Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA
Federal Aviation Administration · Paso Robles, CA
Why this score
Small-business set-aside, active buyer ($4B FY24–FY26).
Solicitation # J-2700First seen Nov 18, 2026 · confirm details on the official solicitationUpdated Nov 18, 2026Scored Nov 20, 2026
Dec 3
Dec 3, 2026, 2:00 PM PST
Summary by RFP Detector
The district is seeking an engineering firm to assess two aboveground steel water pipeline bridge crossings, one over railroad tracks in Solana Beach and one over a drainage area near Fairbanks Ranch. The work will judge whether the pipes, couplings and supports can withstand current seismic standards, estimate remaining service life, and recommend refurbishment or replacement. Required outputs include a preliminary design report with plans, specifications, permitting needs including environmental review, a construction schedule and a cost estimate. Proposals are judged on understanding of the project, approach and schedule, qualifications of key staff, clarity and compliance, and cost. Responses must be emailed as a marked electronic file before the stated deadline; faxed submissions are not accepted. Written questions are due ahead of the deadline and must use a specified subject line. A non-mandatory pre-proposal meeting is offered at the district office. Firms must acknowledge any addenda in their proposal, and amendments are distributed to firms that subscribe through the district website.
RFP Detector Score
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Starts at 50
No value published, and there isn't enough award history to estimate one. Scored as neutral.
The notice doesn't state eligibility restrictions. Scored as neutral.
0 other RFPs from Santa Fe Irrigation District and 85 Engineering & Architecture RFPs in California on RFP Detector in the past 12 months.
Solicitation, bids due: 14 days to respond (due Dec 3, 2026, 2:00 PM PST).
0 documents, named contact with email, 2,792-word description.
Updated yesterday.
50 + contributions = 55 (C, Fair)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Nov 20, 2026.
By email
We don’t reproduce this notice. Our summary and the extracted facts are above; the full text is on the official solicitation.
Sign in free to open the official solicitationDocuments are published with the official solicitation.
Hanna Dodd Gabin
PrimaryAs printed on the official solicitation.
Request for Proposals posted
Pre-bid meeting
Questions due
First seen by RFP Detector
Responses dueNext · in 12 days
Issuer & category on RFP Detector
Counts from RFP Detector’s own records. Federal award history doesn’t apply to this issuer.
Same NAICS group or Engineering & Architecture, nearby first, ranked by score.
Federal Aviation Administration · Paso Robles, CA
Why this score
Small-business set-aside, active buyer ($4B FY24–FY26).
Department of the Navy · San Diego, CA
Why this score
Active buyer ($68B FY24–FY26), new this week; but thin documentation.
Department of the Navy · Port Hueneme, CA
Why this score
Active buyer ($68B FY24–FY26), clear, complete notice.
Department of Veterans Affairs · Long Beach, CA
Why this score
Posted today, active buyer ($634M FY24–FY26); but small typical award (~$75K).
National Aeronautics and Space Administration · Moffett Field, CA
Why this score
Small-business set-aside, new this week; but thin documentation.
Department of the Air Force · Travis AFB, CA
Why this score
Small-business set-aside, new this week; but small typical award (~$141K).
RFP Detector Scores are informational.How we score →
Public notice, first seen Nov 18, 2026. Details extracted and summarised by RFP Detector; confirm them on the official solicitation.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.