Jersen Construction Group LLC
AWaterford, NY State contracts since 2011Updated Nov 13, 2026
Jersen Construction Group LLC holds 20 contracts worth $121.1M with 3 New York State agencies, most with Office of General Services - Design & Construction; 2 active today. The first started in 2011.
- Total contract value
- $121.1M
- Current contract amounts
- Spent to date
- $112.3M
- 93% of contract value
- Active contracts
- 2
- $3.8M in active value
- Contracts on record
- 20
- Since 2011
- Agencies served
- 3
- Most with Office of General Services - Design & Construction
- Years active
- 15
- First contract 2011
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- Jersen Construction Group LLCDoing business as Jersen Industries
- Identifiers
- UEI XF1LH9M4DXA1 · CAGE 8F5E8
- Federal registration
- Active · renews by Jun 2027
- In business since
- 1983
Industry codes (NAICS)
- 236220Commercial and Institutional Building Construction
- 236210Industrial Building Construction
- 238110Poured Concrete Foundation and Structure Contractors
- 238910Site Preparation Contractors
Leadership
Christopher D. Lepkowski
Vice President
David J. Jersen
Member
Galen P. Pereau
Executive Vice President
John R. Jersen
Board Chairman
Rob Cowin
Vice President
Kali Demarco
Controller
Kenneth J Jersen
Mr.
Robert Cowin
Project Manager
Andrew J. Swedick
Earthwork Manager
Contracts
20 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Water treatment rehabilitation at the water treatment plant Schodack Island State Park Rensselaer Co D006633Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006633 | Oct 29, 2026to Jul 6, 2027 | Oct 29, 2026 | Jul 6, 2027 | $51,910$0 spent | $0 | |
GC Rehabilitate Peerless Pool slide & kiddie pool at Saratoga Spa State Park in Saratoga County D006335Construction: BuildingActive | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006335 | Jan 24, 2025to Nov 27, 2026 | Jan 24, 2025 | Nov 27, 2026 | $3,795,467$3,575,158 spent | $3,575,158 | |
PC Rehabilitate Peerless Pool slide & kiddie pool at Saratoga Spa State Park in Saratoga County D006337Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006337 | Jan 24, 2025to Jul 10, 2026 | Jan 24, 2025 | Jul 10, 2026 | $83,717$71,725 spent | $71,725 | |
Rehabilitate wastewater treatment plant Eastern CF Ulster County D45857CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45857C | May 28, 2021to Mar 9, 2026 | May 28, 2021 | Mar 9, 2026 | $15,541,091$15,523,087 spent | $15,523,087 | |
Provide Cell Block & Quartermaster Records Storage Addition Coxsackie CF Greene County D46628CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46628C | Oct 31, 2019to Feb 20, 2026 | Oct 31, 2019 | Feb 20, 2026 | $27,482,824$26,118,394 spent | $26,118,394 | |
Rehabilitate Tunnel & Connection Points NYS Capitol to AE Smith Building Albany County D44981CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44981C | Oct 4, 2019to Jan 30, 2021 | Oct 4, 2019 | Jan 30, 2021 | $3,747,900$199,927 spent | $199,927 | |
Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida County DED922CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED922C | Sep 24, 2018to Sep 24, 2019 | Sep 24, 2018 | Sep 24, 2019 | $600,000$429,256 spent | $429,256 | |
Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida County DED921CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED921C | Sep 24, 2018to Sep 24, 2019 | Sep 24, 2018 | Sep 24, 2019 | $600,000$413,031 spent | $413,031 | |
Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida County DED923CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED923C | Sep 24, 2018to Sep 24, 2019 | Sep 24, 2018 | Sep 24, 2019 | $300,000$0 spent | $0 | |
SUCF 01A87 Construct ETEC Bui T006328Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006328 | May 23, 2017to Feb 27, 2019 | May 23, 2017 | Feb 27, 2019 | $3,969,110$3,969,110 spent | $3,969,110 | |
Provide Masonry Bearing Wall Repairs Flight 3 NYS Capitol Albany County DED379CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED379C | Dec 14, 2016to Apr 13, 2017 | Dec 14, 2016 | Apr 13, 2017 | $200,000$117,286 spent | $117,286 | |
Provide Swift Water&Flood Training Facility-State Preparedness Training Center Oriskany OneidaCounty D45305CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45305C | Dec 1, 2016to Jun 1, 2019 | Dec 1, 2016 | Jun 1, 2019 | $8,749,630$8,743,947 spent | $8,743,947 | |
Provide Maintenance Subheadquarters DOT Region 8, Dutchess County D44823CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44823C | Sep 14, 2016to Jun 28, 2018 | Sep 14, 2016 | Jun 28, 2018 | $3,584,622$3,575,239 spent | $3,575,239 | |
Repair Fire, Water, Smoke Damage, Capital District DDSO, Clifton Park, Saratoga Co. DED206CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DED206C | May 3, 2016to Aug 31, 2016 | May 3, 2016 | Aug 31, 2016 | $300,000$259,326 spent | $259,326 | |
Investigate and repair sinkhole, Bldg1, Capital District PC DEC967GConstruction: Highway | Office of General Services - Design & Construction | Construction: HighwayConstruction | DEC967G | Jul 7, 2015to Nov 4, 2015 | Jul 7, 2015 | Nov 4, 2015 | $75,000$5,954 spent | $5,954 | |
Change order 30 for contract t T005969Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005969 | Jun 15, 2012to Sep 15, 2016 | Jun 15, 2012 | Sep 15, 2016 | $25,200,976$25,200,976 spent | $25,200,976 | |
Change order 41 for contract t T005934Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005934 | Mar 22, 2012to Oct 3, 2014 | Mar 22, 2012 | Oct 3, 2014 | $18,311,953$15,687,782 spent | $15,687,782 | |
Ses field operations buildings oneida county D44190CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44190C | Feb 13, 2012to Jun 12, 2014 | Feb 13, 2012 | Jun 12, 2014 | $2,419,627$2,419,001 spent | $2,419,001 | |
Construct emergency generator BLDG 982 great meadow CF D43387CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D43387C | May 11, 2011to Aug 18, 2013 | May 11, 2011 | Aug 18, 2013 | $1,949,528$1,949,471 spent | $1,949,471 | |
S7CF 25288 delhi child care center SUNY delhi T005810Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005810 | Mar 29, 2011to Jul 1, 2013 | Mar 29, 2011 | Jul 1, 2013 | $4,086,672$4,086,672 spent | $4,086,672 |
Water treatment rehabilitation at the water treatment plant Schodack Island State Park Rensselaer CoOffice of Parks Recreation & Historic PreservationOct 29, 2026 – Jul 6, 2027Active$51,910
- Description
- Water treatment rehabilitation at the water treatment plant Schodack Island State Park Rensselaer Co
- Contract number
- D006633
- Type
- Construction: BuildingConstruction
- Term
- Oct 29, 2026 → Jul 6, 20278 months
- Approved
- Oct 29, 2026
- Status
- Active
- Amount
- $51,910
- Spent to date
- $0 · 0% of the amount
GC Rehabilitate Peerless Pool slide & kiddie pool at Saratoga Spa State Park in Saratoga CountyOffice of Parks Recreation & Historic PreservationJan 24, 2025 – Nov 27, 2026Active$3,795,467
- Description
- GC Rehabilitate Peerless Pool slide & kiddie pool at Saratoga Spa State Park in Saratoga County
- Contract number
- D006335
- Type
- Construction: BuildingConstruction
- Term
- Jan 24, 2025 → Nov 27, 20261.8 years
- Approved
- Jan 24, 2025
- Status
- Active
- Amount
- $3,795,467
- Spent to date
- $3,575,158 · 94% of the amount
PC Rehabilitate Peerless Pool slide & kiddie pool at Saratoga Spa State Park in Saratoga CountyOffice of Parks Recreation & Historic PreservationJan 24, 2025 – Jul 10, 2026$83,717
- Description
- PC Rehabilitate Peerless Pool slide & kiddie pool at Saratoga Spa State Park in Saratoga County
- Contract number
- D006337
- Type
- Construction: BuildingConstruction
- Term
- Jan 24, 2025 → Jul 10, 202617 months
- Approved
- Jan 24, 2025
- Status
- Ended
- Amount
- $83,717
- Spent to date
- $71,725 · 86% of the amount
Rehabilitate wastewater treatment plant Eastern CF Ulster CountyOffice of General Services - Design & ConstructionMay 28, 2021 – Mar 9, 2026$15,541,091
- Description
- Rehabilitate wastewater treatment plant Eastern CF Ulster County
- Contract number
- D45857C
- Type
- Construction: BuildingConstruction
- Term
- May 28, 2021 → Mar 9, 20264.8 years
- Approved
- May 28, 2021
- Status
- Ended
- Amount
- $15,541,091
- Spent to date
- $15,523,087 · 100% of the amount
Provide Cell Block & Quartermaster Records Storage Addition Coxsackie CF Greene CountyOffice of General Services - Design & ConstructionOct 31, 2019 – Feb 20, 2026$27,482,824
- Description
- Provide Cell Block & Quartermaster Records Storage Addition Coxsackie CF Greene County
- Contract number
- D46628C
- Type
- Construction: BuildingConstruction
- Term
- Oct 31, 2019 → Feb 20, 20266.3 years
- Approved
- Oct 31, 2019
- Status
- Ended
- Amount
- $27,482,824
- Spent to date
- $26,118,394 · 95% of the amount
Rehabilitate Tunnel & Connection Points NYS Capitol to AE Smith Building Albany CountyOffice of General Services - Design & ConstructionOct 4, 2019 – Jan 30, 2021$3,747,900
- Description
- Rehabilitate Tunnel & Connection Points NYS Capitol to AE Smith Building Albany County
- Contract number
- D44981C
- Type
- Construction: BuildingConstruction
- Term
- Oct 4, 2019 → Jan 30, 202116 months
- Approved
- Oct 4, 2019
- Status
- Ended
- Amount
- $3,747,900
- Spent to date
- $199,927 · 5% of the amount
Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida CountyOffice of General Services - Design & ConstructionSep 24, 2018 – Sep 24, 2019$600,000
- Description
- Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida County
- Contract number
- DED922C
- Type
- Construction: BuildingConstruction
- Term
- Sep 24, 2018 → Sep 24, 201912 months
- Approved
- Oct 23, 2018
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $429,256 · 72% of the amount
Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida CountyOffice of General Services - Design & ConstructionSep 24, 2018 – Sep 24, 2019$600,000
- Description
- Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida County
- Contract number
- DED921C
- Type
- Construction: BuildingConstruction
- Term
- Sep 24, 2018 → Sep 24, 201912 months
- Approved
- Oct 23, 2018
- Status
- Ended
- Amount
- $600,000
- Spent to date
- $413,031 · 69% of the amount
Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida CountyOffice of General Services - Design & ConstructionSep 24, 2018 – Sep 24, 2019$300,000
- Description
- Rebuild Porches Bldgs 1 & 2 & 4 Mid State CF Oneida County
- Contract number
- DED923C
- Type
- Construction: BuildingConstruction
- Term
- Sep 24, 2018 → Sep 24, 201912 months
- Approved
- Oct 23, 2018
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $0 · 0% of the amount
SUCF 01A87 Construct ETEC BuiState University Construction FundMay 23, 2017 – Feb 27, 2019$3,969,110
- Description
- SUCF 01A87 Construct ETEC Bui
- Contract number
- T006328
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 23, 2017 → Feb 27, 20191.8 years
- Approved
- May 24, 2017
- Status
- Ended
- Amount
- $3,969,110
- Spent to date
- $3,969,110 · 100% of the amount
Provide Masonry Bearing Wall Repairs Flight 3 NYS Capitol Albany CountyOffice of General Services - Design & ConstructionDec 14, 2016 – Apr 13, 2017$200,000
- Description
- Provide Masonry Bearing Wall Repairs Flight 3 NYS Capitol Albany County
- Contract number
- DED379C
- Type
- Construction: BuildingConstruction
- Term
- Dec 14, 2016 → Apr 13, 20174 months
- Approved
- Jan 9, 2017
- Status
- Ended
- Amount
- $200,000
- Spent to date
- $117,286 · 59% of the amount
Provide Swift Water&Flood Training Facility-State Preparedness Training Center Oriskany OneidaCountyOffice of General Services - Design & ConstructionDec 1, 2016 – Jun 1, 2019$8,749,630
- Description
- Provide Swift Water&Flood Training Facility-State Preparedness Training Center Oriskany OneidaCounty
- Contract number
- D45305C
- Type
- Construction: BuildingConstruction
- Term
- Dec 1, 2016 → Jun 1, 20192.5 years
- Approved
- Dec 1, 2016
- Status
- Ended
- Amount
- $8,749,630
- Spent to date
- $8,743,947 · 100% of the amount
Provide Maintenance Subheadquarters DOT Region 8, Dutchess CountyOffice of General Services - Design & ConstructionSep 14, 2016 – Jun 28, 2018$3,584,622
- Description
- Provide Maintenance Subheadquarters DOT Region 8, Dutchess County
- Contract number
- D44823C
- Type
- Construction: BuildingConstruction
- Term
- Sep 14, 2016 → Jun 28, 20181.8 years
- Approved
- Sep 14, 2016
- Status
- Ended
- Amount
- $3,584,622
- Spent to date
- $3,575,239 · 100% of the amount
Repair Fire, Water, Smoke Damage, Capital District DDSO, Clifton Park, Saratoga Co.Office of General Services - Design & ConstructionMay 3, 2016 – Aug 31, 2016$300,000
- Description
- Repair Fire, Water, Smoke Damage, Capital District DDSO, Clifton Park, Saratoga Co.
- Contract number
- DED206C
- Type
- Construction: BuildingConstruction
- Term
- May 3, 2016 → Aug 31, 20164 months
- Approved
- Jun 10, 2016
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $259,326 · 86% of the amount
Investigate and repair sinkhole, Bldg1, Capital District PCOffice of General Services - Design & ConstructionJul 7, 2015 – Nov 4, 2015$75,000
- Description
- Investigate and repair sinkhole, Bldg1, Capital District PC
- Contract number
- DEC967G
- Type
- Construction: HighwayConstruction
- Term
- Jul 7, 2015 → Nov 4, 20154 months
- Approved
- Jul 30, 2015
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $5,954 · 8% of the amount
Change order 30 for contract tState University Construction FundJun 15, 2012 – Sep 15, 2016$25,200,976
- Description
- Change order 30 for contract t
- Contract number
- T005969
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Jun 15, 2012 → Sep 15, 20164.3 years
- Approved
- Jun 22, 2012
- Status
- Ended
- Amount
- $25,200,976
- Spent to date
- $25,200,976 · 100% of the amount
Change order 41 for contract tState University Construction FundMar 22, 2012 – Oct 3, 2014$18,311,953
- Description
- Change order 41 for contract t
- Contract number
- T005934
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 22, 2012 → Oct 3, 20142.5 years
- Approved
- Jun 5, 2012
- Status
- Ended
- Amount
- $18,311,953
- Spent to date
- $15,687,782 · 86% of the amount
Ses field operations buildings oneida countyOffice of General Services - Design & ConstructionFeb 13, 2012 – Jun 12, 2014$2,419,627
- Description
- Ses field operations buildings oneida county
- Contract number
- D44190C
- Type
- Construction: BuildingConstruction
- Term
- Feb 13, 2012 → Jun 12, 20142.3 years
- Approved
- Feb 13, 2012
- Status
- Ended
- Amount
- $2,419,627
- Spent to date
- $2,419,001 · 100% of the amount
Construct emergency generator BLDG 982 great meadow CFOffice of General Services - Design & ConstructionMay 11, 2011 – Aug 18, 2013$1,949,528
- Description
- Construct emergency generator BLDG 982 great meadow CF
- Contract number
- D43387C
- Type
- Construction: BuildingConstruction
- Term
- May 11, 2011 → Aug 18, 20132.3 years
- Approved
- May 11, 2011
- Status
- Ended
- Amount
- $1,949,528
- Spent to date
- $1,949,471 · 100% of the amount
S7CF 25288 delhi child care center SUNY delhiState University Construction FundMar 29, 2011 – Jul 1, 2013$4,086,672
- Description
- S7CF 25288 delhi child care center SUNY delhi
- Contract number
- T005810
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 29, 2011 → Jul 1, 20132.3 years
- Approved
- May 4, 2011
- Status
- Ended
- Amount
- $4,086,672
- Spent to date
- $4,086,672 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction16 contracts$69.5M
- Contract not subject to state pre-audit4 contracts$51.6M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2011: 2 contracts, $6.0M | 2 |
| 2012: 3 contracts, $45.9M | 3 |
| 2013: 0 contracts, $0.0 | 0 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 1 contracts, $75.0K | 1 |
| 2016: 4 contracts, $12.8M | 4 |
| 2017: 1 contracts, $4.0M | 1 |
| 2018: 3 contracts, $1.5M | 3 |
| 2019: 2 contracts, $31.2M | 2 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 1 contracts, $15.5M | 1 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 2 contracts, $3.9M | 2 |
| 2026: 1 contracts, $51.9K | 1 |
How the Contractor Score adds up
Extensive (A, 100/100): $121M in contracts, 2 active contracts.
- Contract volume+18.3measured
$121M in current contract value across 20 contracts, more than 97% of scored contractors.
- Recent activity+15.0measured
2 active contracts today; the most recent was approved in October 2026.
- Agency breadth+6.8measured
Contracts with 3 different state agencies and facilities.
- Experience+1.2measured
First contract started in March 2011 (15 years of contract history).
- Contract-type mix+4.2measured
3 contract types; the largest group is construction (57% of value). Goods and services contracts are 57% of the total.
- Spending vs. value0.0measured
On 17 completed contracts with spending recorded, spending is 93% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 100.7, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
MLB Construction Services LLC
Malta, NYConstruction & Renovation
Since 20116 agencies
- Contract value
- $111.8M
- Contracts
- 17
- Active
- 5
- A
New Britain Roofing Co Inc
Construction & Renovation
Since 20069 agencies
- Contract value
- $106.6M
- Contracts
- 71
- Active
- 10
- A
Titan Roofing Inc
Construction & Renovation
Since 200816 agencies
- Contract value
- $137.7M
- Contracts
- 128
- Active
- 7
- A
James H Maloy Inc
Loudonville, NYConstruction & Renovation
Since 20068 agencies
- Contract value
- $105.6M
- Contracts
- 35
- Active
- 2
- A
Aow Associates Inc
Construction & Renovation
Since 20096 agencies
- Contract value
- $99.1M
- Contracts
- 37
- Active
- 0
- A
Bunkoff General Contractors Inc
Construction & Renovation
Since 20076 agencies
- Contract value
- $149.5M
- Contracts
- 46
- Active
- 4
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- Office of Parks Recreation & Historic Preservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.