Fix Legionella Deficiencies Construction 676-22-101
Department of Veterans Affairs · Tomah, WI
Why this score
SDVOSB set-aside, new this week; but small typical award (~$102K).
Solicitation # 140P5226R0006Updated May 11, 2026
This RFP closed on May 13, 2026.
May 13, 2026
Responses were due May 13, 2026, 2:00 PM CDT
Same NAICS group or Construction & Renovation, nearby first, ranked by score.
Department of Veterans Affairs · Tomah, WI
Why this score
SDVOSB set-aside, new this week; but small typical award (~$102K).
Department of Veterans Affairs · Houston, TX
Why this score
SDVOSB set-aside, 26 days to respond; but small typical award (~$102K).
Federal Prison System / Bureau of Prisons · Allenwood, PA
Why this score
27 days to respond, small-business set-aside; but small typical award (~$111K).
Department of Veterans Affairs
Why this score
SDVOSB set-aside, 52 days to respond; but small typical award (~$102K).
Department of Veterans Affairs · Murfreesboro, TN
Why this score
SDVOSB set-aside, 18 days to respond; but small typical award (~$124K).
Department of Veterans Affairs · East Orange, NJ
Why this score
SDVOSB set-aside, 44 days to respond; but small typical award (~$102K).
RFP Detector Scores are informational.How we score →
Summary by RFP Detector
National Park Service (SER WEST(52000)), part of the Department of the Interior, posted a combined synopsis/solicitation titled “Replace Melrose Backup Generator” under solicitation number 140P5226R0006. It was first posted on Apr 28, 2026 and has been updated 2 times since. The response deadline was May 13, 2026, 2:00 PM CDT. It is classified under NAICS 238290 (Other Building Equipment Contractors) and product/service code 6115. The set-aside is listed as Small Business Set Aside - Total. The listed point of contact is Clark, Tara.
Score at publication
Every RFP starts at 50. Each factor adds or subtracts points compared with a typical RFP; unknown data counts as neutral.
Frozen at publication: closed RFPs are not re-scored.
Starts at 50
No value published. Typical award is about $77K: the median of 83 National Park Service contracts over $25K awarded in NAICS 238290, FY24–FY26.
Total small-business set-aside. The largest recipient took 27% of these dollars in FY24–FY26.
National Park Service obligated $26M on NAICS 238290 across 178 contracts in FY24–FY26. 13 other notices from this office in the past 12 months.
Solicitation, bids due: 15 days to respond (due May 13, 2026, 2:00 PM CDT).
Documents not listed, named contact with email and phone, 593-word description.
Posted today.
50 + contributions = 65 (B, Strong)
Informational, not advice to bid or not bid. Score version 1.0.0, evaluated Apr 28, 2026.
Eligibility · Small Business Set Aside - Total
Small-business set-asides reserve a contract, or part of it, for businesses that meet the size standard for the NAICS code on the notice. "Total" set-asides restrict the whole requirement; "partial" set-asides restrict part of it.
Not stated in a form we could extract. See the official solicitation for requirements, evaluation criteria and submission steps.
From the official notice
Amendment 0002: Extend Bid due date to May 13,2026 2:00 PM CT. 1. Consider a quote for materials only. No. The Government will not consider a materials-only quote for this requirement. The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation. Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation. All other terms and conditions of the solicitation and Statement of Work remain unchanged. 2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate. The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time. The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment. Replacement of the roof/cover structure is not included in the current scope. The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price. 3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch? Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work. The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment. The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work. 4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind. The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval. Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples. The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.
No documents are listed for this notice.
Clark, Tara
PrimaryPoints of contact as published on the notice.
Combined Synopsis/Solicitation posted
Combined Synopsis/Solicitation posted
Combined Synopsis/Solicitation posted
Responses were due
Federal award history
Department of the Interior · NAICS 238290 · FY24–FY26
Recipients of past awards in this market, not the incumbent of this RFP.
| Fiscal year | Obligated ($) |
|---|---|
| FY2022 | 6,536,422.51 |
| FY2023 | 8,144,380.78 |
| FY2024 | 8,668,592.02 |
| FY2025 | 6,692,904.3 |
| FY2026 | 10,661,627.19 |
Federal contract award records, award types A–D, FY24–FY26. Updated Nov 14, 2026.
17 open RFPs from this issuer and its offices.
National Park Service
Why this score
Small-business set-aside, 10 days to respond; but thin documentation.
National Park Service · Miami, FL
Why this score
11 days to respond, clear, complete notice; but small typical award (~$64K).
National Park Service · Grand Canyon, AZ
Why this score
28 days to respond; but small typical award (~$79K).
National Park Service · Boulder City, NV
Why this score
31 days to respond, clear, complete notice; but posted 79 days ago.
National Park Service · Gustavus, AK
Why this score
38 days to respond, clear, complete notice; but small typical award (~$64K).
National Park Service · Mill Valley, CA
Why this score
40 days to respond; but updated 66 days ago.
RFP Detector Scores are informational.How we score →
Official federal notice. Updated May 11, 2026.
Official solicitation:Sign in free to open the official solicitation
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.
RFP Detector is not affiliated with the organization that issued this RFP. Always rely on the official notice and confirm every date and requirement with the issuer.