BState contracts since 2008Updated Nov 13, 2026
Kenstar Construction Corp holds 26 contracts worth $17.5M with 2 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2008.
- Total contract value
- $17.5M
- Current contract amounts
- Spent to date
- $16.4M
- 94% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 26
- Since 2008
- Agencies served
- 2
- Most with Office of General Services - Design & Construction
- Years active
- 18
- First contract 2008
Contact & company
Business information and how to reach the company.
Contracts
26 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
Rehabilitate Showers, 5th and 6th floors @ Queensboro CF D44126CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44126C | Jan 17, 2014to Mar 15, 2016 | Jan 17, 2014 | Mar 15, 2016 | $617,044$617,001 spent | $617,001 | |
Restore sandy storm flood damage building 902 pilgrim PC DEC331CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC331C | Jul 17, 2013to Apr 30, 2015 | Jul 17, 2013 | Apr 30, 2015 | $412,923$403,773 spent | $403,773 | |
Replace security grills and gates and mesh obs cells BLDG 8 sing sing correctional facility DEC310CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC310C | May 24, 2013to Aug 1, 2014 | May 24, 2013 | Aug 1, 2014 | $289,416$273,416 spent | $273,416 | |
Replace front back grills gates mesh cells to meet DOCCS standards sing sing CF westchester county DEC309CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC309C | May 24, 2013to Aug 31, 2014 | May 24, 2013 | Aug 31, 2014 | $122,696$120,491 spent | $120,491 | |
Repair failed covered walkway BLDG 73 creedmoor PC DEC295CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC295C | Apr 18, 2013to Dec 15, 2013 | Apr 18, 2013 | Dec 15, 2013 | $300,000$276,305 spent | $276,305 | |
Restore hazardous fire exit stairs building 19 kingsboro correctional facility brooklyn NY DEC297CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC297C | Apr 9, 2013to Feb 12, 2014 | Apr 9, 2013 | Feb 12, 2014 | $120,000$112,411 spent | $112,411 | |
Repair hurricane sandy fencing damage long island state parks DEC236LConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC236L | Feb 8, 2013to Oct 31, 2013 | Feb 8, 2013 | Oct 31, 2013 | $400,000$279,241 spent | $279,241 | |
Provide cleanup & restore fencing sing sing CF DEC093CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC093C | Oct 31, 2012to Nov 13, 2013 | Oct 31, 2012 | Nov 13, 2013 | $375,000$348,878 spent | $348,878 | |
Restore flood damage building 902 pilgrim PC DEC083CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEC083C | Oct 31, 2012to May 31, 2013 | Oct 31, 2012 | May 31, 2013 | $125,000$112,566 spent | $112,566 | |
Restore smoke and fire damage perry duryea sob DEB965CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB965C | Jun 22, 2012to Oct 20, 2012 | Jun 22, 2012 | Oct 20, 2012 | $300,000$293,690 spent | $293,690 | |
Investigate & repair failed portion of the concrete roof deck at edgecombe CF DEB915CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB915C | Apr 26, 2012to Aug 24, 2012 | Apr 26, 2012 | Aug 24, 2012 | $100,000$32,278 spent | $32,278 | |
Correct accreditation deficiency ward 400 BLDG 2 south beach PC DEB882CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB882C | Apr 13, 2012to Oct 2, 2012 | Apr 13, 2012 | Oct 2, 2012 | $219,201$219,201 spent | $219,201 | |
Restore fire damaged areas to building 71 bernard fineson ddso DEB902CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB902C | Apr 12, 2012to Aug 10, 2012 | Apr 12, 2012 | Aug 10, 2012 | $300,000$133,011 spent | $133,011 | |
Remove/replc pick roof caulk & paint cells b#21-2 fishkill CF DEB851CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB851C | Feb 15, 2012to Jun 14, 2012 | Feb 15, 2012 | Jun 14, 2012 | $100,000$34,246 spent | $34,246 | |
Remove/replace pick proof caulk obs cells BLDG 4 sullivan CF DEB818CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB818C | Jan 17, 2012to May 16, 2012 | Jan 17, 2012 | May 16, 2012 | $75,000$54,681 spent | $54,681 | |
Repair multiple breaks water main line south beach PC DEB712CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB712C | Sep 30, 2011to Jan 28, 2012 | Sep 30, 2011 | Jan 28, 2012 | $75,000$44,947 spent | $44,947 | |
Install protective scaffolding facade hazard lexington avenue armory DEB601CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DEB601C | Aug 3, 2011to Jan 29, 2013 | Aug 3, 2011 | Jan 29, 2013 | $125,000$81,064 spent | $81,064 | |
Rehab kingsboro addiction center - kingsboro atc D44049CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44049C | May 3, 2011to Jun 22, 2016 | May 3, 2011 | Jun 22, 2016 | $5,450,757$5,394,546 spent | $5,394,546 | |
Sucf 13D10 earth and space sciences BLDG envelope rehab SUNY stonybrook T005802Contract not subject to state pre-audit | State University Construction Fund | Contract not subject to state pre-auditNot pre-audited | T005802 | Mar 29, 2011to Dec 13, 2015 | Mar 29, 2011 | Dec 13, 2015 | $4,298,001$4,051,002 spent | $4,051,002 | |
Rehab lab areas BLDG 39 nathan kline ri DQ1252CConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DQ1252C | Jan 14, 2011to May 15, 2014 | Jan 14, 2011 | May 15, 2014 | $1,358,466$1,278,161 spent | $1,278,161 |
Rehabilitate Showers, 5th and 6th floors @ Queensboro CFOffice of General Services - Design & ConstructionJan 17, 2014 – Mar 15, 2016$617,044
- Description
- Rehabilitate Showers, 5th and 6th floors @ Queensboro CF
- Contract number
- D44126C
- Type
- Construction: BuildingConstruction
- Term
- Jan 17, 2014 → Mar 15, 20162.2 years
- Approved
- Jan 17, 2014
- Status
- Ended
- Amount
- $617,044
- Spent to date
- $617,001 · 100% of the amount
Restore sandy storm flood damage building 902 pilgrim PCOffice of General Services - Design & ConstructionJul 17, 2013 – Apr 30, 2015$412,923
- Description
- Restore sandy storm flood damage building 902 pilgrim PC
- Contract number
- DEC331C
- Type
- Construction: BuildingConstruction
- Term
- Jul 17, 2013 → Apr 30, 20151.8 years
- Approved
- Aug 2, 2013
- Status
- Ended
- Amount
- $412,923
- Spent to date
- $403,773 · 98% of the amount
Replace security grills and gates and mesh obs cells BLDG 8 sing sing correctional facilityOffice of General Services - Design & ConstructionMay 24, 2013 – Aug 1, 2014$289,416
- Description
- Replace security grills and gates and mesh obs cells BLDG 8 sing sing correctional facility
- Contract number
- DEC310C
- Type
- Construction: BuildingConstruction
- Term
- May 24, 2013 → Aug 1, 201414 months
- Approved
- Jun 24, 2013
- Status
- Ended
- Amount
- $289,416
- Spent to date
- $273,416 · 94% of the amount
Replace front back grills gates mesh cells to meet DOCCS standards sing sing CF westchester countyOffice of General Services - Design & ConstructionMay 24, 2013 – Aug 31, 2014$122,696
- Description
- Replace front back grills gates mesh cells to meet DOCCS standards sing sing CF westchester county
- Contract number
- DEC309C
- Type
- Construction: BuildingConstruction
- Term
- May 24, 2013 → Aug 31, 201415 months
- Approved
- Jun 12, 2013
- Status
- Ended
- Amount
- $122,696
- Spent to date
- $120,491 · 98% of the amount
Repair failed covered walkway BLDG 73 creedmoor PCOffice of General Services - Design & ConstructionApr 18, 2013 – Dec 15, 2013$300,000
- Description
- Repair failed covered walkway BLDG 73 creedmoor PC
- Contract number
- DEC295C
- Type
- Construction: BuildingConstruction
- Term
- Apr 18, 2013 → Dec 15, 20138 months
- Approved
- May 8, 2013
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $276,305 · 92% of the amount
Restore hazardous fire exit stairs building 19 kingsboro correctional facility brooklyn NYOffice of General Services - Design & ConstructionApr 9, 2013 – Feb 12, 2014$120,000
- Description
- Restore hazardous fire exit stairs building 19 kingsboro correctional facility brooklyn NY
- Contract number
- DEC297C
- Type
- Construction: BuildingConstruction
- Term
- Apr 9, 2013 → Feb 12, 201410 months
- Approved
- May 28, 2013
- Status
- Ended
- Amount
- $120,000
- Spent to date
- $112,411 · 94% of the amount
Repair hurricane sandy fencing damage long island state parksOffice of General Services - Design & ConstructionFeb 8, 2013 – Oct 31, 2013$400,000
- Description
- Repair hurricane sandy fencing damage long island state parks
- Contract number
- DEC236L
- Type
- Construction: BuildingConstruction
- Term
- Feb 8, 2013 → Oct 31, 20139 months
- Approved
- Mar 6, 2013
- Status
- Ended
- Amount
- $400,000
- Spent to date
- $279,241 · 70% of the amount
Provide cleanup & restore fencing sing sing CFOffice of General Services - Design & ConstructionOct 31, 2012 – Nov 13, 2013$375,000
- Description
- Provide cleanup & restore fencing sing sing CF
- Contract number
- DEC093C
- Type
- Construction: BuildingConstruction
- Term
- Oct 31, 2012 → Nov 13, 201312 months
- Approved
- Dec 4, 2012
- Status
- Ended
- Amount
- $375,000
- Spent to date
- $348,878 · 93% of the amount
Restore flood damage building 902 pilgrim PCOffice of General Services - Design & ConstructionOct 31, 2012 – May 31, 2013$125,000
- Description
- Restore flood damage building 902 pilgrim PC
- Contract number
- DEC083C
- Type
- Construction: BuildingConstruction
- Term
- Oct 31, 2012 → May 31, 20137 months
- Approved
- Nov 20, 2012
- Status
- Ended
- Amount
- $125,000
- Spent to date
- $112,566 · 90% of the amount
Restore smoke and fire damage perry duryea sobOffice of General Services - Design & ConstructionJun 22, 2012 – Oct 20, 2012$300,000
- Description
- Restore smoke and fire damage perry duryea sob
- Contract number
- DEB965C
- Type
- Construction: BuildingConstruction
- Term
- Jun 22, 2012 → Oct 20, 20124 months
- Approved
- Jul 27, 2012
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $293,690 · 98% of the amount
Investigate & repair failed portion of the concrete roof deck at edgecombe CFOffice of General Services - Design & ConstructionApr 26, 2012 – Aug 24, 2012$100,000
- Description
- Investigate & repair failed portion of the concrete roof deck at edgecombe CF
- Contract number
- DEB915C
- Type
- Construction: BuildingConstruction
- Term
- Apr 26, 2012 → Aug 24, 20124 months
- Approved
- May 17, 2012
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $32,278 · 32% of the amount
Correct accreditation deficiency ward 400 BLDG 2 south beach PCOffice of General Services - Design & ConstructionApr 13, 2012 – Oct 2, 2012$219,201
- Description
- Correct accreditation deficiency ward 400 BLDG 2 south beach PC
- Contract number
- DEB882C
- Type
- Construction: BuildingConstruction
- Term
- Apr 13, 2012 → Oct 2, 20126 months
- Approved
- Jun 20, 2012
- Status
- Ended
- Amount
- $219,201
- Spent to date
- $219,201 · 100% of the amount
Restore fire damaged areas to building 71 bernard fineson ddsoOffice of General Services - Design & ConstructionApr 12, 2012 – Aug 10, 2012$300,000
- Description
- Restore fire damaged areas to building 71 bernard fineson ddso
- Contract number
- DEB902C
- Type
- Construction: BuildingConstruction
- Term
- Apr 12, 2012 → Aug 10, 20124 months
- Approved
- Jun 7, 2012
- Status
- Ended
- Amount
- $300,000
- Spent to date
- $133,011 · 44% of the amount
Remove/replc pick roof caulk & paint cells b#21-2 fishkill CFOffice of General Services - Design & ConstructionFeb 15, 2012 – Jun 14, 2012$100,000
- Description
- Remove/replc pick roof caulk & paint cells b#21-2 fishkill CF
- Contract number
- DEB851C
- Type
- Construction: BuildingConstruction
- Term
- Feb 15, 2012 → Jun 14, 20124 months
- Approved
- Mar 9, 2012
- Status
- Ended
- Amount
- $100,000
- Spent to date
- $34,246 · 34% of the amount
Remove/replace pick proof caulk obs cells BLDG 4 sullivan CFOffice of General Services - Design & ConstructionJan 17, 2012 – May 16, 2012$75,000
- Description
- Remove/replace pick proof caulk obs cells BLDG 4 sullivan CF
- Contract number
- DEB818C
- Type
- Construction: BuildingConstruction
- Term
- Jan 17, 2012 → May 16, 20124 months
- Approved
- Feb 17, 2012
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $54,681 · 73% of the amount
Repair multiple breaks water main line south beach PCOffice of General Services - Design & ConstructionSep 30, 2011 – Jan 28, 2012$75,000
- Description
- Repair multiple breaks water main line south beach PC
- Contract number
- DEB712C
- Type
- Construction: BuildingConstruction
- Term
- Sep 30, 2011 → Jan 28, 20124 months
- Approved
- Nov 28, 2011
- Status
- Ended
- Amount
- $75,000
- Spent to date
- $44,947 · 60% of the amount
Install protective scaffolding facade hazard lexington avenue armoryOffice of General Services - Design & ConstructionAug 3, 2011 – Jan 29, 2013$125,000
- Description
- Install protective scaffolding facade hazard lexington avenue armory
- Contract number
- DEB601C
- Type
- Construction: BuildingConstruction
- Term
- Aug 3, 2011 → Jan 29, 20131.5 years
- Approved
- Aug 30, 2011
- Status
- Ended
- Amount
- $125,000
- Spent to date
- $81,064 · 65% of the amount
Rehab kingsboro addiction center - kingsboro atcOffice of General Services - Design & ConstructionMay 3, 2011 – Jun 22, 2016$5,450,757
- Description
- Rehab kingsboro addiction center - kingsboro atc
- Contract number
- D44049C
- Type
- Construction: BuildingConstruction
- Term
- May 3, 2011 → Jun 22, 20165.2 years
- Approved
- May 3, 2011
- Status
- Ended
- Amount
- $5,450,757
- Spent to date
- $5,394,546 · 99% of the amount
Sucf 13D10 earth and space sciences BLDG envelope rehab SUNY stonybrookState University Construction FundMar 29, 2011 – Dec 13, 2015$4,298,001
- Description
- Sucf 13D10 earth and space sciences BLDG envelope rehab SUNY stonybrook
- Contract number
- T005802
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 29, 2011 → Dec 13, 20154.8 years
- Approved
- May 4, 2011
- Status
- Ended
- Amount
- $4,298,001
- Spent to date
- $4,051,002 · 94% of the amount
Rehab lab areas BLDG 39 nathan kline riOffice of General Services - Design & ConstructionJan 14, 2011 – May 15, 2014$1,358,466
- Description
- Rehab lab areas BLDG 39 nathan kline ri
- Contract number
- DQ1252C
- Type
- Construction: BuildingConstruction
- Term
- Jan 14, 2011 → May 15, 20143.3 years
- Approved
- Jan 14, 2011
- Status
- Ended
- Amount
- $1,358,466
- Spent to date
- $1,278,161 · 94% of the amount
Contract-type mix
Share of contract value by type
- Construction: Building25 contracts$13.2M
- Contract not subject to state pre-audit1 contract$4.3M
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2008: 1 contracts, $515.5K | 1 |
| 2009: 3 contracts, $1.5M | 3 |
| 2010: 2 contracts, $375.0K | 2 |
| 2011: 5 contracts, $11.3M | 5 |
| 2012: 8 contracts, $1.6M | 8 |
| 2013: 6 contracts, $1.6M | 6 |
| 2014: 1 contracts, $617.0K | 1 |
| 2015: 0 contracts, $0.0 | 0 |
| 2016: 0 contracts, $0.0 | 0 |
| 2017: 0 contracts, $0.0 | 0 |
| 2018: 0 contracts, $0.0 | 0 |
| 2019: 0 contracts, $0.0 | 0 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 0 contracts, $0.0 | 0 |
| 2022: 0 contracts, $0.0 | 0 |
| 2023: 0 contracts, $0.0 | 0 |
| 2024: 0 contracts, $0.0 | 0 |
| 2025: 0 contracts, $0.0 | 0 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 68/100): $18M in contracts, works with 2 agencies; but no contract since 2014.
- Contract volume+12.1measured
$18M in current contract value across 26 contracts, more than 89% of scored contractors.
- Recent activity−4.4measured
No active contracts today; the most recent was approved in January 2014.
- Agency breadth+4.3measured
Contracts with 2 different state agencies and facilities.
- Experience+2.0measured
First contract started in August 2008 (18 years of contract history).
- Contract-type mix+3.9measured
2 contract types; the largest group is construction (76% of value). Goods and services contracts are 76% of the total.
- Spending vs. value0.0measured
On 26 completed contracts with spending recorded, spending is 94% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 68 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Aventus NV, Inc.
Construction & Renovation
Since 20243 agencies
- Contract value
- $17.7M
- Contracts
- 7
- Active
- 4
- B
General Roofing Contractors LLC
Construction & Renovation
Since 20158 agencies
- Contract value
- $17.2M
- Contracts
- 21
- Active
- 0
- A
DC Building Systems Inc
Watertown, NYConstruction & Renovation
Since 20134 agencies
- Contract value
- $18.2M
- Contracts
- 8
- Active
- 3
- A
Landry Mechanical Contractors
Construction & Renovation
Since 20097 agencies
- Contract value
- $16.5M
- Contracts
- 27
- Active
- 0
- A
Sicoli Construction Services Inc
Construction & Renovation
Since 20084 agencies
- Contract value
- $18.7M
- Contracts
- 14
- Active
- 1
- B
Eastern Building & Restoration Inc
Construction & Renovation
Since 20074 agencies
- Contract value
- $19.1M
- Contracts
- 24
- Active
- 0
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- State University Construction Fund contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.