Michael A Ferrauilo Plumbing & Heating Inc holds 108 contracts worth $76.1M with 7 New York State agencies, most with Office of General Services - Design & Construction; 17 active today. The first started in 2006.
- Total contract value
- $76.1M
- Current contract amounts
- Spent to date
- $48.9M
- 64% of contract value
- Active contracts
- 17
- $15.2M in active value
- Contracts on record
- 108
- Since 2006
- Agencies served
- 7
- Most with Office of General Services - Design & Construction
- Years active
- 20
- First contract 2006
Contact & company
Business information and how to reach the company.
Leadership
Michael A. Ferrauilo
Co-Owner and President
Contracts
108 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Provide visitor and interpretive improvements Salmon River Fish Hatchery in Oswego County D46260PConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46260P | Nov 4, 2026to Dec 29, 2027 | Nov 4, 2026 | Dec 29, 2027 | $220,481$0 spent | $0 | |
Provide visitor and interpretive improvements Salmon River Fish Hatchery in Oswego County D46260HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46260H | Nov 4, 2026to Dec 29, 2027 | Nov 4, 2026 | Dec 29, 2027 | $90,971$0 spent | $0 | |
Replace Steam Lines in Buildings 30 31 and 32 at Albion Correctional Facility in Orleans County DM3217HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3217H | Oct 16, 2026to Jan 12, 2028 | Oct 16, 2026 | Jan 12, 2028 | $1,747,000$0 spent | $0 | |
PA filed contract OPWDD Finger Lakes DDSO Cobblestone Hostels VRF Systems Monroe County D00C527Contract not subject to state pre-auditActive | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D00C527 | Oct 14, 2026to Sep 15, 2027 | Oct 14, 2026 | Sep 15, 2027 | $1,307,300$0 spent | $0 | |
Upgrade electrical distribution generator and switchgear at Wende Correctional Facility Erie County D46049HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46049H | Aug 28, 2026to Nov 21, 2029 | Aug 28, 2026 | Nov 21, 2029 | $487,758$11,267 spent | $11,267 | |
Provide facility wide CCTV & audio monitoring system at Orleans Correctional Facility in Orleans Co D46245HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46245H | Jul 9, 2026to Sep 29, 2029 | Jul 9, 2026 | Sep 29, 2029 | $747,906$23,095 spent | $23,095 | |
Campground restrooms rehabilitation plumbing work at Letchworth State Park in Livingston County D006475Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006475 | Jul 6, 2026to Sep 4, 2027 | Jul 6, 2026 | Sep 4, 2027 | $1,578,000$304,343 spent | $304,343 | |
Campground restrooms rehabilitation mechanical work at Letchworth State Park in Livingston County D006474Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006474 | Jul 6, 2026to Sep 4, 2027 | Jul 6, 2026 | Sep 4, 2027 | $144,300$5,249 spent | $5,249 | |
Replace roofs in maintenance & depository buildings NYS School for the Blind in Genesee County D47779HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47779H | Jul 2, 2026to Dec 14, 2027 | Jul 2, 2026 | Dec 14, 2027 | $203,522$7,750 spent | $7,750 | |
Rehabilitate Dish Room Building 15 Attica Correctional Facility in Wyoming County DM3213HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3213H | Jun 16, 2026to May 31, 2027 | Jun 16, 2026 | May 31, 2027 | $293,000$10,668 spent | $10,668 | |
Replace roof Mess Hall Building 5 at Five Points Correctional Facility in Seneca County DQ2020HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ2020H | May 29, 2026to Feb 13, 2027 | May 29, 2026 | Feb 13, 2027 | $395,861$133,016 spent | $133,016 | |
Mitigate flood damage at Albion Correctional Facility in Orleans County DEF543HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF543H | Apr 1, 2026to Nov 27, 2026 | Apr 1, 2026 | Nov 27, 2026 | $300,000$61,951 spent | $61,951 | |
Provide temporary deaerator Finger Lakes DDSO Monroe County DEF509HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF509H | Feb 5, 2026to Jun 1, 2027 | Feb 5, 2026 | Jun 1, 2027 | $1,100,000$454,777 spent | $454,777 | |
Repair water line Industry Campus Monroe County DEF473GConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF473G | Dec 3, 2025to Dec 3, 2026 | Dec 3, 2025 | Dec 3, 2026 | $485,000$472,542 spent | $472,542 | |
Replace windows Buildings 33 34 & 36 Industry Limited Secure Center in Monroe County D47572HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47572H | Nov 20, 2025to May 14, 2027 | Nov 20, 2025 | May 14, 2027 | $155,700$58,218 spent | $58,218 | |
Provide bedroom & bathroom upgrades Buildings 72 73 &74 Industry Limited Secure Center Monroe County D45682HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45682H | Oct 7, 2025to May 29, 2029 | Oct 7, 2025 | May 29, 2029 | $5,772,124$427,542 spent | $427,542 | |
Replace roofs of various buildings at Limited Industry Secure Center in Monroe County D47461HConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47461H | Sep 5, 2025to Apr 7, 2027 | Sep 5, 2025 | Apr 7, 2027 | $144,738$110,179 spent | $110,179 | |
Repair sewer blockage at Attica Correctional Facility in Wyoming County DEF500GConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF500G | Jan 22, 2026to Nov 18, 2026 | Jan 22, 2026 | Nov 18, 2026 | $300,000$207,817 spent | $207,817 | |
Replace HVAC Controls in buildings 75 and 76 at Industry Limited Secure Center in Monroe County D47573HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47573H | Jun 18, 2025to Aug 15, 2026 | Jun 18, 2025 | Aug 15, 2026 | $1,641,108$1,547,200 spent | $1,547,200 | |
Repair failed chiller Industry Facility Monroe County DEF376HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF376H | May 20, 2025to Aug 1, 2026 | May 20, 2025 | Aug 1, 2026 | $450,000$437,496 spent | $437,496 |
Provide visitor and interpretive improvements Salmon River Fish Hatchery in Oswego CountyOffice of General Services - Design & ConstructionNov 4, 2026 – Dec 29, 2027Active$220,481
- Description
- Provide visitor and interpretive improvements Salmon River Fish Hatchery in Oswego County
- Contract number
- D46260P
- Type
- Construction: BuildingConstruction
- Term
- Nov 4, 2026 → Dec 29, 202714 months
- Approved
- Nov 4, 2026
- Status
- Active
- Amount
- $220,481
- Spent to date
- $0 · 0% of the amount
Provide visitor and interpretive improvements Salmon River Fish Hatchery in Oswego CountyOffice of General Services - Design & ConstructionNov 4, 2026 – Dec 29, 2027Active$90,971
- Description
- Provide visitor and interpretive improvements Salmon River Fish Hatchery in Oswego County
- Contract number
- D46260H
- Type
- Construction: BuildingConstruction
- Term
- Nov 4, 2026 → Dec 29, 202714 months
- Approved
- Nov 4, 2026
- Status
- Active
- Amount
- $90,971
- Spent to date
- $0 · 0% of the amount
Replace Steam Lines in Buildings 30 31 and 32 at Albion Correctional Facility in Orleans CountyOffice of General Services - Design & ConstructionOct 16, 2026 – Jan 12, 2028Active$1,747,000
- Description
- Replace Steam Lines in Buildings 30 31 and 32 at Albion Correctional Facility in Orleans County
- Contract number
- DM3217H
- Type
- Construction: BuildingConstruction
- Term
- Oct 16, 2026 → Jan 12, 202815 months
- Approved
- Oct 16, 2026
- Status
- Active
- Amount
- $1,747,000
- Spent to date
- $0 · 0% of the amount
PA filed contract OPWDD Finger Lakes DDSO Cobblestone Hostels VRF Systems Monroe CountyDormitory Authority of the State of New YorkOct 14, 2026 – Sep 15, 2027Active$1,307,300
- Description
- PA filed contract OPWDD Finger Lakes DDSO Cobblestone Hostels VRF Systems Monroe County
- Contract number
- D00C527
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 14, 2026 → Sep 15, 202711 months
- Approved
- Oct 16, 2026
- Status
- Active
- Amount
- $1,307,300
- Spent to date
- $0 · 0% of the amount
Upgrade electrical distribution generator and switchgear at Wende Correctional Facility Erie CountyOffice of General Services - Design & ConstructionAug 28, 2026 – Nov 21, 2029Active$487,758
- Description
- Upgrade electrical distribution generator and switchgear at Wende Correctional Facility Erie County
- Contract number
- D46049H
- Type
- Construction: BuildingConstruction
- Term
- Aug 28, 2026 → Nov 21, 20293.3 years
- Approved
- Aug 28, 2026
- Status
- Active
- Amount
- $487,758
- Spent to date
- $11,267 · 2% of the amount
Provide facility wide CCTV & audio monitoring system at Orleans Correctional Facility in Orleans CoOffice of General Services - Design & ConstructionJul 9, 2026 – Sep 29, 2029Active$747,906
- Description
- Provide facility wide CCTV & audio monitoring system at Orleans Correctional Facility in Orleans Co
- Contract number
- D46245H
- Type
- Construction: BuildingConstruction
- Term
- Jul 9, 2026 → Sep 29, 20293.3 years
- Approved
- Jul 9, 2026
- Status
- Active
- Amount
- $747,906
- Spent to date
- $23,095 · 3% of the amount
Campground restrooms rehabilitation plumbing work at Letchworth State Park in Livingston CountyOffice of Parks Recreation & Historic PreservationJul 6, 2026 – Sep 4, 2027Active$1,578,000
- Description
- Campground restrooms rehabilitation plumbing work at Letchworth State Park in Livingston County
- Contract number
- D006475
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2026 → Sep 4, 202714 months
- Approved
- Jul 6, 2026
- Status
- Active
- Amount
- $1,578,000
- Spent to date
- $304,343 · 19% of the amount
Campground restrooms rehabilitation mechanical work at Letchworth State Park in Livingston CountyOffice of Parks Recreation & Historic PreservationJul 6, 2026 – Sep 4, 2027Active$144,300
- Description
- Campground restrooms rehabilitation mechanical work at Letchworth State Park in Livingston County
- Contract number
- D006474
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2026 → Sep 4, 202714 months
- Approved
- Jul 6, 2026
- Status
- Active
- Amount
- $144,300
- Spent to date
- $5,249 · 4% of the amount
Replace roofs in maintenance & depository buildings NYS School for the Blind in Genesee CountyOffice of General Services - Design & ConstructionJul 2, 2026 – Dec 14, 2027Active$203,522
- Description
- Replace roofs in maintenance & depository buildings NYS School for the Blind in Genesee County
- Contract number
- D47779H
- Type
- Construction: BuildingConstruction
- Term
- Jul 2, 2026 → Dec 14, 202717 months
- Approved
- Jul 2, 2026
- Status
- Active
- Amount
- $203,522
- Spent to date
- $7,750 · 4% of the amount
Rehabilitate Dish Room Building 15 Attica Correctional Facility in Wyoming CountyOffice of General Services - Design & ConstructionJun 16, 2026 – May 31, 2027Active$293,000
- Description
- Rehabilitate Dish Room Building 15 Attica Correctional Facility in Wyoming County
- Contract number
- DM3213H
- Type
- Construction: BuildingConstruction
- Term
- Jun 16, 2026 → May 31, 202711 months
- Approved
- Jun 16, 2026
- Status
- Active
- Amount
- $293,000
- Spent to date
- $10,668 · 4% of the amount
Replace roof Mess Hall Building 5 at Five Points Correctional Facility in Seneca CountyOffice of General Services - Design & ConstructionMay 29, 2026 – Feb 13, 2027Active$395,861
- Description
- Replace roof Mess Hall Building 5 at Five Points Correctional Facility in Seneca County
- Contract number
- DQ2020H
- Type
- Construction: BuildingConstruction
- Term
- May 29, 2026 → Feb 13, 20279 months
- Approved
- May 29, 2026
- Status
- Active
- Amount
- $395,861
- Spent to date
- $133,016 · 34% of the amount
Mitigate flood damage at Albion Correctional Facility in Orleans CountyOffice of General Services - Design & ConstructionApr 1, 2026 – Nov 27, 2026Active$300,000
- Description
- Mitigate flood damage at Albion Correctional Facility in Orleans County
- Contract number
- DEF543H
- Type
- Construction: BuildingConstruction
- Term
- Apr 1, 2026 → Nov 27, 20268 months
- Approved
- May 21, 2026
- Status
- Active
- Amount
- $300,000
- Spent to date
- $61,951 · 21% of the amount
Provide temporary deaerator Finger Lakes DDSO Monroe CountyOffice of General Services - Design & ConstructionFeb 5, 2026 – Jun 1, 2027Active$1,100,000
- Description
- Provide temporary deaerator Finger Lakes DDSO Monroe County
- Contract number
- DEF509H
- Type
- Construction: BuildingConstruction
- Term
- Feb 5, 2026 → Jun 1, 202716 months
- Approved
- Feb 27, 2026
- Status
- Active
- Amount
- $1,100,000
- Spent to date
- $454,777 · 41% of the amount
Repair water line Industry Campus Monroe CountyOffice of General Services - Design & ConstructionDec 3, 2025 – Dec 3, 2026Active$485,000
- Description
- Repair water line Industry Campus Monroe County
- Contract number
- DEF473G
- Type
- Construction: BuildingConstruction
- Term
- Dec 3, 2025 → Dec 3, 202612 months
- Approved
- Dec 22, 2025
- Status
- Active
- Amount
- $485,000
- Spent to date
- $472,542 · 97% of the amount
Replace windows Buildings 33 34 & 36 Industry Limited Secure Center in Monroe CountyOffice of General Services - Design & ConstructionNov 20, 2025 – May 14, 2027Active$155,700
- Description
- Replace windows Buildings 33 34 & 36 Industry Limited Secure Center in Monroe County
- Contract number
- D47572H
- Type
- Construction: BuildingConstruction
- Term
- Nov 20, 2025 → May 14, 20271.5 years
- Approved
- Nov 20, 2025
- Status
- Active
- Amount
- $155,700
- Spent to date
- $58,218 · 37% of the amount
Provide bedroom & bathroom upgrades Buildings 72 73 &74 Industry Limited Secure Center Monroe CountyOffice of General Services - Design & ConstructionOct 7, 2025 – May 29, 2029Active$5,772,124
- Description
- Provide bedroom & bathroom upgrades Buildings 72 73 &74 Industry Limited Secure Center Monroe County
- Contract number
- D45682H
- Type
- Construction: BuildingConstruction
- Term
- Oct 7, 2025 → May 29, 20293.7 years
- Approved
- Oct 7, 2025
- Status
- Active
- Amount
- $5,772,124
- Spent to date
- $427,542 · 7% of the amount
Replace roofs of various buildings at Limited Industry Secure Center in Monroe CountyOffice of General Services - Design & ConstructionSep 5, 2025 – Apr 7, 2027Active$144,738
- Description
- Replace roofs of various buildings at Limited Industry Secure Center in Monroe County
- Contract number
- D47461H
- Type
- Construction: BuildingConstruction
- Term
- Sep 5, 2025 → Apr 7, 20271.6 years
- Approved
- Sep 5, 2025
- Status
- Active
- Amount
- $144,738
- Spent to date
- $110,179 · 76% of the amount
Repair sewer blockage at Attica Correctional Facility in Wyoming CountyOffice of General Services - Design & ConstructionJan 22, 2026 – Nov 18, 2026$300,000
- Description
- Repair sewer blockage at Attica Correctional Facility in Wyoming County
- Contract number
- DEF500G
- Type
- Construction: BuildingConstruction
- Term
- Jan 22, 2026 → Nov 18, 202610 months
- Approved
- Feb 9, 2026
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $207,817 · 69% of the amount
Replace HVAC Controls in buildings 75 and 76 at Industry Limited Secure Center in Monroe CountyOffice of General Services - Design & ConstructionJun 18, 2025 – Aug 15, 2026$1,641,108
- Description
- Replace HVAC Controls in buildings 75 and 76 at Industry Limited Secure Center in Monroe County
- Contract number
- D47573H
- Type
- Construction: BuildingConstruction
- Term
- Jun 18, 2025 → Aug 15, 202614 months
- Approved
- Jun 18, 2025
- Status
- Ended
- Amount
- $1,641,108
- Spent to date
- $1,547,200 · 94% of the amount
Repair failed chiller Industry Facility Monroe CountyOffice of General Services - Design & ConstructionMay 20, 2025 – Aug 1, 2026$450,000
- Description
- Repair failed chiller Industry Facility Monroe County
- Contract number
- DEF376H
- Type
- Construction: BuildingConstruction
- Term
- May 20, 2025 → Aug 1, 202614 months
- Approved
- Jun 12, 2025
- Status
- Ended
- Amount
- $450,000
- Spent to date
- $437,496 · 97% of the amount
Contract-type mix
Share of contract value by type
- Construction101 contracts$72.3M
- Contract not subject to state pre-audit6 contracts$3.7M
- Service: Other / misc. services1 contract$74.5K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2007: 0 contracts, $0.0 | 0 |
| 2008: 2 contracts, $1.2M | 2 |
| 2009: 5 contracts, $2.4M | 5 |
| 2010: 7 contracts, $1.9M | 7 |
| 2011: 5 contracts, $4.4M | 5 |
| 2012: 3 contracts, $800.0K | 3 |
| 2013: 3 contracts, $900.0K | 3 |
| 2014: 6 contracts, $2.3M | 6 |
| 2015: 6 contracts, $6.2M | 6 |
| 2016: 4 contracts, $2.2M | 4 |
| 2017: 4 contracts, $886.5K | 4 |
| 2018: 4 contracts, $1.2M | 4 |
| 2019: 2 contracts, $214.5K | 2 |
| 2020: 8 contracts, $2.7M | 8 |
| 2021: 7 contracts, $20.6M | 7 |
| 2022: 9 contracts, $2.6M | 9 |
| 2023: 9 contracts, $6.1M | 9 |
| 2024: 3 contracts, $1.7M | 3 |
| 2025: 6 contracts, $8.6M | 6 |
| 2026: 14 contracts, $8.9M | 14 |
How the Contractor Score adds up
Extensive (A, 100/100): 17 active contracts, $76M in contracts.
- Contract volume+16.8measured
$76M in current contract value across 108 contracts, more than 96% of scored contractors.
- Recent activity+20.5measured
17 active contracts today; the most recent was approved in November 2026.
- Agency breadth+10.9measured
Contracts with 7 different state agencies and facilities.
- Experience+2.6measured
First contract started in April 2006 (20 years of contract history).
- Contract-type mix+6.7measured
4 contract types; the largest group is construction (95% of value). Goods and services contracts are 95% of the total.
- Spending vs. value−0.4measured
On 90 completed contracts with spending recorded, spending is 79% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 107.1, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction98 contracts$70.5M
- Dormitory Authority of the State of New York2 contracts$2.7M
- Office of Parks Recreation & Historic Preservation3 contracts$1.8M
- College at Geneseo1 contract$515.4K
- SUNY at Buffalo1 contract$234.5K
- State University Construction Fund2 contracts$232.0K
- Wende Correctional Facility1 contract$74.5K
Similar contractors
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
Lechase Construction Services LLC
Rochester, NYConstruction & Renovation
Since 200522 agencies
- Contract value
- $698.8M
- Contracts
- 142
- Active
- 24
- A
Kircher Construction Inc
Construction & Renovation
Since 20089 agencies
- Contract value
- $67.7M
- Contracts
- 68
- Active
- 1
- A
Matco Electric Corporation
Vestal, NYConstruction & Renovation
Since 200942 agencies
- Contract value
- $85.8M
- Contracts
- 118
- Active
- 16
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
S & L Roofing & Sheetmetal Inc
Construction & Renovation
Since 20107 agencies
- Contract value
- $50.3M
- Contracts
- 39
- Active
- 1
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Dormitory Authority of the State of New York contractors
- Office of Parks Recreation & Historic Preservation contractors
- College at Geneseo contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.