Skip to content
FederalSolicitationOpen Federal notice

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Department of Energy› Fermilab - DOE Contractor Batavia, IL

Solicitation # RFP-376508-CDUpdated Nov 19, 2026Scored Nov 21, 2026

Amended Nov 20, 2026: Description updated

Responses due

Dec 17

Dec 17, 2026, 4:00 PM CST

Posted Sep 17Due Dec 17

Summary by RFP Detector

What this RFP is about

Department of Energy (Fermilab - DOE Contractor) posted a solicitation titled “Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB” under solicitation number RFP-376508-CD. It was first posted on Sep 17, 2026 and has been updated 4 times since. Responses are due Dec 17, 2026, 4:00 PM CST. It is classified under NAICS 236210 (Industrial Building Construction) and product/service code Z2EZ. No set-aside is listed. The place of performance is Batavia, Illinois. The listed point of contact is Chris Daley.

Key facts

Sector
Federal
Notice type
Solicitation
PSC
Z2EZ
Place of performance
Batavia, IL
ZIP 60510
Value
Not statedTypical award in this market ≈ $188.7K
Solicitation #
RFP-376508-CD
Listing
Official federal notice

RFP Detector Score

Score breakdown

Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.

Starts at 50

  • Value−2.9estimated

    No value published. Typical award is about $189K: the median of 989 federal contracts over $25K awarded in NAICS 236210, FY24–FY26.

  • Competition & access−0.5estimated

    Full and open competition. The largest recipient took 22% of these dollars in FY24–FY26.

  • Issuer & market+3.4estimated

    Across all agencies, NAICS 236210 saw 1,312 contracts worth $3.6B in FY24–FY26. No agency-specific history found. 14 other notices from this office in the past 12 months.

  • Time & stage+12.2measured

    Solicitation, bids due: 27 days to respond (due Dec 17, 2026, 4:00 PM CST).

  • Clarity & completeness+3.1estimated

    Documents not listed, named contact with email and phone, 406-word description.

  • Freshness+5.4measured

    Updated yesterday (scope change).

50 + contributions = 71 (B, Strong)

Score trend, last 30 daysScore history: 64, 63, 62, 71

Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 21, 2026.

Requirements & submission

Eligibility · Full and open competition

Full and open competition means the notice states no set-aside: any responsible business can respond, subject to the requirements in the notice.

Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.

From the official notice

Description

406 words

On November 19, 2026, Amendment No. 4 was issued to provide responses to questioins received from prospective offerors, Replace Exhibts G, L, and M with Revised Exhibits, provide informational documents, and add additional site visit dates. On Ocotber 30, 2026, Amendment No. 3 was issued to provide responses to questioins received from prospective offerors, provide as-built drawing and photos for reference only, extend thequestions due date to December 1, 2026, and to extend the proposal due date to December 17, 2026. On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment No. 1. On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits. This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Documents

No documents are listed for this notice.

Contacts

Points of contact as published on the notice.

Timeline & history

1 change since posting.

  1. Solicitation posted

  2. Solicitation posted

  3. Solicitation posted

  4. Solicitation posted

  5. Solicitation posted

  6. Description updated

  7. Responses dueNext · in 26 days

  8. Archive date on the official notice

Federal award history

Market context

All agencies · NAICS 236210 · FY24–FY26

Typical award (over $25K)
$188.7K
Contracts awarded
1,312
Total obligated
$3.6B
Award size, all agencies · NAICS 236210 contracts, FY24–FY26 (log scale)
P25 $25.6KMedian $99.5KP75 $382.4KP90 $1.7M

Largest recipients in this market

  • BECHTEL NATIONAL, INC.$786.7M22%
  • SEQIRUS INC$470.8M13%
  • SERCO INC$327.3M9%

Recipients of past awards in this market, not the incumbent of this RFP.

View as table
Fiscal yearObligated ($)
FY2022612,007,392.04
FY20231,106,971,355.86
FY20241,533,349,396.76
FY20251,177,804,059.53
FY2026926,999,952.23

Federal contract award records, award types A–D, FY24–FY26. Updated Nov 15, 2026.

Similar open RFPs

Same NAICS group or Construction & Renovation, nearby first, ranked by score.

Strong

550-20-121 Demo Old Boiler Plant B100 (CON)

Department of Veterans Affairs · Danville, IL

FederalSolicitationSDVOSB set-asideConstruction & Renovation+1
Posted Oct 21Due Dec 2, 2026, 1:00 PM CST (in 11 days)Federal notice
Strong

36C25227B0007 Remodel ENT Procedure Rooms CON 537-19-109

Department of Veterans Affairs · Chicago, IL

FederalPresolicitationSDVOSB set-asideConstruction & Renovation+1
Posted Nov 3Due Nov 24, 2026, 10:00 AM CST (in 3 days)Federal notice
Fair

Repair Building Systems (Peoria, IL)

Agricultural Research Service · Peoria, IL

FederalRFQSmall business set-asideConstruction & Renovation+1
Posted Oct 27Due Dec 2, 2026, 12:00 PM CST (in 11 days)Federal notice

RFP Detector Scores are informational.How we score →

More from Department of Energy

139 open RFPs from this issuer and its offices.

Limited

Dilo Gas Cart Training and Maintenance Services

Department of Energy

FederalSpecial noticeEducation & Training
Posted Nov 19Due Nov 23, 2026, 11:30 AM MST (in 2 days)Federal notice
Limited

Outdoor IR Dome Camera and Adapter

Department of Energy · Oak Ridge, TN

FederalCombined synopsisSupplies, Equipment & Furniture
Posted Nov 16Due Nov 23, 2026, 5:00 PM EST (in 2 days)Federal notice
Poor

Radio Detection Kit with Accessories - No Alternatives

Department of Energy · New York

FederalSolicitationSupplies, Equipment & Furniture
Posted Nov 4Due Nov 23, 2026, 5:00 PM EST (in 2 days)Federal notice
Limited

Mounting Pads

Department of Energy · Oak Ridge, TN

FederalSolicitationSupplies, Equipment & Furniture
Posted Sep 3Due Nov 24, 2026, 12:00 PM EST (in 3 days)Federal notice
Limited

ITRON Software Maintenance Renewal

Department of Energy

FederalSpecial noticeIT & Software
Posted Nov 17Due Nov 24, 2026, 12:00 PM CST (in 3 days)Federal notice
Poor

Poplar Williston Project

Department of Energy

FederalSolicitationSmall business set-asideSupplies, Equipment & Furniture+1
Posted Nov 10Due Nov 24, 2026, 11:30 AM MST (in 3 days)Federal notice

RFP Detector Scores are informational.How we score →

About this notice

Official federal notice. Updated Nov 19, 2026.

Official solicitation:Sign in free to open the official solicitation

RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.

RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.