J&B Installations Inc
AState contracts since 2009Updated Nov 13, 2026
J&B Installations Inc holds 25 contracts worth $13.2M with 9 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2009.
- Total contract value
- $13.2M
- Current contract amounts
- Spent to date
- $11.3M
- 86% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 25
- Since 2009
- Agencies served
- 9
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Contracts
25 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
PA Filed Roof Replacement at Harmon and Gordon Halls including Asbestos Abatement D233768Contract not subject to state pre-audit | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D233768 | Apr 7, 2026to Jul 31, 2026 | Apr 7, 2026 | Jul 31, 2026 | $1,740,700$0 spent | $0 | |
Replace roof in Building 2 at the Oriskany Facility in Oneida County D47211CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47211C | Aug 7, 2025to Aug 20, 2026 | Aug 7, 2025 | Aug 20, 2026 | $823,931$799,863 spent | $799,863 | |
Roof one replacement at community campus in Onondaga County D550378Construction: Building | SUNY - Upstate Medical University | Construction: BuildingConstruction | D550378 | Oct 21, 2024to Aug 31, 2026 | Oct 21, 2024 | Aug 31, 2026 | $228,450$228,450 spent | $228,450 | |
Repair powerhouse roof Five Points Correctional Facility Romulus Seneca County DEF231TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEF231T | Aug 16, 2024to Sep 28, 2025 | Aug 16, 2024 | Sep 28, 2025 | $773,902$769,841 spent | $769,841 | |
Replacement of computer warehouse building roof in Onondaga County D550362Construction: Building | SUNY - Upstate Medical University | Construction: BuildingConstruction | D550362 | Mar 3, 2024to May 12, 2026 | Mar 3, 2024 | May 12, 2026 | $2,241,819$2,241,819 spent | $2,241,819 | |
South wing elevator roof replacement at Upstate Hospital D550358Construction: Building | SUNY - Upstate Medical University | Construction: BuildingConstruction | D550358 | Sep 6, 2023to Apr 5, 2025 | Sep 6, 2023 | Apr 5, 2025 | $237,175$237,175 spent | $237,175 | |
Project 1364 wha bridge roof r T550340Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550340 | Sep 6, 2023to Aug 9, 2025 | Sep 6, 2023 | Aug 9, 2025 | $94,240$94,240 spent | $94,240 | |
Fraser Hall and Lauderdale Health Center roof replacement at SUNY Geneseo D006761Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006761 | Aug 3, 2022to Oct 3, 2024 | Aug 3, 2022 | Oct 3, 2024 | $1,247,688$1,247,688 spent | $1,247,688 | |
Construction agreement proj #1 T550279Contract not subject to state pre-audit | SUNY - Upstate Medical University | Contract not subject to state pre-auditNot pre-audited | T550279 | Nov 19, 2019to Apr 9, 2021 | Nov 19, 2019 | Apr 9, 2021 | $356,762$356,762 spent | $356,762 | |
Doty tower roof replacement, p T000190Contract not subject to state pre-audit | College at Geneseo | Contract not subject to state pre-auditNot pre-audited | T000190 | Sep 23, 2019to Aug 30, 2020 | Sep 23, 2019 | Aug 30, 2020 | $113,550$113,550 spent | $113,550 | |
161023 Plant breeding love lab T018068Contract not subject to state pre-audit | New York State Statutory College - Cornell University | Contract not subject to state pre-auditNot pre-audited | T018068 | Oct 1, 2018to Oct 31, 2020 | Oct 1, 2018 | Oct 31, 2020 | $163,895$163,895 spent | $163,895 | |
Occt bus garage roof replaceme T300407Contract not subject to state pre-audit | SUNY at Binghamton | Contract not subject to state pre-auditNot pre-audited | T300407 | Aug 21, 2017to Oct 30, 2017 | Aug 21, 2017 | Oct 30, 2017 | $163,560$163,560 spent | $163,560 | |
Replace roof covering on Admin and garage, State Armory, Olean DQ1608CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1608C | Aug 22, 2016to Jun 19, 2018 | Aug 22, 2016 | Jun 19, 2018 | $285,353$282,321 spent | $282,321 | |
Replace roof- college union PR T000148Contract not subject to state pre-audit | College at Geneseo | Contract not subject to state pre-auditNot pre-audited | T000148 | May 1, 2016to Dec 1, 2016 | May 1, 2016 | Dec 1, 2016 | $798,872$798,872 spent | $798,872 | |
Bus garage roof repair / repla T000064Contract not subject to state pre-audit | College of Technology at Alfred | Contract not subject to state pre-auditNot pre-audited | T000064 | Oct 29, 2014to Oct 30, 2014 | Oct 29, 2014 | Oct 30, 2014 | $81,825$81,825 spent | $81,825 | |
Pn16335 multiple building roof T014283Contract not subject to state pre-audit | New York State Statutory College - Cornell University | Contract not subject to state pre-auditNot pre-audited | T014283 | Sep 1, 2014to Dec 31, 2015 | Sep 1, 2014 | Dec 31, 2015 | $1,073,184$1,073,184 spent | $1,073,184 | |
Event center roof T300238Contract not subject to state pre-audit | SUNY at Binghamton | Contract not subject to state pre-auditNot pre-audited | T300238 | Jun 23, 2014to Sep 21, 2014 | Jun 23, 2014 | Sep 21, 2014 | $431,724$431,724 spent | $431,724 | |
New epdm roof system wiles room gate 1 building NYS fairgrounds syracuse onondaga county D44821CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44821C | Feb 28, 2014to Oct 29, 2014 | Feb 28, 2014 | Oct 29, 2014 | $138,650$128,032 spent | $128,032 | |
Repair leaking roofs various buildings NYS fairgrounds onondaga county DEC573TConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC573T | Feb 26, 2014to Aug 25, 2014 | Feb 26, 2014 | Aug 25, 2014 | $150,000$107,130 spent | $107,130 | |
Term contract - roofing T201344Contract not subject to state pre-audit | College of Environmental Science & Forestry | Contract not subject to state pre-auditNot pre-audited | T201344 | Dec 1, 2013to Dec 1, 2015 | Dec 1, 2013 | Dec 1, 2015 | $3,964$3,964 spent | $3,964 |
PA Filed Roof Replacement at Harmon and Gordon Halls including Asbestos AbatementDormitory Authority of the State of New YorkApr 7, 2026 – Jul 31, 2026$1,740,700
- Description
- PA Filed Roof Replacement at Harmon and Gordon Halls including Asbestos Abatement
- Contract number
- D233768
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Apr 7, 2026 → Jul 31, 20264 months
- Approved
- Apr 9, 2026
- Status
- Ended
- Amount
- $1,740,700
- Spent to date
- $0 · 0% of the amount
Replace roof in Building 2 at the Oriskany Facility in Oneida CountyOffice of General Services - Design & ConstructionAug 7, 2025 – Aug 20, 2026$823,931
- Description
- Replace roof in Building 2 at the Oriskany Facility in Oneida County
- Contract number
- D47211C
- Type
- Construction: BuildingConstruction
- Term
- Aug 7, 2025 → Aug 20, 202612 months
- Approved
- Aug 7, 2025
- Status
- Ended
- Amount
- $823,931
- Spent to date
- $799,863 · 97% of the amount
Roof one replacement at community campus in Onondaga CountySUNY - Upstate Medical UniversityOct 21, 2024 – Aug 31, 2026$228,450
- Description
- Roof one replacement at community campus in Onondaga County
- Contract number
- D550378
- Type
- Construction: BuildingConstruction
- Term
- Oct 21, 2024 → Aug 31, 20261.8 years
- Approved
- Oct 18, 2024
- Status
- Ended
- Amount
- $228,450
- Spent to date
- $228,450 · 100% of the amount
Repair powerhouse roof Five Points Correctional Facility Romulus Seneca CountyOffice of General Services - Design & ConstructionAug 16, 2024 – Sep 28, 2025$773,902
- Description
- Repair powerhouse roof Five Points Correctional Facility Romulus Seneca County
- Contract number
- DEF231T
- Type
- Construction: BuildingConstruction
- Term
- Aug 16, 2024 → Sep 28, 202513 months
- Approved
- Oct 18, 2024
- Status
- Ended
- Amount
- $773,902
- Spent to date
- $769,841 · 99% of the amount
Replacement of computer warehouse building roof in Onondaga CountySUNY - Upstate Medical UniversityMar 3, 2024 – May 12, 2026$2,241,819
- Description
- Replacement of computer warehouse building roof in Onondaga County
- Contract number
- D550362
- Type
- Construction: BuildingConstruction
- Term
- Mar 3, 2024 → May 12, 20262.2 years
- Approved
- Feb 22, 2024
- Status
- Ended
- Amount
- $2,241,819
- Spent to date
- $2,241,819 · 100% of the amount
South wing elevator roof replacement at Upstate HospitalSUNY - Upstate Medical UniversitySep 6, 2023 – Apr 5, 2025$237,175
- Description
- South wing elevator roof replacement at Upstate Hospital
- Contract number
- D550358
- Type
- Construction: BuildingConstruction
- Term
- Sep 6, 2023 → Apr 5, 20251.6 years
- Approved
- Aug 10, 2023
- Status
- Ended
- Amount
- $237,175
- Spent to date
- $237,175 · 100% of the amount
Project 1364 wha bridge roof rSUNY - Upstate Medical UniversitySep 6, 2023 – Aug 9, 2025$94,240
- Description
- Project 1364 wha bridge roof r
- Contract number
- T550340
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 6, 2023 → Aug 9, 20251.9 years
- Approved
- Aug 16, 2023
- Status
- Ended
- Amount
- $94,240
- Spent to date
- $94,240 · 100% of the amount
Fraser Hall and Lauderdale Health Center roof replacement at SUNY GeneseoState University Construction FundAug 3, 2022 – Oct 3, 2024$1,247,688
- Description
- Fraser Hall and Lauderdale Health Center roof replacement at SUNY Geneseo
- Contract number
- D006761
- Type
- Construction: BuildingConstruction
- Term
- Aug 3, 2022 → Oct 3, 20242.2 years
- Approved
- Jul 21, 2022
- Status
- Ended
- Amount
- $1,247,688
- Spent to date
- $1,247,688 · 100% of the amount
Construction agreement proj #1SUNY - Upstate Medical UniversityNov 19, 2019 – Apr 9, 2021$356,762
- Description
- Construction agreement proj #1
- Contract number
- T550279
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 19, 2019 → Apr 9, 202117 months
- Approved
- Nov 21, 2019
- Status
- Ended
- Amount
- $356,762
- Spent to date
- $356,762 · 100% of the amount
Doty tower roof replacement, pCollege at GeneseoSep 23, 2019 – Aug 30, 2020$113,550
- Description
- Doty tower roof replacement, p
- Contract number
- T000190
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Geneseo
- Term
- Sep 23, 2019 → Aug 30, 202011 months
- Approved
- Sep 28, 2019
- Status
- Ended
- Amount
- $113,550
- Spent to date
- $113,550 · 100% of the amount
161023 Plant breeding love labNew York State Statutory College - Cornell UniversityOct 1, 2018 – Oct 31, 2020$163,895
- Description
- 161023 Plant breeding love lab
- Contract number
- T018068
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 1, 2018 → Oct 31, 20202.1 years
- Approved
- Sep 20, 2018
- Status
- Ended
- Amount
- $163,895
- Spent to date
- $163,895 · 100% of the amount
Occt bus garage roof replacemeSUNY at BinghamtonAug 21, 2017 – Oct 30, 2017$163,560
- Description
- Occt bus garage roof replaceme
- Contract number
- T300407
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Binghamton
- Term
- Aug 21, 2017 → Oct 30, 20172 months
- Approved
- Aug 10, 2017
- Status
- Ended
- Amount
- $163,560
- Spent to date
- $163,560 · 100% of the amount
Replace roof covering on Admin and garage, State Armory, OleanOffice of General Services - Design & ConstructionAug 22, 2016 – Jun 19, 2018$285,353
- Description
- Replace roof covering on Admin and garage, State Armory, Olean
- Contract number
- DQ1608C
- Type
- Construction: BuildingConstruction
- Term
- Aug 22, 2016 → Jun 19, 20181.8 years
- Approved
- Aug 22, 2016
- Status
- Ended
- Amount
- $285,353
- Spent to date
- $282,321 · 99% of the amount
Replace roof- college union PRCollege at GeneseoMay 1, 2016 – Dec 1, 2016$798,872
- Description
- Replace roof- college union PR
- Contract number
- T000148
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Geneseo
- Term
- May 1, 2016 → Dec 1, 20167 months
- Approved
- Apr 14, 2016
- Status
- Ended
- Amount
- $798,872
- Spent to date
- $798,872 · 100% of the amount
Bus garage roof repair / replaCollege of Technology at AlfredOct 29, 2014 – Oct 30, 2014$81,825
- Description
- Bus garage roof repair / repla
- Contract number
- T000064
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Oct 29, 2014 → Oct 30, 2014
- Approved
- Nov 1, 2014
- Status
- Ended
- Amount
- $81,825
- Spent to date
- $81,825 · 100% of the amount
Pn16335 multiple building roofNew York State Statutory College - Cornell UniversitySep 1, 2014 – Dec 31, 2015$1,073,184
- Description
- Pn16335 multiple building roof
- Contract number
- T014283
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 1, 2014 → Dec 31, 201516 months
- Approved
- Aug 26, 2014
- Status
- Ended
- Amount
- $1,073,184
- Spent to date
- $1,073,184 · 100% of the amount
Event center roofSUNY at BinghamtonJun 23, 2014 – Sep 21, 2014$431,724
- Description
- Event center roof
- Contract number
- T300238
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Binghamton
- Term
- Jun 23, 2014 → Sep 21, 20143 months
- Approved
- Jul 2, 2014
- Status
- Ended
- Amount
- $431,724
- Spent to date
- $431,724 · 100% of the amount
New epdm roof system wiles room gate 1 building NYS fairgrounds syracuse onondaga countyOffice of General Services - Design & ConstructionFeb 28, 2014 – Oct 29, 2014$138,650
- Description
- New epdm roof system wiles room gate 1 building NYS fairgrounds syracuse onondaga county
- Contract number
- D44821C
- Type
- Construction: BuildingConstruction
- Term
- Feb 28, 2014 → Oct 29, 20148 months
- Approved
- Feb 28, 2014
- Status
- Ended
- Amount
- $138,650
- Spent to date
- $128,032 · 92% of the amount
Repair leaking roofs various buildings NYS fairgrounds onondaga countyOffice of General Services - Design & ConstructionFeb 26, 2014 – Aug 25, 2014$150,000
- Description
- Repair leaking roofs various buildings NYS fairgrounds onondaga county
- Contract number
- DEC573T
- Type
- Construction: BuildingConstruction
- Term
- Feb 26, 2014 → Aug 25, 20146 months
- Approved
- Mar 28, 2014
- Status
- Ended
- Amount
- $150,000
- Spent to date
- $107,130 · 71% of the amount
Term contract - roofingCollege of Environmental Science & ForestryDec 1, 2013 – Dec 1, 2015$3,964
- Description
- Term contract - roofing
- Contract number
- T201344
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Dec 1, 2013 → Dec 1, 20152 years
- Approved
- Dec 17, 2014
- Status
- Ended
- Amount
- $3,964
- Spent to date
- $3,964 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building14 contracts$8.2M
- Contract not subject to state pre-audit11 contracts$5.0M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 1 contracts, $661.4K | 1 |
| 2010: 3 contracts, $1.0M | 3 |
| 2011: 0 contracts, $0.0 | 0 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 2 contracts, $368.9K | 2 |
| 2014: 5 contracts, $1.9M | 5 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 2 contracts, $1.1M | 2 |
| 2017: 1 contracts, $163.6K | 1 |
| 2018: 1 contracts, $163.9K | 1 |
| 2019: 2 contracts, $470.3K | 2 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 1 contracts, $1.2M | 1 |
| 2023: 2 contracts, $331.4K | 2 |
| 2024: 3 contracts, $3.2M | 3 |
| 2025: 1 contracts, $823.9K | 1 |
| 2026: 1 contracts, $1.7M | 1 |
How the Contractor Score adds up
Extensive (A, 83/100): works with 9 agencies, $13M in contracts.
- Contract volume+11.2measured
$13M in current contract value across 25 contracts, more than 87% of scored contractors.
- Recent activity+5.0measured
No active contracts today; the most recent was approved in April 2026.
- Agency breadth+12.1measured
Contracts with 9 different state agencies and facilities.
- Experience+1.6measured
First contract started in December 2009 (16 years of contract history).
- Contract-type mix+3.2measured
2 contract types; the largest group is construction (62% of value). Goods and services contracts are 62% of the total.
- Spending vs. value+0.1measured
On 24 completed contracts with spending recorded, spending is 99% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 83 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction10 contracts$4.2M
- SUNY - Upstate Medical University5 contracts$3.2M
- Dormitory Authority of the State of New York1 contract$1.7M
- State University Construction Fund1 contract$1.2M
- New York State Statutory College - Cornell University2 contracts$1.2M
- College at Geneseo2 contracts$912.4K
- SUNY at Binghamton2 contracts$595.3K
- College of Technology at Alfred1 contract$81.8K
- College of Environmental Science & Forestry1 contract$4.0K
Similar contractors
- A
Lechase Construction Services LLC
Rochester, NYConstruction & Renovation
Since 200522 agencies
- Contract value
- $698.8M
- Contracts
- 142
- Active
- 25
- A
Elmer W Davis Inc
Construction & Renovation
Since 20079 agencies
- Contract value
- $33.2M
- Contracts
- 31
- Active
- 2
- A
Wilkins Mechanical Inc
Construction & Renovation
Since 200810 agencies
- Contract value
- $67.9M
- Contracts
- 125
- Active
- 0
- A
Matco Electric Corporation
Vestal, NYConstruction & Renovation
Since 200942 agencies
- Contract value
- $85.8M
- Contracts
- 118
- Active
- 16
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- SUNY - Upstate Medical University contractors
- Dormitory Authority of the State of New York contractors
- State University Construction Fund contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.