Stilsing Electric Inc
ARensselaer, NY State contracts since 2008Updated Nov 13, 2026
Stilsing Electric Inc holds 133 contracts worth $68.4M with 7 New York State agencies, most with Office of General Services - Design & Construction; 23 active today. The first started in 2008.
- Total contract value
- $68.4M
- Current contract amounts
- Spent to date
- $42.1M
- 62% of contract value
- Active contracts
- 23
- $15.8M in active value
- Contracts on record
- 133
- Since 2008
- Agencies served
- 7
- Most with Office of General Services - Design & Construction
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- Stilsing Electric, IncorporatedDoing business as Stilsing Electric Inc
- Identifiers
- UEI MBDKKR2FL1M5 · CAGE 1WMU7
- Federal registration
- Expired · expired Nov 2026
- In business since
- 1952
Industry codes (NAICS)
- 238210Electrical Contractors and Other Wiring Installation Contractors
- 237130Power and Communication Line and Related Structures Construction
- 238910Site Preparation Contractors
Certifications
- Women-owned
- Women-owned small business (WOSB)
- Women business enterprise (WBE)
Shown for reference. Certifications are not part of the Contractor Score; confirm current status with the certifying agency.
Leadership
Asher Enciso
Ceo
Amanda Tompkins
Contract Admin
Contracts
133 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Replace condensing units Buildings 1,8,26 & 93 Eastern Correctional Facility in Ulster County DM3210EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3210E | Aug 21, 2026to Apr 30, 2028 | Aug 21, 2026 | Apr 30, 2028 | $598,784$0 spent | $0 | |
Rehabilitate wastewater treatment plant at Otisville Correctional Facility in Orange County D46069EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46069E | Jun 26, 2026to Apr 12, 2028 | Jun 26, 2026 | Apr 12, 2028 | $564,507$0 spent | $0 | |
Signal Requirements various locations in Region 8 D265764Construction: HighwayActive | Department of Transportation | Construction: HighwayConstruction | D265764 | Jun 12, 2026to Feb 11, 2028 | Jun 12, 2026 | Feb 11, 2028 | $1,170,200$0 spent | $0 | |
Install fleet EV charging system at the New Paltz Regional Office in Ulster County D47626EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47626E | Jun 11, 2026to Nov 13, 2027 | Jun 11, 2026 | Nov 13, 2027 | $642,200$0 spent | $0 | |
Renovate Room 344 Assembly Lounge at NYS Capitol Building in Albany County DQ2038EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ2038E | May 26, 2026to Mar 11, 2027 | May 26, 2026 | Mar 11, 2027 | $164,145$21,924 spent | $21,924 | |
Remove fire suppression systems at various ITS facilities in Albany County DQ1882EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1882E | Feb 18, 2026to Jun 9, 2027 | Feb 18, 2026 | Jun 9, 2027 | $340,496$8,137 spent | $8,137 | |
Electric site improvements Lincoln Bathhouse Saratoga Spa State Park Saratoga County D006502Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006502 | Feb 13, 2026to Aug 17, 2027 | Feb 13, 2026 | Aug 17, 2027 | $1,381,200$555,186 spent | $555,186 | |
Renovate loading dock & building entrance at the Eleanor Roosevelt SOB in Dutchess County D47479EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47479E | Feb 5, 2026to Dec 18, 2027 | Feb 5, 2026 | Dec 18, 2027 | $118,416$0 spent | $0 | |
Replace tray washer Building 144 Cook Chill Production Center Rockland County D47006EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47006E | Jan 5, 2026to Jan 28, 2027 | Jan 5, 2026 | Jan 28, 2027 | $149,761$0 spent | $0 | |
Renovate floors 5 and 12 in Agency Building 4 at the Empire State Plaza in Albany County DQ1820EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1820E | Dec 5, 2025to Jan 29, 2027 | Dec 5, 2025 | Jan 29, 2027 | $656,668$19,415 spent | $19,415 | |
Replace AC units Building 18 State office Building Campus Albany Albany County D47218EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47218E | Oct 21, 2025to Feb 24, 2027 | Oct 21, 2025 | Feb 24, 2027 | $72,466$67,046 spent | $67,046 | |
Provide salt storage building at Hollow Rd and Taconic Parkway Clinton Corners in Dutchess County D47544EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47544E | Oct 17, 2025to Jan 16, 2027 | Oct 17, 2025 | Jan 16, 2027 | $132,740$33,585 spent | $33,585 | |
Rehabilitate escalators at the Cultural Education Center Empire State Plaza in Albany County D47028EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47028E | Oct 2, 2025to Mar 6, 2029 | Oct 2, 2025 | Mar 6, 2029 | $837,809$200,156 spent | $200,156 | |
Rehabilitate elevators East Parking Garage Albany County D47524EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47524E | Sep 9, 2025to Jan 6, 2028 | Sep 9, 2025 | Jan 6, 2028 | $163,309$35,908 spent | $35,908 | |
Traffic signals requirements various locations Region 1 various counties D265498Construction: Standby contractsActive | Department of Transportation | Construction: Standby contractsConstruction | D265498 | Aug 12, 2025to Nov 30, 2027 | Aug 12, 2025 | Nov 30, 2027 | $3,843,222$300,577 spent | $300,577 | |
Rebuild existing SHU walls and replace windows and plumbing fixtures Woodbourne CF Sullivan County D46111EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46111E | Jun 12, 2025to Jul 6, 2028 | Jun 12, 2025 | Jul 6, 2028 | $152,176$3,625 spent | $3,625 | |
Rehabilitate stairs and entryway at Cornerstone Empire State Plaza in Albany County D47386EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47386E | Jun 10, 2025to Dec 29, 2026 | Jun 10, 2025 | Dec 29, 2026 | $146,901$9,642 spent | $9,642 | |
Modernize elevators Building 8 State Office Building Campus Albany County D47421EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47421E | Mar 20, 2025to Mar 17, 2028 | Mar 20, 2025 | Mar 17, 2028 | $1,184,679$762,814 spent | $762,814 | |
Electrical pool rehabilitation Bear Mountain State Park Rockland County D006276Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006276 | Feb 11, 2025to Feb 11, 2027 | Feb 11, 2025 | Feb 11, 2027 | $282,653$128,214 spent | $128,214 | |
Provide tunnel ventilation & waterproofing Building 22 State Office Building Campus Albany county D47228EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47228E | Jan 22, 2025to Feb 11, 2027 | Jan 22, 2025 | Feb 11, 2027 | $162,616$55,849 spent | $55,849 |
Replace condensing units Buildings 1,8,26 & 93 Eastern Correctional Facility in Ulster CountyOffice of General Services - Design & ConstructionAug 21, 2026 – Apr 30, 2028Active$598,784
- Description
- Replace condensing units Buildings 1,8,26 & 93 Eastern Correctional Facility in Ulster County
- Contract number
- DM3210E
- Type
- Construction: BuildingConstruction
- Term
- Aug 21, 2026 → Apr 30, 20281.7 years
- Approved
- Aug 21, 2026
- Status
- Active
- Amount
- $598,784
- Spent to date
- $0 · 0% of the amount
Rehabilitate wastewater treatment plant at Otisville Correctional Facility in Orange CountyOffice of General Services - Design & ConstructionJun 26, 2026 – Apr 12, 2028Active$564,507
- Description
- Rehabilitate wastewater treatment plant at Otisville Correctional Facility in Orange County
- Contract number
- D46069E
- Type
- Construction: BuildingConstruction
- Term
- Jun 26, 2026 → Apr 12, 20281.8 years
- Approved
- Jun 26, 2026
- Status
- Active
- Amount
- $564,507
- Spent to date
- $0 · 0% of the amount
Signal Requirements various locations in Region 8Department of TransportationJun 12, 2026 – Feb 11, 2028Active$1,170,200
- Description
- Signal Requirements various locations in Region 8
- Contract number
- D265764
- Type
- Construction: HighwayConstruction
- Term
- Jun 12, 2026 → Feb 11, 20281.7 years
- Approved
- Jun 12, 2026
- Status
- Active
- Amount
- $1,170,200
- Spent to date
- $0 · 0% of the amount
Install fleet EV charging system at the New Paltz Regional Office in Ulster CountyOffice of General Services - Design & ConstructionJun 11, 2026 – Nov 13, 2027Active$642,200
- Description
- Install fleet EV charging system at the New Paltz Regional Office in Ulster County
- Contract number
- D47626E
- Type
- Construction: BuildingConstruction
- Term
- Jun 11, 2026 → Nov 13, 202717 months
- Approved
- Jun 11, 2026
- Status
- Active
- Amount
- $642,200
- Spent to date
- $0 · 0% of the amount
Renovate Room 344 Assembly Lounge at NYS Capitol Building in Albany CountyOffice of General Services - Design & ConstructionMay 26, 2026 – Mar 11, 2027Active$164,145
- Description
- Renovate Room 344 Assembly Lounge at NYS Capitol Building in Albany County
- Contract number
- DQ2038E
- Type
- Construction: BuildingConstruction
- Term
- May 26, 2026 → Mar 11, 20279 months
- Approved
- May 26, 2026
- Status
- Active
- Amount
- $164,145
- Spent to date
- $21,924 · 13% of the amount
Remove fire suppression systems at various ITS facilities in Albany CountyOffice of General Services - Design & ConstructionFeb 18, 2026 – Jun 9, 2027Active$340,496
- Description
- Remove fire suppression systems at various ITS facilities in Albany County
- Contract number
- DQ1882E
- Type
- Construction: BuildingConstruction
- Term
- Feb 18, 2026 → Jun 9, 202716 months
- Approved
- Feb 18, 2026
- Status
- Active
- Amount
- $340,496
- Spent to date
- $8,137 · 2% of the amount
Electric site improvements Lincoln Bathhouse Saratoga Spa State Park Saratoga CountyOffice of Parks Recreation & Historic PreservationFeb 13, 2026 – Aug 17, 2027Active$1,381,200
- Description
- Electric site improvements Lincoln Bathhouse Saratoga Spa State Park Saratoga County
- Contract number
- D006502
- Type
- Construction: BuildingConstruction
- Term
- Feb 13, 2026 → Aug 17, 20271.5 years
- Approved
- Feb 13, 2026
- Status
- Active
- Amount
- $1,381,200
- Spent to date
- $555,186 · 40% of the amount
Renovate loading dock & building entrance at the Eleanor Roosevelt SOB in Dutchess CountyOffice of General Services - Design & ConstructionFeb 5, 2026 – Dec 18, 2027Active$118,416
- Description
- Renovate loading dock & building entrance at the Eleanor Roosevelt SOB in Dutchess County
- Contract number
- D47479E
- Type
- Construction: BuildingConstruction
- Term
- Feb 5, 2026 → Dec 18, 20271.8 years
- Approved
- Feb 5, 2026
- Status
- Active
- Amount
- $118,416
- Spent to date
- $0 · 0% of the amount
Replace tray washer Building 144 Cook Chill Production Center Rockland CountyOffice of General Services - Design & ConstructionJan 5, 2026 – Jan 28, 2027Active$149,761
- Description
- Replace tray washer Building 144 Cook Chill Production Center Rockland County
- Contract number
- D47006E
- Type
- Construction: BuildingConstruction
- Term
- Jan 5, 2026 → Jan 28, 202713 months
- Approved
- Jan 5, 2026
- Status
- Active
- Amount
- $149,761
- Spent to date
- $0 · 0% of the amount
Renovate floors 5 and 12 in Agency Building 4 at the Empire State Plaza in Albany CountyOffice of General Services - Design & ConstructionDec 5, 2025 – Jan 29, 2027Active$656,668
- Description
- Renovate floors 5 and 12 in Agency Building 4 at the Empire State Plaza in Albany County
- Contract number
- DQ1820E
- Type
- Construction: BuildingConstruction
- Term
- Dec 5, 2025 → Jan 29, 202714 months
- Approved
- Dec 5, 2025
- Status
- Active
- Amount
- $656,668
- Spent to date
- $19,415 · 3% of the amount
Replace AC units Building 18 State office Building Campus Albany Albany CountyOffice of General Services - Design & ConstructionOct 21, 2025 – Feb 24, 2027Active$72,466
- Description
- Replace AC units Building 18 State office Building Campus Albany Albany County
- Contract number
- D47218E
- Type
- Construction: BuildingConstruction
- Term
- Oct 21, 2025 → Feb 24, 202716 months
- Approved
- Oct 21, 2025
- Status
- Active
- Amount
- $72,466
- Spent to date
- $67,046 · 93% of the amount
Provide salt storage building at Hollow Rd and Taconic Parkway Clinton Corners in Dutchess CountyOffice of General Services - Design & ConstructionOct 17, 2025 – Jan 16, 2027Active$132,740
- Description
- Provide salt storage building at Hollow Rd and Taconic Parkway Clinton Corners in Dutchess County
- Contract number
- D47544E
- Type
- Construction: BuildingConstruction
- Term
- Oct 17, 2025 → Jan 16, 202715 months
- Approved
- Oct 17, 2025
- Status
- Active
- Amount
- $132,740
- Spent to date
- $33,585 · 25% of the amount
Rehabilitate escalators at the Cultural Education Center Empire State Plaza in Albany CountyOffice of General Services - Design & ConstructionOct 2, 2025 – Mar 6, 2029Active$837,809
- Description
- Rehabilitate escalators at the Cultural Education Center Empire State Plaza in Albany County
- Contract number
- D47028E
- Type
- Construction: BuildingConstruction
- Term
- Oct 2, 2025 → Mar 6, 20293.4 years
- Approved
- Oct 2, 2025
- Status
- Active
- Amount
- $837,809
- Spent to date
- $200,156 · 24% of the amount
Rehabilitate elevators East Parking Garage Albany CountyOffice of General Services - Design & ConstructionSep 9, 2025 – Jan 6, 2028Active$163,309
- Description
- Rehabilitate elevators East Parking Garage Albany County
- Contract number
- D47524E
- Type
- Construction: BuildingConstruction
- Term
- Sep 9, 2025 → Jan 6, 20282.3 years
- Approved
- Sep 9, 2025
- Status
- Active
- Amount
- $163,309
- Spent to date
- $35,908 · 22% of the amount
Traffic signals requirements various locations Region 1 various countiesDepartment of TransportationAug 12, 2025 – Nov 30, 2027Active$3,843,222
- Description
- Traffic signals requirements various locations Region 1 various counties
- Contract number
- D265498
- Type
- Construction: Standby contractsConstruction
- Term
- Aug 12, 2025 → Nov 30, 20272.3 years
- Approved
- Aug 12, 2025
- Status
- Active
- Amount
- $3,843,222
- Spent to date
- $300,577 · 8% of the amount
Rebuild existing SHU walls and replace windows and plumbing fixtures Woodbourne CF Sullivan CountyOffice of General Services - Design & ConstructionJun 12, 2025 – Jul 6, 2028Active$152,176
- Description
- Rebuild existing SHU walls and replace windows and plumbing fixtures Woodbourne CF Sullivan County
- Contract number
- D46111E
- Type
- Construction: BuildingConstruction
- Term
- Jun 12, 2025 → Jul 6, 20283.1 years
- Approved
- Jun 12, 2025
- Status
- Active
- Amount
- $152,176
- Spent to date
- $3,625 · 2% of the amount
Rehabilitate stairs and entryway at Cornerstone Empire State Plaza in Albany CountyOffice of General Services - Design & ConstructionJun 10, 2025 – Dec 29, 2026Active$146,901
- Description
- Rehabilitate stairs and entryway at Cornerstone Empire State Plaza in Albany County
- Contract number
- D47386E
- Type
- Construction: BuildingConstruction
- Term
- Jun 10, 2025 → Dec 29, 20261.6 years
- Approved
- Jun 10, 2025
- Status
- Active
- Amount
- $146,901
- Spent to date
- $9,642 · 7% of the amount
Modernize elevators Building 8 State Office Building Campus Albany CountyOffice of General Services - Design & ConstructionMar 20, 2025 – Mar 17, 2028Active$1,184,679
- Description
- Modernize elevators Building 8 State Office Building Campus Albany County
- Contract number
- D47421E
- Type
- Construction: BuildingConstruction
- Term
- Mar 20, 2025 → Mar 17, 20283 years
- Approved
- Mar 20, 2025
- Status
- Active
- Amount
- $1,184,679
- Spent to date
- $762,814 · 64% of the amount
Electrical pool rehabilitation Bear Mountain State Park Rockland CountyOffice of Parks Recreation & Historic PreservationFeb 11, 2025 – Feb 11, 2027Active$282,653
- Description
- Electrical pool rehabilitation Bear Mountain State Park Rockland County
- Contract number
- D006276
- Type
- Construction: BuildingConstruction
- Term
- Feb 11, 2025 → Feb 11, 20272 years
- Approved
- Feb 11, 2025
- Status
- Active
- Amount
- $282,653
- Spent to date
- $128,214 · 45% of the amount
Provide tunnel ventilation & waterproofing Building 22 State Office Building Campus Albany countyOffice of General Services - Design & ConstructionJan 22, 2025 – Feb 11, 2027Active$162,616
- Description
- Provide tunnel ventilation & waterproofing Building 22 State Office Building Campus Albany county
- Contract number
- D47228E
- Type
- Construction: BuildingConstruction
- Term
- Jan 22, 2025 → Feb 11, 20272.1 years
- Approved
- Jan 22, 2025
- Status
- Active
- Amount
- $162,616
- Spent to date
- $55,849 · 34% of the amount
Contract-type mix
Share of contract value by type
- Construction126 contracts$67.6M
- Contract not subject to state pre-audit7 contracts$842.1K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 1 contracts, $2.7M | 1 |
| 2009: 0 contracts, $0.0 | 0 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 9 contracts, $2.1M | 9 |
| 2012: 3 contracts, $4.5M | 3 |
| 2013: 6 contracts, $1.8M | 6 |
| 2014: 2 contracts, $318.1K | 2 |
| 2015: 8 contracts, $1.6M | 8 |
| 2016: 9 contracts, $2.8M | 9 |
| 2017: 9 contracts, $4.3M | 9 |
| 2018: 4 contracts, $737.6K | 4 |
| 2019: 10 contracts, $4.9M | 10 |
| 2020: 12 contracts, $6.2M | 12 |
| 2021: 7 contracts, $5.4M | 7 |
| 2022: 7 contracts, $2.8M | 7 |
| 2023: 8 contracts, $5.7M | 8 |
| 2024: 12 contracts, $5.4M | 12 |
| 2025: 17 contracts, $12.1M | 17 |
| 2026: 9 contracts, $5.1M | 9 |
How the Contractor Score adds up
Extensive (A, 100/100): 23 active contracts, $68M in contracts.
- Contract volume+16.5measured
$68M in current contract value across 133 contracts, more than 96% of scored contractors.
- Recent activity+21.0measured
23 active contracts today; the most recent was approved in August 2026.
- Agency breadth+10.9measured
Contracts with 7 different state agencies and facilities.
- Experience+2.0measured
First contract started in September 2008 (18 years of contract history).
- Contract-type mix+7.5measured
5 contract types; the largest group is construction (99% of value). Goods and services contracts are 99% of the total.
- Spending vs. value−0.3measured
On 104 completed contracts with spending recorded, spending is 81% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0measured
Was registered to do business with the federal government; the registration has expired. Adds no points.
50 + contributions = 107.6, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction100 contracts$45.6M
- Department of Transportation16 contracts$18.7M
- Office of Parks Recreation & Historic Preservation10 contracts$3.2M
- College at New Paltz1 contract$362.4K
- College of Agriculture and Technology at Cobleskill2 contracts$234.5K
- College at Oneonta2 contracts$186.0K
- Department of Environmental Conservation2 contracts$181.8K
Similar contractors
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
Upstate Companies I LLC
Mount Upton, NYConstruction & Renovation
Since 201610 agencies
- Contract value
- $156.7M
- Contracts
- 104
- Active
- 22
- B
General Roofing Contractors LLC
Construction & Renovation
Since 20158 agencies
- Contract value
- $17.2M
- Contracts
- 21
- Active
- 0
- A
Murnane Building Contractors
Plattsburgh, NYConstruction & Renovation
Since 200515 agencies
- Contract value
- $519.9M
- Contracts
- 120
- Active
- 9
- A
Fahs Construction Group Inc
Binghamton, NYConstruction & Renovation
Since 200713 agencies
- Contract value
- $994.3M
- Contracts
- 100
- Active
- 12
- A
VMJR Companies LLC
Glens Falls, NYConstruction & Renovation
Since 20098 agencies
- Contract value
- $60.0M
- Contracts
- 30
- Active
- 5
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Department of Transportation contractors
- Office of Parks Recreation & Historic Preservation contractors
- College at New Paltz contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.