Manning Squires Hennig Co Inc
ABatavia, NY State contracts since 2011Updated Nov 13, 2026
Manning Squires Hennig Co Inc holds 19 contracts worth $309.7M with 5 New York State agencies, most with State University Construction Fund; 3 active today. The first started in 2011.
- Total contract value
- $309.7M
- Current contract amounts
- Spent to date
- $302.5M
- 98% of contract value
- Active contracts
- 3
- $105.5M in active value
- Contracts on record
- 19
- Since 2011
- Agencies served
- 5
- Most with State University Construction Fund
- Years active
- 15
- First contract 2011
Contact & company
Business information and how to reach the company.
Phone
Address
- Legal name
- Manning-Squires-Hennig Co., Inc.
- Identifiers
- UEI XVENWJ2L51S6 · CAGE 1CAL2
- Federal registration
- Active · renews by Mar 2027
- In business since
- 1962
Industry codes (NAICS)
- 236220Commercial and Institutional Building Construction
Leadership
Matt Squires
CEO
Samantha Nickerson
Cfo
Brian Kelly
Coo
Paul Dommer
Vice President, Interiors Division
Contracts
19 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Classroom building renovations at Buffalo State D006854Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006854 | Aug 30, 2023to Apr 30, 2027 | Aug 30, 2023 | Apr 30, 2027 | $44,633,838$42,072,138 spent | $42,072,138 | |
Renovation of Foster Hall at SUNY Buffalo D006740Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006740 | Jun 7, 2022to Apr 1, 2027 | Jun 7, 2022 | Apr 1, 2027 | $42,821,077$42,741,399 spent | $42,741,399 | |
Renovation of Classroom Building at Buffalo State College D006724Construction: BuildingActive | State University Construction Fund | Construction: BuildingConstruction | D006724 | Apr 1, 2022to Apr 1, 2027 | Apr 1, 2022 | Apr 1, 2027 | $18,055,092$17,178,204 spent | $17,178,204 | |
Renovate Milne Library at SUNY Geneseo D006756Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006756 | Jul 26, 2022to Dec 31, 2025 | Jul 26, 2022 | Dec 31, 2025 | $27,640,601$27,464,134 spent | $27,464,134 | |
Renovate Crosby Hall for SUNY Buffalo in Erie County D006661Construction: Building | State University Construction Fund | Construction: BuildingConstruction | D006661 | Sep 3, 2021to Aug 6, 2024 | Sep 3, 2021 | Aug 6, 2024 | $22,143,901$22,143,901 spent | $22,143,901 | |
Project 2017-216 heart of the T500135Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T500135 | Jan 8, 2020to Apr 25, 2024 | Jan 8, 2020 | Apr 25, 2024 | $27,735,591$27,735,591 spent | $27,735,591 | |
SUCF061014 Reconstruct Mechan T006522Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006522 | Sep 30, 2019to Dec 7, 2022 | Sep 30, 2019 | Dec 7, 2022 | $3,143,677$3,143,677 spent | $3,143,677 | |
SUCF03X387 Renovate Science B T006420Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006420 | Apr 30, 2018to Sep 2, 2021 | Apr 30, 2018 | Sep 2, 2021 | $23,771,803$23,771,803 spent | $23,771,803 | |
Academic success center T161671Contract not subject to state pre-audit | College at Brockport | Contract not subject to state pre-auditNot pre-audited | T161671 | Jan 23, 2017to Jan 31, 2020 | Jan 23, 2017 | Jan 31, 2020 | $9,111,979$9,111,978 spent | $9,111,978 | |
PA Filed Contract-SUNY@Buffalo Ellicott Complex Spauld.Quad Laund.Rm Renov.Ph.3 Asbest&Haz.Mat.Abate D191559Contract not subject to state pre-audit | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D191559 | Mar 3, 2016to Aug 5, 2016 | Mar 3, 2016 | Aug 5, 2016 | $1,645,000$0 spent | $0 | |
PA Filed Contract-SUNY@Buffalo Lehman&Clinton Laund.Renov.Ph.2 incl.Asbestos&Haz.Materials Abatement D191561Contract not subject to state pre-audit | Dormitory Authority of the State of New York | Contract not subject to state pre-auditNot pre-audited | D191561 | Mar 3, 2016to Aug 5, 2016 | Mar 3, 2016 | Aug 5, 2016 | $1,488,000$0 spent | $0 | |
SUCF 30B27 Restore Crofts Hal T006200Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006200 | Feb 4, 2016to Sep 1, 2017 | Feb 4, 2016 | Sep 1, 2017 | $800,994$800,994 spent | $800,994 | |
Project 2015-026 heart of the T500060Contract not subject to state pre-audit | SUNY at Buffalo | Contract not subject to state pre-auditNot pre-audited | T500060 | Sep 21, 2015to Jan 29, 2018 | Sep 21, 2015 | Jan 29, 2018 | $5,352,283$5,352,283 spent | $5,352,283 | |
Change order 20 for contract t T006035Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T006035 | Nov 18, 2013to Jul 24, 2016 | Nov 18, 2013 | Jul 24, 2016 | $11,636,026$11,636,026 spent | $11,636,026 | |
Sucf 22224 student leadership center phase 2, suc of tech at alfred T005881Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005881 | Nov 16, 2011to Aug 8, 2014 | Nov 16, 2011 | Aug 8, 2014 | $17,547,966$17,547,966 spent | $17,547,966 | |
Sucf 03383 new technology building suc at buffalo T005825Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005825 | May 25, 2011to Oct 31, 2014 | May 25, 2011 | Oct 31, 2014 | $25,106,070$25,106,070 spent | $25,106,070 | |
Ej brown room 119 classroom upgrade and rehabiltation T000033Contract not subject to state pre-audit | College of Technology at Alfred | Contract not subject to state pre-auditNot pre-audited | T000033 | May 13, 2011to Sep 28, 2012 | May 13, 2011 | Sep 28, 2012 | $672,900$672,900 spent | $672,900 | |
Sucf 05325 williams center rehab SUNY college at fredonia T005808Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005808 | Mar 23, 2011to Aug 7, 2013 | Mar 23, 2011 | Aug 7, 2013 | $10,843,259$10,843,259 spent | $10,843,259 | |
Sucf 22197 rehab allied health BLDG SUNY alfred T005772Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005772 | Feb 17, 2011to Apr 30, 2015 | Feb 17, 2011 | Apr 30, 2015 | $15,533,965$15,171,062 spent | $15,171,062 |
Classroom building renovations at Buffalo StateState University Construction FundAug 30, 2023 – Apr 30, 2027Active$44,633,838
- Description
- Classroom building renovations at Buffalo State
- Contract number
- D006854
- Type
- Construction: BuildingConstruction
- Term
- Aug 30, 2023 → Apr 30, 20273.7 years
- Approved
- Aug 28, 2023
- Status
- Active
- Amount
- $44,633,838
- Spent to date
- $42,072,138 · 94% of the amount
Renovation of Foster Hall at SUNY BuffaloState University Construction FundJun 7, 2022 – Apr 1, 2027Active$42,821,077
- Description
- Renovation of Foster Hall at SUNY Buffalo
- Contract number
- D006740
- Type
- Construction: BuildingConstruction
- Term
- Jun 7, 2022 → Apr 1, 20274.8 years
- Approved
- Jun 3, 2022
- Status
- Active
- Amount
- $42,821,077
- Spent to date
- $42,741,399 · 100% of the amount
Renovation of Classroom Building at Buffalo State CollegeState University Construction FundApr 1, 2022 – Apr 1, 2027Active$18,055,092
- Description
- Renovation of Classroom Building at Buffalo State College
- Contract number
- D006724
- Type
- Construction: BuildingConstruction
- Term
- Apr 1, 2022 → Apr 1, 20275 years
- Approved
- Mar 30, 2022
- Status
- Active
- Amount
- $18,055,092
- Spent to date
- $17,178,204 · 95% of the amount
Renovate Milne Library at SUNY GeneseoState University Construction FundJul 26, 2022 – Dec 31, 2025$27,640,601
- Description
- Renovate Milne Library at SUNY Geneseo
- Contract number
- D006756
- Type
- Construction: BuildingConstruction
- Term
- Jul 26, 2022 → Dec 31, 20253.4 years
- Approved
- Jul 20, 2022
- Status
- Ended
- Amount
- $27,640,601
- Spent to date
- $27,464,134 · 99% of the amount
Renovate Crosby Hall for SUNY Buffalo in Erie CountyState University Construction FundSep 3, 2021 – Aug 6, 2024$22,143,901
- Description
- Renovate Crosby Hall for SUNY Buffalo in Erie County
- Contract number
- D006661
- Type
- Construction: BuildingConstruction
- Term
- Sep 3, 2021 → Aug 6, 20242.9 years
- Approved
- Sep 1, 2021
- Status
- Ended
- Amount
- $22,143,901
- Spent to date
- $22,143,901 · 100% of the amount
Project 2017-216 heart of theSUNY at BuffaloJan 8, 2020 – Apr 25, 2024$27,735,591
- Description
- Project 2017-216 heart of the
- Contract number
- T500135
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- Jan 8, 2020 → Apr 25, 20244.3 years
- Approved
- Feb 27, 2020
- Status
- Ended
- Amount
- $27,735,591
- Spent to date
- $27,735,591 · 100% of the amount
SUCF061014 Reconstruct MechanState University Construction FundSep 30, 2019 – Dec 7, 2022$3,143,677
- Description
- SUCF061014 Reconstruct Mechan
- Contract number
- T006522
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Sep 30, 2019 → Dec 7, 20223.2 years
- Approved
- Sep 30, 2019
- Status
- Ended
- Amount
- $3,143,677
- Spent to date
- $3,143,677 · 100% of the amount
SUCF03X387 Renovate Science BState University Construction FundApr 30, 2018 – Sep 2, 2021$23,771,803
- Description
- SUCF03X387 Renovate Science B
- Contract number
- T006420
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Apr 30, 2018 → Sep 2, 20213.3 years
- Approved
- Apr 30, 2018
- Status
- Ended
- Amount
- $23,771,803
- Spent to date
- $23,771,803 · 100% of the amount
Academic success centerCollege at BrockportJan 23, 2017 – Jan 31, 2020$9,111,979
- Description
- Academic success center
- Contract number
- T161671
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- College at Brockport
- Term
- Jan 23, 2017 → Jan 31, 20203 years
- Approved
- Mar 14, 2017
- Status
- Ended
- Amount
- $9,111,979
- Spent to date
- $9,111,978 · 100% of the amount
PA Filed Contract-SUNY@Buffalo Ellicott Complex Spauld.Quad Laund.Rm Renov.Ph.3 Asbest&Haz.Mat.AbateDormitory Authority of the State of New YorkMar 3, 2016 – Aug 5, 2016$1,645,000
- Description
- PA Filed Contract-SUNY@Buffalo Ellicott Complex Spauld.Quad Laund.Rm Renov.Ph.3 Asbest&Haz.Mat.Abate
- Contract number
- D191559
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 3, 2016 → Aug 5, 20165 months
- Approved
- Mar 30, 2016
- Status
- Ended
- Amount
- $1,645,000
- Spent to date
- $0 · 0% of the amount
PA Filed Contract-SUNY@Buffalo Lehman&Clinton Laund.Renov.Ph.2 incl.Asbestos&Haz.Materials AbatementDormitory Authority of the State of New YorkMar 3, 2016 – Aug 5, 2016$1,488,000
- Description
- PA Filed Contract-SUNY@Buffalo Lehman&Clinton Laund.Renov.Ph.2 incl.Asbestos&Haz.Materials Abatement
- Contract number
- D191561
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 3, 2016 → Aug 5, 20165 months
- Approved
- Mar 30, 2016
- Status
- Ended
- Amount
- $1,488,000
- Spent to date
- $0 · 0% of the amount
SUCF 30B27 Restore Crofts HalState University Construction FundFeb 4, 2016 – Sep 1, 2017$800,994
- Description
- SUCF 30B27 Restore Crofts Hal
- Contract number
- T006200
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Feb 4, 2016 → Sep 1, 20171.6 years
- Approved
- Feb 17, 2016
- Status
- Ended
- Amount
- $800,994
- Spent to date
- $800,994 · 100% of the amount
Project 2015-026 heart of theSUNY at BuffaloSep 21, 2015 – Jan 29, 2018$5,352,283
- Description
- Project 2015-026 heart of the
- Contract number
- T500060
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- SUNY at Buffalo
- Term
- Sep 21, 2015 → Jan 29, 20182.3 years
- Approved
- Oct 27, 2015
- Status
- Ended
- Amount
- $5,352,283
- Spent to date
- $5,352,283 · 100% of the amount
Change order 20 for contract tState University Construction FundNov 18, 2013 – Jul 24, 2016$11,636,026
- Description
- Change order 20 for contract t
- Contract number
- T006035
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 18, 2013 → Jul 24, 20162.7 years
- Approved
- Nov 21, 2013
- Status
- Ended
- Amount
- $11,636,026
- Spent to date
- $11,636,026 · 100% of the amount
Sucf 22224 student leadership center phase 2, suc of tech at alfredState University Construction FundNov 16, 2011 – Aug 8, 2014$17,547,966
- Description
- Sucf 22224 student leadership center phase 2, suc of tech at alfred
- Contract number
- T005881
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Nov 16, 2011 → Aug 8, 20142.8 years
- Approved
- Nov 22, 2011
- Status
- Ended
- Amount
- $17,547,966
- Spent to date
- $17,547,966 · 100% of the amount
Sucf 03383 new technology building suc at buffaloState University Construction FundMay 25, 2011 – Oct 31, 2014$25,106,070
- Description
- Sucf 03383 new technology building suc at buffalo
- Contract number
- T005825
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 25, 2011 → Oct 31, 20143.4 years
- Approved
- May 25, 2011
- Status
- Ended
- Amount
- $25,106,070
- Spent to date
- $25,106,070 · 100% of the amount
Ej brown room 119 classroom upgrade and rehabiltationCollege of Technology at AlfredMay 13, 2011 – Sep 28, 2012$672,900
- Description
- Ej brown room 119 classroom upgrade and rehabiltation
- Contract number
- T000033
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- May 13, 2011 → Sep 28, 201217 months
- Approved
- May 16, 2011
- Status
- Ended
- Amount
- $672,900
- Spent to date
- $672,900 · 100% of the amount
Sucf 05325 williams center rehab SUNY college at fredoniaState University Construction FundMar 23, 2011 – Aug 7, 2013$10,843,259
- Description
- Sucf 05325 williams center rehab SUNY college at fredonia
- Contract number
- T005808
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 23, 2011 → Aug 7, 20132.4 years
- Approved
- May 4, 2011
- Status
- Ended
- Amount
- $10,843,259
- Spent to date
- $10,843,259 · 100% of the amount
Sucf 22197 rehab allied health BLDG SUNY alfredState University Construction FundFeb 17, 2011 – Apr 30, 2015$15,533,965
- Description
- Sucf 22197 rehab allied health BLDG SUNY alfred
- Contract number
- T005772
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Feb 17, 2011 → Apr 30, 20154.2 years
- Approved
- May 4, 2011
- Status
- Ended
- Amount
- $15,533,965
- Spent to date
- $15,171,062 · 98% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building5 contracts$155.3M
- Contract not subject to state pre-audit14 contracts$154.4M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2011: 5 contracts, $69.7M | 5 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 1 contracts, $11.6M | 1 |
| 2014: 0 contracts, $0.0 | 0 |
| 2015: 1 contracts, $5.4M | 1 |
| 2016: 3 contracts, $3.9M | 3 |
| 2017: 1 contracts, $9.1M | 1 |
| 2018: 1 contracts, $23.8M | 1 |
| 2019: 1 contracts, $3.1M | 1 |
| 2020: 1 contracts, $27.7M | 1 |
| 2021: 1 contracts, $22.1M | 1 |
| 2022: 3 contracts, $88.5M | 3 |
| 2023: 1 contracts, $44.6M | 1 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Extensive (A, 100/100): $310M in contracts, 3 active contracts.
- Contract volume+21.3measured
$310M in current contract value across 19 contracts, more than 98% of scored contractors.
- Recent activity+11.4measured
3 active contracts today; the most recent was approved in August 2023.
- Agency breadth+9.8measured
Contracts with 5 different state agencies and facilities.
- Experience+1.2measured
First contract started in February 2011 (15 years of contract history).
- Contract-type mix+2.6measured
2 contract types; the largest group is construction (50% of value). Goods and services contracts are 50% of the total.
- Spending vs. value+0.1measured
On 14 completed contracts with spending recorded, spending is 100% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration+5.2measured
Registered to do business with the federal government (registration active).
50 + contributions = 101.6, capped at 100Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
Lechase Construction Services LLC
Rochester, NYConstruction & Renovation
Since 200522 agencies
- Contract value
- $698.8M
- Contracts
- 142
- Active
- 25
- A
Dormitory Authority State of New York
Albany, NYConstruction & Renovation
Since 201721 agencies
- Contract value
- $291.0M
- Contracts
- 158
- Active
- 35
- A
John W Danforth Company
Tonawanda, NYConstruction & Renovation
Since 200722 agencies
- Contract value
- $97.0M
- Contracts
- 160
- Active
- 14
- A
Kircher Construction Inc
Construction & Renovation
Since 20089 agencies
- Contract value
- $67.7M
- Contracts
- 68
- Active
- 1
- A
Villager Construction Inc
Fairport, NYConstruction & Renovation
Since 20077 agencies
- Contract value
- $175.2M
- Contracts
- 42
- Active
- 3
- More construction & renovation contractors Ranked by contract value
Browse more
- State University Construction Fund contractors
- SUNY at Buffalo contractors
- College at Brockport contractors
- Dormitory Authority of the State of New York contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.