghamtonAug 18, 2017 – Jan 22, 2018$153,785
- Description
- Ciw roofing re-cover d079dx
- Contract number
- T300405
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Binghamton
- Term
- Aug 18, 2017 → Jan 22, 20185 months
- Approved
- Aug 9, 2017
- Status
- Ended
- Amount
- $153,785
- Spent to date
- $153,785 · 100% of the amount
Repair Leaking Roof & Int. FinOffice of General Services - Design & ConstructionDec 5, 2016 – Apr 5, 2017$150,000
- Description
- Repair Leaking Roof & Int. Fin
- Contract number
- DED368T
- Type
- Construction: BuildingConstruction
- Term
- Dec 5, 2016 → Apr 5, 20174 months
- Approved
- Jan 6, 2017
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $107,129 · 71% of the amount
Replace Roofing System, Wood Siding, Program Bldg #4 @ Altona CF, Clinton CountyOffice of General Services - Design & ConstructionNov 7, 2016 – Feb 5, 2018$784,847
- Description
- Replace Roofing System, Wood Siding, Program Bldg #4 @ Altona CF, Clinton County
- Contract number
- D45203C
- Type
- Construction: BuildingConstruction
- Term
- Nov 7, 2016 → Feb 5, 201815 months
- Approved
- Nov 7, 2016
- Status
- Ended
- Amount
- $784,847
- Spent to date
- $773,039 · 98% of the amount
Replace Various Roofs Kingston State Armory Ulster CountyOffice of General Services - Design & ConstructionJul 22, 2016 – Feb 18, 2018$757,959
- Description
- Replace Various Roofs Kingston State Armory Ulster County
- Contract number
- DQ1633C
- Type
- Construction: BuildingConstruction
- Term
- Jul 22, 2016 → Feb 18, 20181.6 years
- Approved
- Jul 22, 2016
- Status
- Ended
- Amount
- $757,959
- Spent to date
- $746,412 · 98% of the amount
Roof replacement (vroman and wCollege of Agriculture and Technology at CobleskillMay 1, 2016 – Aug 31, 2016$479,776
- Description
- Roof replacement (vroman and w
- Contract number
- T000533
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 1, 2016 → Aug 31, 20164 months
- Approved
- May 6, 2016
- Status
- Ended
- Amount
- $479,776
- Spent to date
- $477,611 · 100% of the amount
Replace Roofs, Buildings 46 & 11, I Block & G Block, Elmira CFOffice of General Services - Design & ConstructionApr 25, 2016 – Dec 26, 2017$1,046,348
- Description
- Replace Roofs, Buildings 46 & 11, I Block & G Block, Elmira CF
- Contract number
- D44962C
- Type
- Construction: BuildingConstruction
- Term
- Apr 25, 2016 → Dec 26, 20171.7 years
- Approved
- Apr 25, 2016
- Status
- Ended
- Amount
- $1,046,348
- Spent to date
- $1,023,634 · 98% of the amount
Replace Roofs, North Housing Units, Otisville CF, Orange CountyOffice of General Services - Design & ConstructionNov 23, 2015 – Jan 18, 2017$960,632
- Description
- Replace Roofs, North Housing Units, Otisville CF, Orange County
- Contract number
- D45002C
- Type
- Construction: BuildingConstruction
- Term
- Nov 23, 2015 → Jan 18, 201714 months
- Approved
- Nov 23, 2015
- Status
- Ended
- Amount
- $960,632
- Spent to date
- $940,171 · 98% of the amount
Contract-type mix
Share of contract value by type
- Construction17 contracts$13.1M
- Contract not subject to state pre-audit4 contracts$4.1M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2015: 2 contracts, $1.4M | 2 |
| 2016: 5 contracts, $3.2M | 5 |
| 2017: 2 contracts, $328.2K | 2 |
| 2018: 6 contracts, $8.0M | 6 |
| 2019: 2 contracts, $722.3K | 2 |
| 2020: 2 contracts, $1.8M | 2 |
| 2021: 2 contracts, $1.7M | 2 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 77/100): $17M in contracts, works with 8 agencies.
- Contract volume+12.0measured
$17M in current contract value across 21 contracts, more than 89% of scored contractors.
- Recent activity−1.2measured
No active contracts today; the most recent was approved in March 2021.
- Agency breadth+11.5measured
Contracts with 8 different state agencies and facilities.
- Experience−0.9measured
First contract started in July 2015 (11 years of contract history).
- Contract-type mix+5.1measured
3 contract types; the largest group is construction (76% of value). Goods and services contracts are 76% of the total.
- Spending vs. value+0.1measured
On 20 completed contracts with spending recorded, spending is 97% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 77 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction14 contracts$11.4M
- State University Construction Fund1 contract$2.8M
- Department of Environmental Conservation1 contract$1.1M
- College at New Paltz1 contract$694.3K
- Office of Parks Recreation & Historic Preservation1 contract$485.3K
- College of Agriculture and Technology at Cobleskill1 contract$479.8K
- SUNY at Binghamton1 contract$153.8K
- Hudson River - Black River Regulating District1 contract$81.3K
Similar contractors
- B
Window Specialist Inc
Construction & Renovation
Since 20078 agencies
- Contract value
- $6.7M
- Contracts
- 14
- Active
- 0
- A
Butler Construction Group Inc
Construction & Renovation
Since 20175 agencies
- Contract value
- $49.5M
- Contracts
- 13
- Active
- 2
- A
VMJR Companies LLC
Glens Falls, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $60.0M
- Contracts
- 30
- Active
- 5
- A
Stilsing Electric Inc
Rensselaer, NYConstruction & Renovation
Since 20087 agencies
- Contract value
- $68.4M
- Contracts
- 133
- Active
- 23
- A
J & K Plumbing and Heating Co Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $93.8M
- Contracts
- 77
- Active
- 4
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- Department of Environmental Conservation contractors
- College at New Paltz contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.