NY State contractorConstruction & Renovation

Yonkers Contracting Co Inc

Yonkers, NY State contracts since 2008Updated Nov 13, 2026

Yonkers Contracting Co Inc holds 28 contracts worth $1.2B with 2 New York State agencies, most with Department of Transportation; 4 active today. The first started in 2008.

Total contract value
$1.2B
Current contract amounts
Spent to date
$531.6M
45% of contract value
Active contracts
4
$589.3M in active value
Contracts on record
28
Since 2008
Agencies served
2
Most with Department of Transportation
Years active
18
First contract 2008

Contact & company

Business information and how to reach the company.

Email

Address

969 Midland AveYonkers, NY 10704Westchester County
Legal name
Yonkers Contracting Co Inc
Identifiers
UEI VN54NJFVULK7 · CAGE 1N1F3
Federal registration
Active · renews by Jan 2027
In business since
1945

Industry codes (NAICS)

  • 237990Other Heavy and Civil Engineering Construction
  • 237310Highway, Street, and Bridge Construction

Leadership

  • Michael Ryan

    President & Ceo

  • Carl E. Petrillo

    Chairman

  • Edward J. Petrillo

    Founder

  • Richard D Mcgrath

    Senior Vice President

  • Anna Spathos

    Administrative Assistant

  • Paul T Conley

    Chief Financial Officer

Contracts

28 contracts with New York State agencies, active first. Open a row for the full record.

Contracts
DetailsContractTypeContract no.Term

PMI pavement resurfacing Routes 117 & 9A in Westchester County

D265748Construction: HighwayActive

Department of TransportationConstruction: HighwayConstructionD265748May 5, 2026to Aug 31, 2027May 5, 2026Aug 31, 2027$13,511,530$836,960 spent$836,960

Corridor paving Route 304 Clarkstown Rockland County

D265712Construction: HighwayActive

Department of TransportationConstruction: HighwayConstructionD265712Apr 10, 2026to Jul 31, 2027Apr 10, 2026Jul 31, 2027$18,877,285$7,389,818 spent$7,389,818

Pavement rehab Routes 987F SH9480 987G SH9488 Greenburgh and Mount Pleasant Westchester County

D265686Construction: HighwayActive

Department of TransportationConstruction: HighwayConstructionD265686Feb 13, 2026to Oct 31, 2027Feb 13, 2026Oct 31, 2027$39,371,477$4,424,330 spent$4,424,330

Replacement of two bridges at the Bronx River Parkway in Bronx County

D900059Construction: HighwayActive

Department of TransportationConstruction: HighwayConstructionD900059May 31, 2024to Dec 29, 2027May 31, 2024Dec 29, 2027$517,511,969$186,976,961 spent$186,976,961

Mill & inlay and drainage & safety improvements I-287 Route 17S Exit 15 Rockland & Orange Counties

D214875Construction: Highway

New York State Thruway AuthorityConstruction: HighwayConstructionD214875Jul 8, 2022to Oct 27, 2023Jul 8, 2022Oct 27, 2023$44,611,789$0 spent$0

Paving Taconic State Parkway from Tyrrel Road to Willow Lane Dutchess County

D264686Construction: Highway

Department of TransportationConstruction: HighwayConstructionD264686Feb 22, 2022to Nov 14, 2022Feb 22, 2022Nov 14, 2022$7,767,855$7,767,855 spent$7,767,855

Interstate 84 paving Bowen Road overpass to Connecticut state line Dutchess & Putnam Counties

D264612Construction: Highway

Department of TransportationConstruction: HighwayConstructionD264612Jan 7, 2022to Dec 31, 2022Jan 7, 2022Dec 31, 2022$18,973,297$18,973,297 spent$18,973,297

Pavement resurfacing and jacking of 3 bridges New England Thruway Westchester County

D214781Construction: Building

New York State Thruway AuthorityConstruction: BuildingConstructionD214781Jun 14, 2021to Sep 20, 2022Jun 14, 2021Sep 20, 2022$18,857,585$0 spent$0

Stipend payment for D900051

D038137Service: Other / misc. services

Department of TransportationService: Other / misc. servicesServiceD038137Jul 8, 2020to Nov 18, 2020Jul 8, 2020Nov 18, 2020$700,000$700,000 spent$700,000

Asphalt Resurface Route 22 Town of Patterson Putnam County

D264240Construction: Highway

Department of TransportationConstruction: HighwayConstructionD264240Jun 16, 2020to Aug 31, 2020Jun 16, 2020Aug 31, 2020$2,303,775$2,303,775 spent$2,303,775

Pavement Preventive Maintenance Routes 303 and 17 Orangetown Orange County Region 3

D264157Construction: Highway

Department of TransportationConstruction: HighwayConstructionD264157Mar 23, 2020to Jul 31, 2020Mar 23, 2020Jul 31, 2020$3,487,367$3,487,367 spent$3,487,367

Harsh Winter Paving Over 7 Miles Along Routes 137 & 139 Westchester County

D264014Construction: Highway

Department of TransportationConstruction: HighwayConstructionD264014Nov 26, 2019to Jul 31, 2020Nov 26, 2019Jul 31, 2020$4,097,293$4,097,293 spent$4,097,293

Enhancement Project Arthur Sheridan Expressway I 895 Conversion to NY 895 Bronx County Best Value

D263747Construction: Highway

Department of TransportationConstruction: HighwayConstructionD263747Sep 5, 2018to Jan 1, 2020Sep 5, 2018Jan 1, 2020$45,977,788$45,977,788 spent$45,977,788

Shared Path Facilities & Bicycle/Pedestrian Connection New NY Bridge MP 16-75 Rockland Co TANY18-12

D214583Construction: Miscellaneous

New York State Thruway AuthorityConstruction: MiscellaneousConstructionD214583Jul 18, 2018to Oct 30, 2020Jul 18, 2018Oct 30, 2020$46,005,376$1,045,558 spent$1,045,558

Intersection Reconstruction of Exit 131 at Route 17 and Route 32, Design/Build RFP Region 8

D900038Construction: Highway

Department of TransportationConstruction: HighwayConstructionD900038Nov 28, 2017to Jul 31, 2020Nov 28, 2017Jul 31, 2020$140,458,619$140,458,619 spent$140,458,619

4.7miles-Asphalt Concrete Overlay-Cracked Pvmt I-684 Town of Salem Putnam and Westchester Counties

D263441Construction: Highway

Department of TransportationConstruction: HighwayConstructionD263441Jun 29, 2017to Feb 21, 2019Jun 29, 2017Feb 21, 2019$47,644,975$47,644,975 spent$47,644,975

Replacemt of Rte 987D (Saw Mill Pkwy) Bridge/Culvert over Kisco River&Branch Brook Westchester Co

D263244Construction: Building

Department of TransportationConstruction: BuildingConstructionD263244Dec 6, 2016to Sep 21, 2018Dec 6, 2016Sep 21, 2018$19,209,336$19,209,336 spent$19,209,336

Pavement rehabilitation safety improvements & misc work westchester county

D214328Construction: Highway

New York State Thruway AuthorityConstruction: HighwayConstructionD214328Jan 26, 2015to Oct 30, 2015Jan 26, 2015Oct 30, 2015$7,087,970$0 spent$0

Stipend Agreement for Proposal Preparation/Submission for D900025, 6 Bundled Brid Org&Westchester Co

D031408Service: Other / misc. services

Department of TransportationService: Other / misc. servicesServiceD031408Oct 16, 2014to Jul 1, 2015Oct 16, 2014Jul 1, 2015$95,000$0 spent$0

New England Thruway I-95 Pavement Rehab between MP NE0.17 - NE14.1, Including 6 Bridges

D214256Construction: Building

New York State Thruway AuthorityConstruction: BuildingConstructionD214256Jul 25, 2014to Apr 30, 2017Jul 25, 2014Apr 30, 2017$59,729,182$0 spent$0
PMI pavement resurfacing Routes 117 & 9A in Westchester CountyDepartment of TransportationMay 5, 2026 – Aug 31, 2027Active$13,511,530
Description
PMI pavement resurfacing Routes 117 & 9A in Westchester County
Contract number
D265748
Type
Construction: HighwayConstruction
Term
May 5, 2026 → Aug 31, 202716 months
Approved
May 5, 2026
Status
Active
Amount
$13,511,530
Spent to date
$836,960 · 6% of the amount
Corridor paving Route 304 Clarkstown Rockland CountyDepartment of TransportationApr 10, 2026 – Jul 31, 2027Active$18,877,285
Description
Corridor paving Route 304 Clarkstown Rockland County
Contract number
D265712
Type
Construction: HighwayConstruction
Term
Apr 10, 2026 → Jul 31, 202716 months
Approved
Apr 10, 2026
Status
Active
Amount
$18,877,285
Spent to date
$7,389,818 · 39% of the amount
Pavement rehab Routes 987F SH9480 987G SH9488 Greenburgh and Mount Pleasant Westchester CountyDepartment of TransportationFeb 13, 2026 – Oct 31, 2027Active$39,371,477
Description
Pavement rehab Routes 987F SH9480 987G SH9488 Greenburgh and Mount Pleasant Westchester County
Contract number
D265686
Type
Construction: HighwayConstruction
Term
Feb 13, 2026 → Oct 31, 20271.8 years
Approved
Feb 13, 2026
Status
Active
Amount
$39,371,477
Spent to date
$4,424,330 · 11% of the amount
Replacement of two bridges at the Bronx River Parkway in Bronx CountyDepartment of TransportationMay 31, 2024 – Dec 29, 2027Active$517,511,969
Description
Replacement of two bridges at the Bronx River Parkway in Bronx County
Contract number
D900059
Type
Construction: HighwayConstruction
Term
May 31, 2024 → Dec 29, 20273.6 years
Approved
May 31, 2024
Status
Active
Amount
$517,511,969
Spent to date
$186,976,961 · 36% of the amount
Mill & inlay and drainage & safety improvements I-287 Route 17S Exit 15 Rockland & Orange CountiesNew York State Thruway AuthorityJul 8, 2022 – Oct 27, 2023$44,611,789
Description
Mill & inlay and drainage & safety improvements I-287 Route 17S Exit 15 Rockland & Orange Counties
Contract number
D214875
Type
Construction: HighwayConstruction
Term
Jul 8, 2022 → Oct 27, 202316 months
Approved
Jul 8, 2022
Status
Ended
Amount
$44,611,789
Spent to date
$0 · 0% of the amount
Paving Taconic State Parkway from Tyrrel Road to Willow Lane Dutchess CountyDepartment of TransportationFeb 22, 2022 – Nov 14, 2022$7,767,855
Description
Paving Taconic State Parkway from Tyrrel Road to Willow Lane Dutchess County
Contract number
D264686
Type
Construction: HighwayConstruction
Term
Feb 22, 2022 → Nov 14, 20229 months
Approved
Feb 22, 2022
Status
Ended
Amount
$7,767,855
Spent to date
$7,767,855 · 100% of the amount
Interstate 84 paving Bowen Road overpass to Connecticut state line Dutchess & Putnam CountiesDepartment of TransportationJan 7, 2022 – Dec 31, 2022$18,973,297
Description
Interstate 84 paving Bowen Road overpass to Connecticut state line Dutchess & Putnam Counties
Contract number
D264612
Type
Construction: HighwayConstruction
Term
Jan 7, 2022 → Dec 31, 202212 months
Approved
Jan 7, 2022
Status
Ended
Amount
$18,973,297
Spent to date
$18,973,297 · 100% of the amount
Pavement resurfacing and jacking of 3 bridges New England Thruway Westchester CountyNew York State Thruway AuthorityJun 14, 2021 – Sep 20, 2022$18,857,585
Description
Pavement resurfacing and jacking of 3 bridges New England Thruway Westchester County
Contract number
D214781
Type
Construction: BuildingConstruction
Term
Jun 14, 2021 → Sep 20, 202215 months
Approved
Jun 14, 2021
Status
Ended
Amount
$18,857,585
Spent to date
$0 · 0% of the amount
Stipend payment for D900051Department of TransportationJul 8, 2020 – Nov 18, 2020$700,000
Description
Stipend payment for D900051
Contract number
D038137
Type
Service: Other / misc. servicesService
Term
Jul 8, 2020 → Nov 18, 20204 months
Approved
Aug 19, 2021
Status
Ended
Amount
$700,000
Spent to date
$700,000 · 100% of the amount
Asphalt Resurface Route 22 Town of Patterson Putnam CountyDepartment of TransportationJun 16, 2020 – Aug 31, 2020$2,303,775
Description
Asphalt Resurface Route 22 Town of Patterson Putnam County
Contract number
D264240
Type
Construction: HighwayConstruction
Term
Jun 16, 2020 → Aug 31, 20202 months
Approved
Jun 16, 2020
Status
Ended
Amount
$2,303,775
Spent to date
$2,303,775 · 100% of the amount
Pavement Preventive Maintenance Routes 303 and 17 Orangetown Orange County Region 3Department of TransportationMar 23, 2020 – Jul 31, 2020$3,487,367
Description
Pavement Preventive Maintenance Routes 303 and 17 Orangetown Orange County Region 3
Contract number
D264157
Type
Construction: HighwayConstruction
Term
Mar 23, 2020 → Jul 31, 20204 months
Approved
Mar 23, 2020
Status
Ended
Amount
$3,487,367
Spent to date
$3,487,367 · 100% of the amount
Harsh Winter Paving Over 7 Miles Along Routes 137 & 139 Westchester CountyDepartment of TransportationNov 26, 2019 – Jul 31, 2020$4,097,293
Description
Harsh Winter Paving Over 7 Miles Along Routes 137 & 139 Westchester County
Contract number
D264014
Type
Construction: HighwayConstruction
Term
Nov 26, 2019 → Jul 31, 20208 months
Approved
Nov 26, 2019
Status
Ended
Amount
$4,097,293
Spent to date
$4,097,293 · 100% of the amount
Enhancement Project Arthur Sheridan Expressway I 895 Conversion to NY 895 Bronx County Best ValueDepartment of TransportationSep 5, 2018 – Jan 1, 2020$45,977,788
Description
Enhancement Project Arthur Sheridan Expressway I 895 Conversion to NY 895 Bronx County Best Value
Contract number
D263747
Type
Construction: HighwayConstruction
Term
Sep 5, 2018 → Jan 1, 202016 months
Approved
Sep 5, 2018
Status
Ended
Amount
$45,977,788
Spent to date
$45,977,788 · 100% of the amount
Shared Path Facilities & Bicycle/Pedestrian Connection New NY Bridge MP 16-75 Rockland Co TANY18-12New York State Thruway AuthorityJul 18, 2018 – Oct 30, 2020$46,005,376
Description
Shared Path Facilities & Bicycle/Pedestrian Connection New NY Bridge MP 16-75 Rockland Co TANY18-12
Contract number
D214583
Type
Construction: MiscellaneousConstruction
Term
Jul 18, 2018 → Oct 30, 20202.3 years
Approved
Jul 18, 2018
Status
Ended
Amount
$46,005,376
Spent to date
$1,045,558 · 2% of the amount
Intersection Reconstruction of Exit 131 at Route 17 and Route 32, Design/Build RFP Region 8Department of TransportationNov 28, 2017 – Jul 31, 2020$140,458,619
Description
Intersection Reconstruction of Exit 131 at Route 17 and Route 32, Design/Build RFP Region 8
Contract number
D900038
Type
Construction: HighwayConstruction
Term
Nov 28, 2017 → Jul 31, 20202.7 years
Approved
Nov 28, 2017
Status
Ended
Amount
$140,458,619
Spent to date
$140,458,619 · 100% of the amount
4.7miles-Asphalt Concrete Overlay-Cracked Pvmt I-684 Town of Salem Putnam and Westchester CountiesDepartment of TransportationJun 29, 2017 – Feb 21, 2019$47,644,975
Description
4.7miles-Asphalt Concrete Overlay-Cracked Pvmt I-684 Town of Salem Putnam and Westchester Counties
Contract number
D263441
Type
Construction: HighwayConstruction
Term
Jun 29, 2017 → Feb 21, 20191.7 years
Approved
Jun 29, 2017
Status
Ended
Amount
$47,644,975
Spent to date
$47,644,975 · 100% of the amount
Replacemt of Rte 987D (Saw Mill Pkwy) Bridge/Culvert over Kisco River&Branch Brook Westchester CoDepartment of TransportationDec 6, 2016 – Sep 21, 2018$19,209,336
Description
Replacemt of Rte 987D (Saw Mill Pkwy) Bridge/Culvert over Kisco River&Branch Brook Westchester Co
Contract number
D263244
Type
Construction: BuildingConstruction
Term
Dec 6, 2016 → Sep 21, 20181.8 years
Approved
Dec 6, 2016
Status
Ended
Amount
$19,209,336
Spent to date
$19,209,336 · 100% of the amount
Pavement rehabilitation safety improvements & misc work westchester countyNew York State Thruway AuthorityJan 26, 2015 – Oct 30, 2015$7,087,970
Description
Pavement rehabilitation safety improvements & misc work westchester county
Contract number
D214328
Type
Construction: HighwayConstruction
Term
Jan 26, 2015 → Oct 30, 20159 months
Approved
Jan 26, 2015
Status
Ended
Amount
$7,087,970
Spent to date
$0 · 0% of the amount
Stipend Agreement for Proposal Preparation/Submission for D900025, 6 Bundled Brid Org&Westchester CoDepartment of TransportationOct 16, 2014 – Jul 1, 2015$95,000
Description
Stipend Agreement for Proposal Preparation/Submission for D900025, 6 Bundled Brid Org&Westchester Co
Contract number
D031408
Type
Service: Other / misc. servicesService
Term
Oct 16, 2014 → Jul 1, 20158 months
Approved
Mar 13, 2017
Status
Ended
Amount
$95,000
Spent to date
$0 · 0% of the amount
New England Thruway I-95 Pavement Rehab between MP NE0.17 - NE14.1, Including 6 BridgesNew York State Thruway AuthorityJul 25, 2014 – Apr 30, 2017$59,729,182
Description
New England Thruway I-95 Pavement Rehab between MP NE0.17 - NE14.1, Including 6 Bridges
Contract number
D214256
Type
Construction: BuildingConstruction
Term
Jul 25, 2014 → Apr 30, 20172.8 years
Approved
Jul 25, 2014
Status
Ended
Amount
$59,729,182
Spent to date
$0 · 0% of the amount
1–20 of 28Page 1 of 2

Contract-type mix

Share of contract value by type

Contracts over time

Contracts started per year

View as table
YearContracts
2008: 1 contracts, $79.1M1
2009: 0 contracts, $0.00
2010: 1 contracts, $4.7M1
2011: 2 contracts, $8.7M2
2012: 3 contracts, $24.1M3
2013: 1 contracts, $2.8M1
2014: 2 contracts, $59.8M2
2015: 1 contracts, $7.1M1
2016: 1 contracts, $19.2M1
2017: 2 contracts, $188.1M2
2018: 2 contracts, $92.0M2
2019: 1 contracts, $4.1M1
2020: 3 contracts, $6.5M3
2021: 1 contracts, $18.9M1
2022: 3 contracts, $71.4M3
2023: 0 contracts, $0.00
2024: 1 contracts, $517.5M1
2025: 0 contracts, $0.00
2026: 3 contracts, $71.8M3

How the Contractor Score adds up

Extensive (A, 100/100): $1.2B in contracts, 4 active contracts.

  • Contract volume+21.8measured

    $1.2B in current contract value across 28 contracts, among the largest 1% of scored contractors.

  • Recent activity+16.2measured

    4 active contracts today; the most recent was approved in May 2026.

  • Agency breadth+4.3measured

    Contracts with 2 different state agencies and facilities.

  • Experience+2.1measured

    First contract started in April 2008 (18 years of contract history).

  • Contract-type mix+7.0measured

    4 contract types; the largest group is construction (100% of value). Goods and services contracts are 100% of the total.

  • Spending vs. value−0.1measured

    On 18 completed contracts with spending recorded, spending is 88% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.

  • Federal award history0.0unknown

    No federal award history found. Scored as neutral.

  • Federal registration+5.2measured

    Registered to do business with the federal government (registration active).

50 + contributions = 106.5, capped at 100Starts at 50. Bars: cool adds, warm subtracts.

Agencies served

Contract value with each agency or facility

Browse more

Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.