Skip to content
NY State contractorConstruction & Renovation

Frey Electric Construction Co Inc

Tonawanda, NY State contracts since 2007Updated Nov 13, 2026

Frey Electric Construction Co Inc holds 35 contracts worth $38.8M with 6 New York State agencies, most with Office of General Services - Design & Construction; 5 active today. The first started in 2007.

Total contract value
$38.8M
Current contract amounts
Spent to date
$29.7M
76% of contract value
Active contracts
5
$2.8M in active value
Contracts on record
35
Since 2007
Agencies served
6
Most with Office of General Services - Design & Construction
Years active
19
First contract 2007

Contact & company

Business information and how to reach the company.

Address

100 Pearce AveTonawanda, NY 14150Erie County
Legal name
Frey Electric Construction Co. Inc.
Identifiers
UEI G9NJLS8N6R35 · CAGE 3N1R7
Federal registration
Active · renews by Jun 2027
In business since
1950

Industry codes (NAICS)

  • 238210Electrical Contractors and Other Wiring Installation Contractors

Leadership

  • Kent Frey

    CEO

  • Jeff Avolio-Farr

    Controller

Contracts

35 contracts with New York State agencies, active first. Open a row for the full record.

Contracts
DetailsContractTypeContract no.Term

Falconwood roof replacement electrical work Beaver Island State Park Erie County

D006528Construction: BuildingActive

Office of Parks Recreation & Historic PreservationConstruction: BuildingConstructionD006528Jul 23, 2026to Apr 29, 2027Jul 23, 2026Apr 29, 2027$489,000$0 spent$0

Electrical work for lab renovation at Furnas Hall University at Buffalo in Erie County

D000129Construction: BuildingActive

SUNY at BuffaloConstruction: BuildingConstructionD000129May 15, 2026to Mar 30, 2028May 15, 2026Mar 30, 2028$780,000$110,104 spent$110,104

Electrical work for lodge roofing replacement at Woodlawn Beach State Park in Erie County

D006529Construction: BuildingActive

Office of Parks Recreation & Historic PreservationConstruction: BuildingConstructionD006529Apr 24, 2026to May 29, 2027Apr 24, 2026May 29, 2027$490,000$0 spent$0

Electrical to renovate special care and oral facial pain clinics in Erie County

D000125Construction: BuildingActive

SUNY at BuffaloConstruction: BuildingConstructionD000125Mar 25, 2026to Jan 15, 2028Mar 25, 2026Jan 15, 2028$570,000$73,955 spent$73,955

Orthodontic clinic renovations at Squire Hall in Erie county- electrical contractor

D000080Construction: BuildingActive

SUNY at BuffaloConstruction: BuildingConstructionD000080Dec 31, 2024to Dec 30, 2026Dec 31, 2024Dec 30, 2026$480,000$480,000 spent$480,000

PA filed contract SUNY Buffalo Ellicott Complex Phase 6 Red Jacket Quad including asbestos & HAZMAT

D229780Contract not subject to state pre-audit

Dormitory Authority of the State of New YorkContract not subject to state pre-auditNot pre-auditedD229780Mar 27, 2025to Jul 21, 2026Mar 27, 2025Jul 21, 2026$2,130,000$0 spent$0

PA filed contract SUNY University at Buffalo ellicott electrical upgrades Phase 5 and asbestos

D225242Contract not subject to state pre-audit

Dormitory Authority of the State of New YorkContract not subject to state pre-auditNot pre-auditedD225242Jan 18, 2024to Aug 1, 2025Jan 18, 2024Aug 1, 2025$1,811,000$0 spent$0

Replace emergency generators at SUNY Fredonia

D006867Construction: Building

State University Construction FundConstruction: BuildingConstructionD006867Nov 29, 2023to Sep 14, 2026Nov 29, 2023Sep 14, 2026$2,443,050$2,443,050 spent$2,443,050

Main Stage House Lighting Upgrades Artpark State Park Niagara County

D006183Construction: Building

Office of Parks Recreation & Historic PreservationConstruction: BuildingConstructionD006183Nov 17, 2023to Apr 1, 2025Nov 17, 2023Apr 1, 2025$886,884$886,884 spent$886,884

Emergency generators replacement in Cooke, Hochstetter and Dorsheimer buildings at SUNY Buffalo

D006813Construction: Miscellaneous

State University Construction FundConstruction: MiscellaneousConstructionD006813Apr 19, 2023to Jun 21, 2026Apr 19, 2023Jun 21, 2026$3,401,553$3,401,553 spent$3,401,553

PA Filed Contract SUNY Buffalo Ellicott Complex Fargo Quad Phase 4 electrical upgrades Erie County

D221990Contract not subject to state pre-audit

Dormitory Authority of the State of New YorkContract not subject to state pre-auditNot pre-auditedD221990Feb 22, 2023to May 31, 2024Feb 22, 2023May 31, 2024$1,570,000$0 spent$0

Electrical work Kenan Castellani buildout phase 2 DeVeaux Woods SP Niagara County

D005839Construction: Building

Office of Parks Recreation & Historic PreservationConstruction: BuildingConstructionD005839Nov 19, 2021to Aug 16, 2022Nov 19, 2021Aug 16, 2022$420,117$420,117 spent$420,117

Provide facility wide CCTV/audio monitoring system and recording room Wende CF Erie County

D45849EConstruction: Building

Office of General Services - Design & ConstructionConstruction: BuildingConstructionD45849EMay 16, 2021to Jul 8, 2026May 16, 2021Jul 8, 2026$7,937,836$7,351,464 spent$7,351,464

Biomedical research building pharmacy renovation electric Buffalo Erie County

D000005Construction: Building

SUNY at BuffaloConstruction: BuildingConstructionD000005Mar 18, 2021to May 31, 2023Mar 18, 2021May 31, 2023$462,266$462,266 spent$462,266

Replacement of switchgear and panels at Upton Hall and Campbell student union building

D200221Construction: Building

College at BuffaloConstruction: BuildingConstructionD200221Jan 13, 2021to Mar 31, 2022Jan 13, 2021Mar 31, 2022$2,973,054$2,973,054 spent$2,973,054

Electrical construction for relocation of Buhite DiMino Center for Implant Dentistry

D000002Construction: Miscellaneous

SUNY at BuffaloConstruction: MiscellaneousConstructionD000002Dec 1, 2020to Oct 1, 2023Dec 1, 2020Oct 1, 2023$364,746$364,746 spent$364,746

Provide Classrooms & Office Space Bldg 34 Residential Rehab Unit Orleans CF Orleans County

D46134EConstruction: Building

Office of General Services - Design & ConstructionConstruction: BuildingConstructionD46134ESep 8, 2020to Mar 29, 2023Sep 8, 2020Mar 29, 2023$859,253$857,283 spent$857,283

Correct flood damage Building 51 Buffalo PC Erie County

DEE393EConstruction: Building

Office of General Services - Design & ConstructionConstruction: BuildingConstructionDEE393EJul 20, 2020to Feb 14, 2022Jul 20, 2020Feb 14, 2022$300,000$139,175 spent$139,175

Switchgear replacement in baco

T180185Contract not subject to state pre-audit

College at BuffaloContract not subject to state pre-auditNot pre-auditedT180185Apr 3, 2019to Dec 31, 2019Apr 3, 2019Dec 31, 2019$990,236$493,236 spent$493,236

2017-091C library storage anne

T500093Contract not subject to state pre-audit

SUNY at BuffaloContract not subject to state pre-auditNot pre-auditedT500093May 19, 2018to Dec 20, 2019May 19, 2018Dec 20, 2019$95,595$95,595 spent$95,595
Falconwood roof replacement electrical work Beaver Island State Park Erie CountyOffice of Parks Recreation & Historic PreservationJul 23, 2026 – Apr 29, 2027Active$489,000
Description
Falconwood roof replacement electrical work Beaver Island State Park Erie County
Contract number
D006528
Type
Construction: BuildingConstruction
Term
Jul 23, 2026 → Apr 29, 20279 months
Approved
Jul 23, 2026
Status
Active
Amount
$489,000
Spent to date
$0 · 0% of the amount
Electrical work for lab renovation at Furnas Hall University at Buffalo in Erie CountySUNY at BuffaloMay 15, 2026 – Mar 30, 2028Active$780,000
Description
Electrical work for lab renovation at Furnas Hall University at Buffalo in Erie County
Contract number
D000129
Type
Construction: BuildingConstruction
Term
May 15, 2026 → Mar 30, 20281.9 years
Approved
May 15, 2026
Status
Active
Amount
$780,000
Spent to date
$110,104 · 14% of the amount
Electrical work for lodge roofing replacement at Woodlawn Beach State Park in Erie CountyOffice of Parks Recreation & Historic PreservationApr 24, 2026 – May 29, 2027Active$490,000
Description
Electrical work for lodge roofing replacement at Woodlawn Beach State Park in Erie County
Contract number
D006529
Type
Construction: BuildingConstruction
Term
Apr 24, 2026 → May 29, 202713 months
Approved
Apr 24, 2026
Status
Active
Amount
$490,000
Spent to date
$0 · 0% of the amount
Electrical to renovate special care and oral facial pain clinics in Erie CountySUNY at BuffaloMar 25, 2026 – Jan 15, 2028Active$570,000
Description
Electrical to renovate special care and oral facial pain clinics in Erie County
Contract number
D000125
Type
Construction: BuildingConstruction
Term
Mar 25, 2026 → Jan 15, 20281.8 years
Approved
Mar 25, 2026
Status
Active
Amount
$570,000
Spent to date
$73,955 · 13% of the amount
Orthodontic clinic renovations at Squire Hall in Erie county- electrical contractorSUNY at BuffaloDec 31, 2024 – Dec 30, 2026Active$480,000
Description
Orthodontic clinic renovations at Squire Hall in Erie county- electrical contractor
Contract number
D000080
Type
Construction: BuildingConstruction
Term
Dec 31, 2024 → Dec 30, 20262 years
Approved
Dec 31, 2024
Status
Active
Amount
$480,000
Spent to date
$480,000 · 100% of the amount
PA filed contract SUNY Buffalo Ellicott Complex Phase 6 Red Jacket Quad including asbestos & HAZMATDormitory Authority of the State of New YorkMar 27, 2025 – Jul 21, 2026$2,130,000
Description
PA filed contract SUNY Buffalo Ellicott Complex Phase 6 Red Jacket Quad including asbestos & HAZMAT
Contract number
D229780
Type
Contract not subject to state pre-auditNot pre-audited
Term
Mar 27, 2025 → Jul 21, 202616 months
Approved
Apr 22, 2025
Status
Ended
Amount
$2,130,000
Spent to date
$0 · 0% of the amount
PA filed contract SUNY University at Buffalo ellicott electrical upgrades Phase 5 and asbestosDormitory Authority of the State of New YorkJan 18, 2024 – Aug 1, 2025$1,811,000
Description
PA filed contract SUNY University at Buffalo ellicott electrical upgrades Phase 5 and asbestos
Contract number
D225242
Type
Contract not subject to state pre-auditNot pre-audited
Term
Jan 18, 2024 → Aug 1, 20251.5 years
Approved
Mar 27, 2024
Status
Ended
Amount
$1,811,000
Spent to date
$0 · 0% of the amount
Replace emergency generators at SUNY FredoniaState University Construction FundNov 29, 2023 – Sep 14, 2026$2,443,050
Description
Replace emergency generators at SUNY Fredonia
Contract number
D006867
Type
Construction: BuildingConstruction
Term
Nov 29, 2023 → Sep 14, 20262.8 years
Approved
Nov 24, 2023
Status
Ended
Amount
$2,443,050
Spent to date
$2,443,050 · 100% of the amount
Main Stage House Lighting Upgrades Artpark State Park Niagara CountyOffice of Parks Recreation & Historic PreservationNov 17, 2023 – Apr 1, 2025$886,884
Description
Main Stage House Lighting Upgrades Artpark State Park Niagara County
Contract number
D006183
Type
Construction: BuildingConstruction
Term
Nov 17, 2023 → Apr 1, 202516 months
Approved
Nov 17, 2023
Status
Ended
Amount
$886,884
Spent to date
$886,884 · 100% of the amount
Emergency generators replacement in Cooke, Hochstetter and Dorsheimer buildings at SUNY BuffaloState University Construction FundApr 19, 2023 – Jun 21, 2026$3,401,553
Description
Emergency generators replacement in Cooke, Hochstetter and Dorsheimer buildings at SUNY Buffalo
Contract number
D006813
Type
Construction: MiscellaneousConstruction
Term
Apr 19, 2023 → Jun 21, 20263.2 years
Approved
Apr 17, 2023
Status
Ended
Amount
$3,401,553
Spent to date
$3,401,553 · 100% of the amount
PA Filed Contract SUNY Buffalo Ellicott Complex Fargo Quad Phase 4 electrical upgrades Erie CountyDormitory Authority of the State of New YorkFeb 22, 2023 – May 31, 2024$1,570,000
Description
PA Filed Contract SUNY Buffalo Ellicott Complex Fargo Quad Phase 4 electrical upgrades Erie County
Contract number
D221990
Type
Contract not subject to state pre-auditNot pre-audited
Term
Feb 22, 2023 → May 31, 202415 months
Approved
Mar 10, 2023
Status
Ended
Amount
$1,570,000
Spent to date
$0 · 0% of the amount
Electrical work Kenan Castellani buildout phase 2 DeVeaux Woods SP Niagara CountyOffice of Parks Recreation & Historic PreservationNov 19, 2021 – Aug 16, 2022$420,117
Description
Electrical work Kenan Castellani buildout phase 2 DeVeaux Woods SP Niagara County
Contract number
D005839
Type
Construction: BuildingConstruction
Term
Nov 19, 2021 → Aug 16, 20229 months
Approved
Nov 19, 2021
Status
Ended
Amount
$420,117
Spent to date
$420,117 · 100% of the amount
Provide facility wide CCTV/audio monitoring system and recording room Wende CF Erie CountyOffice of General Services - Design & ConstructionMay 16, 2021 – Jul 8, 2026$7,937,836
Description
Provide facility wide CCTV/audio monitoring system and recording room Wende CF Erie County
Contract number
D45849E
Type
Construction: BuildingConstruction
Term
May 16, 2021 → Jul 8, 20265.2 years
Approved
May 16, 2021
Status
Ended
Amount
$7,937,836
Spent to date
$7,351,464 · 93% of the amount
Biomedical research building pharmacy renovation electric Buffalo Erie CountySUNY at BuffaloMar 18, 2021 – May 31, 2023$462,266
Description
Biomedical research building pharmacy renovation electric Buffalo Erie County
Contract number
D000005
Type
Construction: BuildingConstruction
Term
Mar 18, 2021 → May 31, 20232.2 years
Approved
Mar 18, 2021
Status
Ended
Amount
$462,266
Spent to date
$462,266 · 100% of the amount
Replacement of switchgear and panels at Upton Hall and Campbell student union buildingCollege at BuffaloJan 13, 2021 – Mar 31, 2022$2,973,054
Description
Replacement of switchgear and panels at Upton Hall and Campbell student union building
Contract number
D200221
Type
Construction: BuildingConstruction
Term
Jan 13, 2021 → Mar 31, 202215 months
Approved
Feb 8, 2021
Status
Ended
Amount
$2,973,054
Spent to date
$2,973,054 · 100% of the amount
Electrical construction for relocation of Buhite DiMino Center for Implant DentistrySUNY at BuffaloDec 1, 2020 – Oct 1, 2023$364,746
Description
Electrical construction for relocation of Buhite DiMino Center for Implant Dentistry
Contract number
D000002
Type
Construction: MiscellaneousConstruction
Term
Dec 1, 2020 → Oct 1, 20232.8 years
Approved
Dec 14, 2020
Status
Ended
Amount
$364,746
Spent to date
$364,746 · 100% of the amount
Provide Classrooms & Office Space Bldg 34 Residential Rehab Unit Orleans CF Orleans CountyOffice of General Services - Design & ConstructionSep 8, 2020 – Mar 29, 2023$859,253
Description
Provide Classrooms & Office Space Bldg 34 Residential Rehab Unit Orleans CF Orleans County
Contract number
D46134E
Type
Construction: BuildingConstruction
Term
Sep 8, 2020 → Mar 29, 20232.6 years
Approved
Sep 8, 2020
Status
Ended
Amount
$859,253
Spent to date
$857,283 · 100% of the amount
Correct flood damage Building 51 Buffalo PC Erie CountyOffice of General Services - Design & ConstructionJul 20, 2020 – Feb 14, 2022$300,000
Description
Correct flood damage Building 51 Buffalo PC Erie County
Contract number
DEE393E
Type
Construction: BuildingConstruction
Term
Jul 20, 2020 → Feb 14, 20221.6 years
Approved
Sep 9, 2020
Status
Ended
Amount
$300,000
Spent to date
$139,175 · 46% of the amount
Switchgear replacement in bacoCollege at BuffaloApr 3, 2019 – Dec 31, 2019$990,236
Description
Switchgear replacement in baco
Contract number
T180185
Type
Contract not subject to state pre-auditNot pre-audited
Term
Apr 3, 2019 → Dec 31, 20199 months
Approved
Apr 4, 2019
Status
Ended
Amount
$990,236
Spent to date
$493,236 · 50% of the amount
2017-091C library storage anneSUNY at BuffaloMay 19, 2018 – Dec 20, 2019$95,595
Description
2017-091C library storage anne
Contract number
T500093
Type
Contract not subject to state pre-auditNot pre-audited
Term
May 19, 2018 → Dec 20, 20191.6 years
Approved
Jun 2, 2018
Status
Ended
Amount
$95,595
Spent to date
$95,595 · 100% of the amount
1–20 of 35Page 1 of 2

Contract-type mix

Share of contract value by type

Contracts over time

Contracts started per year

View as table
YearContracts
2007: 1 contracts, $1.9M1
2008: 0 contracts, $0.00
2009: 2 contracts, $308.9K2
2010: 1 contracts, $84.3K1
2011: 0 contracts, $0.00
2012: 4 contracts, $4.4M4
2013: 1 contracts, $829.0K1
2014: 2 contracts, $743.9K2
2015: 2 contracts, $309.3K2
2016: 2 contracts, $755.0K2
2017: 0 contracts, $0.00
2018: 1 contracts, $95.6K1
2019: 1 contracts, $990.2K1
2020: 3 contracts, $1.5M3
2021: 4 contracts, $11.8M4
2022: 0 contracts, $0.00
2023: 4 contracts, $8.3M4
2024: 2 contracts, $2.3M2
2025: 1 contracts, $2.1M1
2026: 4 contracts, $2.3M4

How the Contractor Score adds up

Extensive (A, 100/100): 5 active contracts, $39M in contracts.

  • Contract volume+14.6measured

    $39M in current contract value across 35 contracts, more than 93% of scored contractors.

  • Recent activity+17.3measured

    5 active contracts today; the most recent was approved in July 2026.

  • Agency breadth+10.3measured

    Contracts with 6 different state agencies and facilities.

  • Experience+2.3measured

    First contract started in July 2007 (19 years of contract history).

  • Contract-type mix+5.0measured

    3 contract types; the largest group is construction (74% of value). Goods and services contracts are 74% of the total.

  • Spending vs. value0.0measured

    On 27 completed contracts with spending recorded, spending is 95% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.

  • Federal award history0.0unknown

    No federal award history found. Scored as neutral.

  • Federal registration+5.2measured

    Registered to do business with the federal government (registration active).

50 + contributions = 104.7, capped at 100Starts at 50. Bars: cool adds, warm subtracts.

Agencies served

Contract value with each agency or facility

Browse more

Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.