G and M Mechanical Inc
AState contracts since 2007Updated Nov 13, 2026
G and M Mechanical Inc holds 263 contracts worth $75.0M with Office of General Services - Design & Construction; 10 active today. The first started in 2007.
- Total contract value
- $75.0M
- Current contract amounts
- Spent to date
- $42.0M
- 56% of contract value
- Active contracts
- 10
- $5.5M in active value
- Contracts on record
- 263
- Since 2007
- Agencies served
- 1
- Most with Office of General Services - Design & Construction
- Years active
- 19
- First contract 2007
Contact & company
Business information and how to reach the company.
Contracts
263 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Restore heating & cooling failures at Highland Residential Center in Ulster County DEF625HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF625H | Sep 25, 2026to Jan 23, 2027 | Sep 25, 2026 | Jan 23, 2027 | $300,000$0 spent | $0 | |
Repair hot water line Woodbourne Correctional Facility Sullivan County DEF611PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF611P | Aug 19, 2026to Dec 17, 2026 | Aug 19, 2026 | Dec 17, 2026 | $600,000$0 spent | $0 | |
Repair water line at Riverbank State Park in New York County DEF590GConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF590G | Jul 10, 2026to Jan 6, 2027 | Jul 10, 2026 | Jan 6, 2027 | $300,000$25,305 spent | $25,305 | |
Repair steam lines Staten Island DDSO Richmond County DEF582HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF582H | Jun 25, 2026to Dec 22, 2026 | Jun 25, 2026 | Dec 22, 2026 | $300,000$230,956 spent | $230,956 | |
Repair sewage blockage at Creedmor Alcohol Treatment Center in Queens County DEF568PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF568P | May 28, 2026to Nov 24, 2026 | May 28, 2026 | Nov 24, 2026 | $180,000$31,282 spent | $31,282 | |
Repair water line Eastern Correctional Facility Ulster County DEF524PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF524P | Feb 24, 2026to Dec 21, 2026 | Feb 24, 2026 | Dec 21, 2026 | $1,200,000$461,384 spent | $461,384 | |
Restore heat and repair frozen pipes at Downstate Medical Center in Kings County DEF505HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF505H | Jan 30, 2026to Nov 26, 2026 | Jan 30, 2026 | Nov 26, 2026 | $500,000$299,834 spent | $299,834 | |
Restore water issues at Wallkill Correctional Facility DEF476GConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF476G | Dec 1, 2025to Dec 31, 2026 | Dec 1, 2025 | Dec 31, 2026 | $600,000$138,315 spent | $138,315 | |
Provide temporary shoring at Otisville Correctional Facility in Orange County DEF429CConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF429C | Oct 21, 2025to Dec 1, 2026 | Oct 21, 2025 | Dec 1, 2026 | $150,000$8,158 spent | $8,158 | |
Repair hot water bundle Sing Sing Correctional Facility Westchester County DEF410PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF410P | Jul 16, 2025to Dec 31, 2026 | Jul 16, 2025 | Dec 31, 2026 | $1,400,000$880,725 spent | $880,725 | |
Repair AC Unit at Eastern Correctional Facility in Ulster County DEF589HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF589H | Jul 7, 2026to Nov 4, 2026 | Jul 7, 2026 | Nov 4, 2026 | $300,000$54,021 spent | $54,021 | |
Repair water leaks at Bedford Hills Correctional Facility in Westchester County DEF552PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF552P | Apr 24, 2026to Aug 22, 2026 | Apr 24, 2026 | Aug 22, 2026 | $300,000$71,688 spent | $71,688 | |
Repair standpipe at Bayview Correctional Facility in New York County DEF515PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF515P | Feb 10, 2026to Aug 9, 2026 | Feb 10, 2026 | Aug 9, 2026 | $300,000$30,390 spent | $30,390 | |
Repair fuel pump at Fishkill CF in Dutchess County DEF512HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF512H | Feb 6, 2026to Jun 6, 2026 | Feb 6, 2026 | Jun 6, 2026 | $300,000$85,635 spent | $85,635 | |
Restore heat at Bronx Alcohol Treatment Center in Bronx County DEF491HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF491H | Jan 12, 2026to Oct 31, 2026 | Jan 12, 2026 | Oct 31, 2026 | $415,000$334,311 spent | $334,311 | |
Repair water main break AC Powell State Office Building NYC New York County DEF488GConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF488G | Jan 2, 2026to Jun 1, 2026 | Jan 2, 2026 | Jun 1, 2026 | $200,000$182,037 spent | $182,037 | |
Restore Electrical Services at Planting Fields Arboretum in Nassau County DEF485HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF485H | Dec 26, 2025to Mar 12, 2026 | Dec 26, 2025 | Mar 12, 2026 | $300,000$39,401 spent | $39,401 | |
Repair water main break SUNY Purchase Westchester County DEF472GConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF472G | Nov 30, 2025to Mar 30, 2026 | Nov 30, 2025 | Mar 30, 2026 | $300,000$247,897 spent | $247,897 | |
Repair steam line & restore heat Taconic DDSO Dutchess County DEF469HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF469H | Nov 21, 2025to Mar 21, 2026 | Nov 21, 2025 | Mar 21, 2026 | $150,000$24,929 spent | $24,929 | |
Repair water line leaks Creedmoor Addiction Treatment Center Queens County DEF466PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF466P | Nov 17, 2025to Mar 17, 2026 | Nov 17, 2025 | Mar 17, 2026 | $100,000$22,625 spent | $22,625 |
Restore heating & cooling failures at Highland Residential Center in Ulster CountyOffice of General Services - Design & ConstructionSep 25, 2026 – Jan 23, 2027Active$300,000
- Description
- Restore heating & cooling failures at Highland Residential Center in Ulster County
- Contract number
- DEF625H
- Type
- Construction: BuildingConstruction
- Term
- Sep 25, 2026 → Jan 23, 20274 months
- Approved
- Nov 2, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $0 · 0% of the amount
Repair hot water line Woodbourne Correctional Facility Sullivan CountyOffice of General Services - Design & ConstructionAug 19, 2026 – Dec 17, 2026Active$600,000
- Description
- Repair hot water line Woodbourne Correctional Facility Sullivan County
- Contract number
- DEF611P
- Type
- Construction: BuildingConstruction
- Term
- Aug 19, 2026 → Dec 17, 20264 months
- Approved
- Sep 14, 2026
- Status
- Active
- Amount
- $600,000
- Spent to date
- $0 · 0% of the amount
Repair water line at Riverbank State Park in New York CountyOffice of General Services - Design & ConstructionJul 10, 2026 – Jan 6, 2027Active$300,000
- Description
- Repair water line at Riverbank State Park in New York County
- Contract number
- DEF590G
- Type
- Construction: BuildingConstruction
- Term
- Jul 10, 2026 → Jan 6, 20276 months
- Approved
- Aug 7, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $25,305 · 8% of the amount
Repair steam lines Staten Island DDSO Richmond CountyOffice of General Services - Design & ConstructionJun 25, 2026 – Dec 22, 2026Active$300,000
- Description
- Repair steam lines Staten Island DDSO Richmond County
- Contract number
- DEF582H
- Type
- Construction: BuildingConstruction
- Term
- Jun 25, 2026 → Dec 22, 20266 months
- Approved
- Aug 6, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $230,956 · 77% of the amount
Repair sewage blockage at Creedmor Alcohol Treatment Center in Queens CountyOffice of General Services - Design & ConstructionMay 28, 2026 – Nov 24, 2026Active$180,000
- Description
- Repair sewage blockage at Creedmor Alcohol Treatment Center in Queens County
- Contract number
- DEF568P
- Type
- Construction: BuildingConstruction
- Term
- May 28, 2026 → Nov 24, 20266 months
- Approved
- Jun 25, 2026
- Status
- Active
- Amount
- $180,000
- Spent to date
- $31,282 · 17% of the amount
Repair water line Eastern Correctional Facility Ulster CountyOffice of General Services - Design & ConstructionFeb 24, 2026 – Dec 21, 2026Active$1,200,000
- Description
- Repair water line Eastern Correctional Facility Ulster County
- Contract number
- DEF524P
- Type
- Construction: BuildingConstruction
- Term
- Feb 24, 2026 → Dec 21, 202610 months
- Approved
- Mar 18, 2026
- Status
- Active
- Amount
- $1,200,000
- Spent to date
- $461,384 · 38% of the amount
Restore heat and repair frozen pipes at Downstate Medical Center in Kings CountyOffice of General Services - Design & ConstructionJan 30, 2026 – Nov 26, 2026Active$500,000
- Description
- Restore heat and repair frozen pipes at Downstate Medical Center in Kings County
- Contract number
- DEF505H
- Type
- Construction: BuildingConstruction
- Term
- Jan 30, 2026 → Nov 26, 202610 months
- Approved
- Mar 18, 2026
- Status
- Active
- Amount
- $500,000
- Spent to date
- $299,834 · 60% of the amount
Restore water issues at Wallkill Correctional FacilityOffice of General Services - Design & ConstructionDec 1, 2025 – Dec 31, 2026Active$600,000
- Description
- Restore water issues at Wallkill Correctional Facility
- Contract number
- DEF476G
- Type
- Construction: BuildingConstruction
- Term
- Dec 1, 2025 → Dec 31, 202613 months
- Approved
- Dec 31, 2025
- Status
- Active
- Amount
- $600,000
- Spent to date
- $138,315 · 23% of the amount
Provide temporary shoring at Otisville Correctional Facility in Orange CountyOffice of General Services - Design & ConstructionOct 21, 2025 – Dec 1, 2026Active$150,000
- Description
- Provide temporary shoring at Otisville Correctional Facility in Orange County
- Contract number
- DEF429C
- Type
- Construction: BuildingConstruction
- Term
- Oct 21, 2025 → Dec 1, 202613 months
- Approved
- Nov 20, 2025
- Status
- Active
- Amount
- $150,000
- Spent to date
- $8,158 · 5% of the amount
Repair hot water bundle Sing Sing Correctional Facility Westchester CountyOffice of General Services - Design & ConstructionJul 16, 2025 – Dec 31, 2026Active$1,400,000
- Description
- Repair hot water bundle Sing Sing Correctional Facility Westchester County
- Contract number
- DEF410P
- Type
- Construction: BuildingConstruction
- Term
- Jul 16, 2025 → Dec 31, 20261.5 years
- Approved
- Jul 31, 2025
- Status
- Active
- Amount
- $1,400,000
- Spent to date
- $880,725 · 63% of the amount
Repair AC Unit at Eastern Correctional Facility in Ulster CountyOffice of General Services - Design & ConstructionJul 7, 2026 – Nov 4, 2026$300,000
- Description
- Repair AC Unit at Eastern Correctional Facility in Ulster County
- Contract number
- DEF589H
- Type
- Construction: BuildingConstruction
- Term
- Jul 7, 2026 → Nov 4, 20264 months
- Approved
- Aug 28, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $54,021 · 18% of the amount
Repair water leaks at Bedford Hills Correctional Facility in Westchester CountyOffice of General Services - Design & ConstructionApr 24, 2026 – Aug 22, 2026$300,000
- Description
- Repair water leaks at Bedford Hills Correctional Facility in Westchester County
- Contract number
- DEF552P
- Type
- Construction: BuildingConstruction
- Term
- Apr 24, 2026 → Aug 22, 20264 months
- Approved
- May 20, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $71,688 · 24% of the amount
Repair standpipe at Bayview Correctional Facility in New York CountyOffice of General Services - Design & ConstructionFeb 10, 2026 – Aug 9, 2026$300,000
- Description
- Repair standpipe at Bayview Correctional Facility in New York County
- Contract number
- DEF515P
- Type
- Construction: BuildingConstruction
- Term
- Feb 10, 2026 → Aug 9, 20266 months
- Approved
- Mar 18, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $30,390 · 10% of the amount
Repair fuel pump at Fishkill CF in Dutchess CountyOffice of General Services - Design & ConstructionFeb 6, 2026 – Jun 6, 2026$300,000
- Description
- Repair fuel pump at Fishkill CF in Dutchess County
- Contract number
- DEF512H
- Type
- Construction: BuildingConstruction
- Term
- Feb 6, 2026 → Jun 6, 20264 months
- Approved
- Mar 19, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $85,635 · 29% of the amount
Restore heat at Bronx Alcohol Treatment Center in Bronx CountyOffice of General Services - Design & ConstructionJan 12, 2026 – Oct 31, 2026$415,000
- Description
- Restore heat at Bronx Alcohol Treatment Center in Bronx County
- Contract number
- DEF491H
- Type
- Construction: BuildingConstruction
- Term
- Jan 12, 2026 → Oct 31, 202610 months
- Approved
- Jan 27, 2026
- Status
- Ended
- Amount
- $415,000
- Spent to date
- $334,311 · 81% of the amount
Repair water main break AC Powell State Office Building NYC New York CountyOffice of General Services - Design & ConstructionJan 2, 2026 – Jun 1, 2026$200,000
- Description
- Repair water main break AC Powell State Office Building NYC New York County
- Contract number
- DEF488G
- Type
- Construction: BuildingConstruction
- Term
- Jan 2, 2026 → Jun 1, 20265 months
- Approved
- Jan 27, 2026
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $182,037 · 91% of the amount
Restore Electrical Services at Planting Fields Arboretum in Nassau CountyOffice of General Services - Design & ConstructionDec 26, 2025 – Mar 12, 2026$300,000
- Description
- Restore Electrical Services at Planting Fields Arboretum in Nassau County
- Contract number
- DEF485H
- Type
- Construction: BuildingConstruction
- Term
- Dec 26, 2025 → Mar 12, 20262 months
- Approved
- Jan 13, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $39,401 · 13% of the amount
Repair water main break SUNY Purchase Westchester CountyOffice of General Services - Design & ConstructionNov 30, 2025 – Mar 30, 2026$300,000
- Description
- Repair water main break SUNY Purchase Westchester County
- Contract number
- DEF472G
- Type
- Construction: BuildingConstruction
- Term
- Nov 30, 2025 → Mar 30, 20264 months
- Approved
- Dec 31, 2025
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $247,897 · 83% of the amount
Repair steam line & restore heat Taconic DDSO Dutchess CountyOffice of General Services - Design & ConstructionNov 21, 2025 – Mar 21, 2026$150,000
- Description
- Repair steam line & restore heat Taconic DDSO Dutchess County
- Contract number
- DEF469H
- Type
- Construction: BuildingConstruction
- Term
- Nov 21, 2025 → Mar 21, 20264 months
- Approved
- Dec 31, 2025
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $24,929 · 17% of the amount
Repair water line leaks Creedmoor Addiction Treatment Center Queens CountyOffice of General Services - Design & ConstructionNov 17, 2025 – Mar 17, 2026$100,000
- Description
- Repair water line leaks Creedmoor Addiction Treatment Center Queens County
- Contract number
- DEF466P
- Type
- Construction: BuildingConstruction
- Term
- Nov 17, 2025 → Mar 17, 20264 months
- Approved
- Dec 4, 2025
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $22,625 · 23% of the amount
Contract-type mix
Share of contract value by type
- Construction262 contracts$74.4M
- Contract not subject to state pre-audit1 contract$600.0K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 1 contracts, $80.0K | 1 |
| 2008: 0 contracts, $0.0 | 0 |
| 2009: 2 contracts, $286.8K | 2 |
| 2010: 10 contracts, $1.4M | 10 |
| 2011: 8 contracts, $875.0K | 8 |
| 2012: 15 contracts, $1.7M | 15 |
| 2013: 14 contracts, $2.6M | 14 |
| 2014: 16 contracts, $3.6M | 16 |
| 2015: 17 contracts, $3.8M | 17 |
| 2016: 9 contracts, $2.3M | 9 |
| 2017: 9 contracts, $2.5M | 9 |
| 2018: 18 contracts, $4.9M | 18 |
| 2019: 12 contracts, $3.7M | 12 |
| 2020: 12 contracts, $3.1M | 12 |
| 2021: 21 contracts, $6.1M | 21 |
| 2022: 25 contracts, $9.9M | 25 |
| 2023: 18 contracts, $5.2M | 18 |
| 2024: 19 contracts, $7.8M | 19 |
| 2025: 24 contracts, $10.1M | 24 |
| 2026: 13 contracts, $5.2M | 13 |
How the Contractor Score adds up
Extensive (A, 94/100): 10 active contracts, $75M in contracts.
- Contract volume+16.8measured
$75M in current contract value across 263 contracts, more than 96% of scored contractors.
- Recent activity+19.7measured
10 active contracts today; the most recent was approved in November 2026.
- Agency breadth0.0measured
Contracts with one state agency or facility.
- Experience+2.2measured
First contract started in October 2007 (19 years of contract history).
- Contract-type mix+6.3measured
3 contract types; the largest group is construction (99% of value). Goods and services contracts are 99% of the total.
- Spending vs. value−1.0measured
On 253 completed contracts with spending recorded, spending is 57% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 94 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Twin Tier Constructors Inc
Scottsville, NYConstruction & Renovation
Since 20203 agencies
- Contract value
- $75.1M
- Contracts
- 18
- Active
- 8
- A
Dipasquale Construction Inc
Construction & Renovation
Since 20173 agencies
- Contract value
- $74.7M
- Contracts
- 5
- Active
- 2
- A
Mohegan Associates Inc
Construction & Renovation
Since 20084 agencies
- Contract value
- $74.1M
- Contracts
- 23
- Active
- 0
- A
Hudson Valley Electrical Construction & Maintenance Inc
Construction & Renovation
Since 20063 agencies
- Contract value
- $75.9M
- Contracts
- 69
- Active
- 0
- A
Michael A Ferrauilo Plumbing & Heating Inc
Construction & Renovation
Since 20067 agencies
- Contract value
- $76.1M
- Contracts
- 108
- Active
- 18
- A
All-Con Contracting Corp
Westbury, NYConstruction & Renovation
Since 20164 agencies
- Contract value
- $73.3M
- Contracts
- 16
- Active
- 2
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.