Natures Way Environmental Consultants and Contractor Inc
AState contracts since 2009Updated Nov 13, 2026
Natures Way Environmental Consultants and Contractor Inc holds 26 contracts worth $66.9M with 6 New York State agencies, most with Office of General Services - Design & Construction; 2 active today. The first started in 2009.
- Total contract value
- $66.9M
- Current contract amounts
- Spent to date
- $43.0M
- 64% of contract value
- Active contracts
- 2
- $8.3M in active value
- Contracts on record
- 26
- Since 2009
- Agencies served
- 6
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Contracts
26 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Provide patrol road and secure perimeter modifications Collins Correctional Facility Erie County D47324EConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47324E | Mar 25, 2026to Jan 22, 2027 | Mar 25, 2026 | Jan 22, 2027 | $272,888$170,223 spent | $170,223 | |
Where & when fuel tank modification & environmental remediation Western Region various counties D47676CConstruction: BuildingActive | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47676C | Jul 23, 2025to Oct 20, 2028 | Jul 23, 2025 | Oct 20, 2028 | $8,000,000$2,045,996 spent | $2,045,996 | |
Entrance monuments & paving at Letchworth State Park in Livingston and Wyoming Counties D006425Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006425 | Nov 18, 2025to Nov 18, 2026 | Nov 18, 2025 | Nov 18, 2026 | $1,586,290$1,117,906 spent | $1,117,906 | |
Provide pedestrian walkway & pavement restoration at Buffalo Armory in Erie County e trade D47457EConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47457E | Aug 7, 2024to Oct 26, 2025 | Aug 7, 2024 | Oct 26, 2025 | $177,724$176,774 spent | $176,774 | |
Parking lot & site improvements Woodlawn Beach State Park Erie County D006260Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006260 | Jul 2, 2024to Sep 30, 2025 | Jul 2, 2024 | Sep 30, 2025 | $2,021,912$2,021,912 spent | $2,021,912 | |
Decommission underground fuel station at Clinton Center in Niagara County D230004Construction: Building | College at Buffalo | Construction: BuildingConstruction | D230004 | Jun 26, 2024to Oct 24, 2024 | Jun 26, 2024 | Oct 24, 2024 | $177,224$177,224 spent | $177,224 | |
Construct main entry sign DeVeaux Woods State Park Niagara County D006185Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006185 | Dec 21, 2023to Jul 15, 2024 | Dec 21, 2023 | Jul 15, 2024 | $110,783$107,952 spent | $107,952 | |
Zoar Valley Valentine Flats access project phase 1 in Cattaraugus County D012978Construction: Miscellaneous | Department of Environmental Conservation | Construction: MiscellaneousConstruction | D012978 | Oct 27, 2023to Aug 30, 2024 | Oct 27, 2023 | Aug 30, 2024 | $790,692$782,106 spent | $782,106 | |
Wildlife Barrier Letchworth State Park Livingston Wyoming County D006130Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006130 | Jul 6, 2023to Jul 5, 2024 | Jul 6, 2023 | Jul 5, 2024 | $424,253$417,484 spent | $417,484 | |
Where & When for fuel tank modification and environmental remediation in the Western Region D47050CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D47050C | Oct 26, 2022to Jun 12, 2025 | Oct 26, 2022 | Jun 12, 2025 | $11,866,865$5,446,736 spent | $5,446,736 | |
Wetland restoration Woodland Beach State Park Erie County D005904Construction: Highway | Office of Parks Recreation & Historic Preservation | Construction: HighwayConstruction | D005904 | Oct 18, 2022to Oct 18, 2023 | Oct 18, 2022 | Oct 18, 2023 | $1,655,240$1,392,505 spent | $1,392,505 | |
Resurfacing & enhancements Genesee Valley Greenway State Park Monroe county D005797Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005797 | Jun 8, 2021to Nov 30, 2022 | Jun 8, 2021 | Nov 30, 2022 | $1,805,482$1,650,887 spent | $1,650,887 | |
Remove contaminated soils Albion CF Orleans county DEE550BConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEE550B | Mar 17, 2021to Nov 12, 2021 | Mar 17, 2021 | Nov 12, 2021 | $300,000$19,259 spent | $19,259 | |
Replace Underground Storage Tanks Power House Building 19 Albion CF Orleans County D45672HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45672H | Sep 25, 2020to Jan 8, 2022 | Sep 25, 2020 | Jan 8, 2022 | $1,875,653$1,875,570 spent | $1,875,570 | |
Replace Underground Storage Tanks Power House Building 19 Albion CF Orleans County D45672CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45672C | Sep 25, 2020to Dec 4, 2021 | Sep 25, 2020 | Dec 4, 2021 | $1,023,811$1,023,619 spent | $1,023,619 | |
2020-21 Osh t & e T20040GGContract not subject to state pre-audit | Department of Labor | Contract not subject to state pre-auditNot pre-audited | T20040GG | Aug 1, 2020to Jul 31, 2021 | Aug 1, 2020 | Jul 31, 2021 | $10,164$600 spent | $600 | |
2019-20 Osh t & e T19044GGContract not subject to state pre-audit | Department of Labor | Contract not subject to state pre-auditNot pre-audited | T19044GG | Aug 1, 2019to Jul 31, 2020 | Aug 1, 2019 | Jul 31, 2020 | $23,664$7,625 spent | $7,625 | |
Ralph C Wilson Jr Gateway Buffalo Harbor State Park Erie County D005508Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005508 | Mar 13, 2019to Dec 8, 2019 | Mar 13, 2019 | Dec 8, 2019 | $505,353$501,353 spent | $501,353 | |
Where & When Fuel Tank Modification & Environmental Remediation Various Facilities Western Region D45534CConstruction: Standby contracts | Office of General Services - Design & Construction | Construction: Standby contractsConstruction | D45534C | May 22, 2018to Aug 21, 2023 | May 22, 2018 | Aug 21, 2023 | $6,000,000$4,335,820 spent | $4,335,820 | |
Standby Investigation and Remediation - Regions 8, and 9 C100612Consultant: Environmental related services | Department of Environmental Conservation - Oil Spill | Consultant: Environmental related servicesConsultant | C100612 | Apr 1, 2016to Mar 31, 2023 | Apr 1, 2016 | Mar 31, 2023 | $12,000,000$8,213,451 spent | $8,213,451 |
Provide patrol road and secure perimeter modifications Collins Correctional Facility Erie CountyOffice of General Services - Design & ConstructionMar 25, 2026 – Jan 22, 2027Active$272,888
- Description
- Provide patrol road and secure perimeter modifications Collins Correctional Facility Erie County
- Contract number
- D47324E
- Type
- Construction: BuildingConstruction
- Term
- Mar 25, 2026 → Jan 22, 202710 months
- Approved
- Mar 25, 2026
- Status
- Active
- Amount
- $272,888
- Spent to date
- $170,223 · 62% of the amount
Where & when fuel tank modification & environmental remediation Western Region various countiesOffice of General Services - Design & ConstructionJul 23, 2025 – Oct 20, 2028Active$8,000,000
- Description
- Where & when fuel tank modification & environmental remediation Western Region various counties
- Contract number
- D47676C
- Type
- Construction: BuildingConstruction
- Term
- Jul 23, 2025 → Oct 20, 20283.3 years
- Approved
- Jul 23, 2025
- Status
- Active
- Amount
- $8,000,000
- Spent to date
- $2,045,996 · 26% of the amount
Entrance monuments & paving at Letchworth State Park in Livingston and Wyoming CountiesOffice of Parks Recreation & Historic PreservationNov 18, 2025 – Nov 18, 2026$1,586,290
- Description
- Entrance monuments & paving at Letchworth State Park in Livingston and Wyoming Counties
- Contract number
- D006425
- Type
- Construction: BuildingConstruction
- Term
- Nov 18, 2025 → Nov 18, 202612 months
- Approved
- Nov 18, 2025
- Status
- Ended
- Amount
- $1,586,290
- Spent to date
- $1,117,906 · 70% of the amount
Provide pedestrian walkway & pavement restoration at Buffalo Armory in Erie County e tradeOffice of General Services - Design & ConstructionAug 7, 2024 – Oct 26, 2025$177,724
- Description
- Provide pedestrian walkway & pavement restoration at Buffalo Armory in Erie County e trade
- Contract number
- D47457E
- Type
- Construction: BuildingConstruction
- Term
- Aug 7, 2024 → Oct 26, 202515 months
- Approved
- Aug 7, 2024
- Status
- Ended
- Amount
- $177,724
- Spent to date
- $176,774 · 99% of the amount
Parking lot & site improvements Woodlawn Beach State Park Erie CountyOffice of Parks Recreation & Historic PreservationJul 2, 2024 – Sep 30, 2025$2,021,912
- Description
- Parking lot & site improvements Woodlawn Beach State Park Erie County
- Contract number
- D006260
- Type
- Construction: BuildingConstruction
- Term
- Jul 2, 2024 → Sep 30, 202515 months
- Approved
- Jul 2, 2024
- Status
- Ended
- Amount
- $2,021,912
- Spent to date
- $2,021,912 · 100% of the amount
Decommission underground fuel station at Clinton Center in Niagara CountyCollege at BuffaloJun 26, 2024 – Oct 24, 2024$177,224
- Description
- Decommission underground fuel station at Clinton Center in Niagara County
- Contract number
- D230004
- Type
- Construction: BuildingConstruction
- Agency
- College at Buffalo
- Term
- Jun 26, 2024 → Oct 24, 20244 months
- Approved
- Jun 26, 2024
- Status
- Ended
- Amount
- $177,224
- Spent to date
- $177,224 · 100% of the amount
Construct main entry sign DeVeaux Woods State Park Niagara CountyOffice of Parks Recreation & Historic PreservationDec 21, 2023 – Jul 15, 2024$110,783
- Description
- Construct main entry sign DeVeaux Woods State Park Niagara County
- Contract number
- D006185
- Type
- Construction: BuildingConstruction
- Term
- Dec 21, 2023 → Jul 15, 20247 months
- Approved
- Dec 21, 2023
- Status
- Ended
- Amount
- $110,783
- Spent to date
- $107,952 · 97% of the amount
Zoar Valley Valentine Flats access project phase 1 in Cattaraugus CountyDepartment of Environmental ConservationOct 27, 2023 – Aug 30, 2024$790,692
- Description
- Zoar Valley Valentine Flats access project phase 1 in Cattaraugus County
- Contract number
- D012978
- Type
- Construction: MiscellaneousConstruction
- Term
- Oct 27, 2023 → Aug 30, 202410 months
- Approved
- Oct 27, 2023
- Status
- Ended
- Amount
- $790,692
- Spent to date
- $782,106 · 99% of the amount
Wildlife Barrier Letchworth State Park Livingston Wyoming CountyOffice of Parks Recreation & Historic PreservationJul 6, 2023 – Jul 5, 2024$424,253
- Description
- Wildlife Barrier Letchworth State Park Livingston Wyoming County
- Contract number
- D006130
- Type
- Construction: BuildingConstruction
- Term
- Jul 6, 2023 → Jul 5, 202412 months
- Approved
- Jul 6, 2023
- Status
- Ended
- Amount
- $424,253
- Spent to date
- $417,484 · 98% of the amount
Where & When for fuel tank modification and environmental remediation in the Western RegionOffice of General Services - Design & ConstructionOct 26, 2022 – Jun 12, 2025$11,866,865
- Description
- Where & When for fuel tank modification and environmental remediation in the Western Region
- Contract number
- D47050C
- Type
- Construction: BuildingConstruction
- Term
- Oct 26, 2022 → Jun 12, 20252.7 years
- Approved
- Oct 26, 2022
- Status
- Ended
- Amount
- $11,866,865
- Spent to date
- $5,446,736 · 46% of the amount
Wetland restoration Woodland Beach State Park Erie CountyOffice of Parks Recreation & Historic PreservationOct 18, 2022 – Oct 18, 2023$1,655,240
- Description
- Wetland restoration Woodland Beach State Park Erie County
- Contract number
- D005904
- Type
- Construction: HighwayConstruction
- Term
- Oct 18, 2022 → Oct 18, 202312 months
- Approved
- Oct 18, 2022
- Status
- Ended
- Amount
- $1,655,240
- Spent to date
- $1,392,505 · 84% of the amount
Resurfacing & enhancements Genesee Valley Greenway State Park Monroe countyOffice of Parks Recreation & Historic PreservationJun 8, 2021 – Nov 30, 2022$1,805,482
- Description
- Resurfacing & enhancements Genesee Valley Greenway State Park Monroe county
- Contract number
- D005797
- Type
- Construction: BuildingConstruction
- Term
- Jun 8, 2021 → Nov 30, 20221.5 years
- Approved
- Jun 8, 2021
- Status
- Ended
- Amount
- $1,805,482
- Spent to date
- $1,650,887 · 91% of the amount
Remove contaminated soils Albion CF Orleans countyOffice of General Services - Design & ConstructionMar 17, 2021 – Nov 12, 2021$300,000
- Description
- Remove contaminated soils Albion CF Orleans county
- Contract number
- DEE550B
- Type
- Construction: BuildingConstruction
- Term
- Mar 17, 2021 → Nov 12, 20218 months
- Approved
- Apr 23, 2021
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $19,259 · 6% of the amount
Replace Underground Storage Tanks Power House Building 19 Albion CF Orleans CountyOffice of General Services - Design & ConstructionSep 25, 2020 – Jan 8, 2022$1,875,653
- Description
- Replace Underground Storage Tanks Power House Building 19 Albion CF Orleans County
- Contract number
- D45672H
- Type
- Construction: BuildingConstruction
- Term
- Sep 25, 2020 → Jan 8, 202215 months
- Approved
- Sep 25, 2020
- Status
- Ended
- Amount
- $1,875,653
- Spent to date
- $1,875,570 · 100% of the amount
Replace Underground Storage Tanks Power House Building 19 Albion CF Orleans CountyOffice of General Services - Design & ConstructionSep 25, 2020 – Dec 4, 2021$1,023,811
- Description
- Replace Underground Storage Tanks Power House Building 19 Albion CF Orleans County
- Contract number
- D45672C
- Type
- Construction: BuildingConstruction
- Term
- Sep 25, 2020 → Dec 4, 202114 months
- Approved
- Sep 25, 2020
- Status
- Ended
- Amount
- $1,023,811
- Spent to date
- $1,023,619 · 100% of the amount
2020-21 Osh t & eDepartment of LaborAug 1, 2020 – Jul 31, 2021$10,164
- Description
- 2020-21 Osh t & e
- Contract number
- T20040GG
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- Department of Labor
- Term
- Aug 1, 2020 → Jul 31, 202112 months
- Approved
- Jun 2, 2021
- Status
- Ended
- Amount
- $10,164
- Spent to date
- $600 · 6% of the amount
2019-20 Osh t & eDepartment of LaborAug 1, 2019 – Jul 31, 2020$23,664
- Description
- 2019-20 Osh t & e
- Contract number
- T19044GG
- Type
- Contract not subject to state pre-auditNot pre-audited
- Agency
- Department of Labor
- Term
- Aug 1, 2019 → Jul 31, 202012 months
- Approved
- Jul 18, 2019
- Status
- Ended
- Amount
- $23,664
- Spent to date
- $7,625 · 32% of the amount
Ralph C Wilson Jr Gateway Buffalo Harbor State Park Erie CountyOffice of Parks Recreation & Historic PreservationMar 13, 2019 – Dec 8, 2019$505,353
- Description
- Ralph C Wilson Jr Gateway Buffalo Harbor State Park Erie County
- Contract number
- D005508
- Type
- Construction: BuildingConstruction
- Term
- Mar 13, 2019 → Dec 8, 20199 months
- Approved
- Mar 13, 2019
- Status
- Ended
- Amount
- $505,353
- Spent to date
- $501,353 · 99% of the amount
Where & When Fuel Tank Modification & Environmental Remediation Various Facilities Western RegionOffice of General Services - Design & ConstructionMay 22, 2018 – Aug 21, 2023$6,000,000
- Description
- Where & When Fuel Tank Modification & Environmental Remediation Various Facilities Western Region
- Contract number
- D45534C
- Type
- Construction: Standby contractsConstruction
- Term
- May 22, 2018 → Aug 21, 20235.3 years
- Approved
- May 22, 2018
- Status
- Ended
- Amount
- $6,000,000
- Spent to date
- $4,335,820 · 72% of the amount
Standby Investigation and Remediation - Regions 8, and 9Department of Environmental Conservation - Oil SpillApr 1, 2016 – Mar 31, 2023$12,000,000
- Description
- Standby Investigation and Remediation - Regions 8, and 9
- Contract number
- C100612
- Type
- Consultant: Environmental related servicesConsultant
- Term
- Apr 1, 2016 → Mar 31, 20237 years
- Approved
- Oct 18, 2016
- Status
- Ended
- Amount
- $12,000,000
- Spent to date
- $8,213,451 · 68% of the amount
Contract-type mix
Share of contract value by type
- Construction22 contracts$49.8M
- Consultant: Environmental related services2 contracts$17.0M
- Contract not subject to state pre-audit2 contracts$33.8K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 1 contracts, $5.0M | 1 |
| 2010: 0 contracts, $0.0 | 0 |
| 2011: 1 contracts, $200.0K | 1 |
| 2012: 2 contracts, $4.3M | 2 |
| 2013: 0 contracts, $0.0 | 0 |
| 2014: 1 contracts, $6.0M | 1 |
| 2015: 1 contracts, $744.4K | 1 |
| 2016: 1 contracts, $12.0M | 1 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 1 contracts, $6.0M | 1 |
| 2019: 2 contracts, $529.0K | 2 |
| 2020: 3 contracts, $2.9M | 3 |
| 2021: 2 contracts, $2.1M | 2 |
| 2022: 2 contracts, $13.5M | 2 |
| 2023: 3 contracts, $1.3M | 3 |
| 2024: 3 contracts, $2.4M | 3 |
| 2025: 2 contracts, $9.6M | 2 |
| 2026: 1 contracts, $272.9K | 1 |
How the Contractor Score adds up
Extensive (A, 100/100): $67M in contracts, 2 active contracts.
- Contract volume+16.4measured
$67M in current contract value across 26 contracts, more than 95% of scored contractors.
- Recent activity+14.0measured
2 active contracts today; the most recent was approved in March 2026.
- Agency breadth+10.3measured
Contracts with 6 different state agencies and facilities.
- Experience+1.8measured
First contract started in February 2009 (17 years of contract history).
- Contract-type mix+7.9measured
6 contract types; the largest group is construction (75% of value). Goods and services contracts are 100% of the total.
- Spending vs. value−0.7measured
On 24 completed contracts with spending recorded, spending is 70% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 100 (A, Extensive)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
- Office of General Services - Design & Construction12 contracts$40.0M
- Department of Environmental Conservation - Oil Spill2 contracts$17.0M
- Office of Parks Recreation & Historic Preservation7 contracts$8.1M
- Department of Environmental Conservation2 contracts$1.5M
- College at Buffalo1 contract$177.2K
- Department of Labor2 contracts$33.8K
Similar contractors
- A
Weydman Electric Inc
Tonawanda, NYConstruction & Renovation
Since 200810 agencies
- Contract value
- $34.4M
- Contracts
- 44
- Active
- 7
- A
Mark Cerrone Inc
Niagara Falls, NYConstruction & Renovation
Since 20099 agencies
- Contract value
- $193.8M
- Contracts
- 39
- Active
- 1
- A
Oconnell Electric Company Inc
Victor, NYConstruction & Renovation
Since 200052 agencies
- Contract value
- $251.8M
- Contracts
- 220
- Active
- 13
- A
Union Concrete and Construction Corp
West Seneca, NYConstruction & Renovation
Since 20078 agencies
- Contract value
- $857.6M
- Contracts
- 124
- Active
- 12
- A
Kircher Construction Inc
Construction & Renovation
Since 20089 agencies
- Contract value
- $67.7M
- Contracts
- 68
- Active
- 1
- A
Stilsing Electric Inc
Rensselaer, NYConstruction & Renovation
Since 20087 agencies
- Contract value
- $68.4M
- Contracts
- 133
- Active
- 23
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Department of Environmental Conservation - Oil Spill contractors
- Office of Parks Recreation & Historic Preservation contractors
- Department of Environmental Conservation contractors
- Construction & Renovation contractors
- Top contractors
- All contractors