Tri-Valley Plumbing & Heating Inc
BState contracts since 2009Updated Nov 13, 2026
Tri-Valley Plumbing & Heating Inc holds 30 contracts worth $3.8M with 4 New York State agencies, most with Office of General Services - Design & Construction; none active today. The first started in 2009.
- Total contract value
- $3.8M
- Current contract amounts
- Spent to date
- $3.5M
- 93% of contract value
- Active contracts
- 0
- None active today
- Contracts on record
- 30
- Since 2009
- Agencies served
- 4
- Most with Office of General Services - Design & Construction
- Years active
- 17
- First contract 2009
Contact & company
Business information and how to reach the company.
Contracts
30 contracts with New York State agencies, active first. Open a row for the full record.
| Details | Contract | Type | Contract no. | Term | |||||
|---|---|---|---|---|---|---|---|---|---|
HVAC Install backup generator Administration Building at Saratoga Spa State Park Saratoga County D006256Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006256 | Feb 19, 2025to Feb 19, 2026 | Feb 19, 2025 | Feb 19, 2026 | $51,000$48,942 spent | $48,942 | |
PC Lincoln Bathhouse office rehabilitation at Saratoga Spa State Park in Saratoga County D006350Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D006350 | Jan 17, 2025to May 17, 2025 | Jan 17, 2025 | May 17, 2025 | $48,400$46,964 spent | $46,964 | |
Provide garage addition DOT Region 2 Hamilton County D46180PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46180P | Aug 6, 2024to Aug 21, 2026 | Aug 6, 2024 | Aug 21, 2026 | $227,921$226,203 spent | $226,203 | |
Renovate 41st Floor Corning Tower Empire State Plaza Albany County D45957PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45957P | Jun 16, 2023to Mar 24, 2025 | Jun 16, 2023 | Mar 24, 2025 | $403,792$400,357 spent | $400,357 | |
Plumbing work for emergency generator provision Bldg 18 1220 Washington Ave Albany County D45976PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45976P | Sep 1, 2022to Dec 26, 2024 | Sep 1, 2022 | Dec 26, 2024 | $94,943$92,916 spent | $92,916 | |
Rehabilitate office & building entrance DMNA Headquarters plumbing Albany County D46227PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46227P | Aug 8, 2022to Jan 9, 2024 | Aug 8, 2022 | Jan 9, 2024 | $82,704$82,385 spent | $82,385 | |
Provide Sub-headquarters & Loader Storage Building #4 DOT Region 8 Valatie Columbia County D46040PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46040P | May 27, 2022to Mar 16, 2024 | May 27, 2022 | Mar 16, 2024 | $43,995$9,423 spent | $9,423 | |
Provide Sub-headquarters & Loader Storage Building #4 DOT Region 8 Valatie Columbia County D46040HConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D46040H | May 27, 2022to Mar 16, 2024 | May 27, 2022 | Mar 16, 2024 | $9,500$9,153 spent | $9,153 | |
Provide training academy firing range & training building Coxsackie CF Greene County D45248PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45248P | Mar 18, 2022to Apr 29, 2024 | Mar 18, 2022 | Apr 29, 2024 | $231,729$219,715 spent | $219,715 | |
MineKill BH rehab 4 trade w T T005907Contract not subject to state pre-audit | Office of Parks Recreation & Historic Preservation | Contract not subject to state pre-auditNot pre-audited | T005907 | Mar 16, 2022to Apr 28, 2023 | Mar 16, 2022 | Apr 28, 2023 | $17,200$16,575 spent | $16,575 | |
Provide training academy firing range & training building Coxsackie CF Greene County D45248PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D45248P | Nov 9, 2021to Nov 10, 2021 | Nov 9, 2021 | Nov 10, 2021 | $206,900$0 spent | $0 | |
Rehabilitate various cottage bathrooms Hudson CF Columbia County DM3096PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | DM3096P | Nov 5, 2021to Nov 26, 2023 | Nov 5, 2021 | Nov 26, 2023 | $215,500$215,500 spent | $215,500 | |
North Campground Shower House & C-Station Taconic State Park Copake Falls Columbia County (P) D005536Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005536 | Dec 16, 2019to Feb 13, 2021 | Dec 16, 2019 | Feb 13, 2021 | $243,172$242,580 spent | $242,580 | |
Rehabilitate Concession Stand Beach Bathhouse Moreau Lake State Park (P) D005409Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005409 | Mar 13, 2019to Dec 27, 2019 | Mar 13, 2019 | Dec 27, 2019 | $74,627$74,627 spent | $74,627 | |
Comfort Station Replacement Max V Shaul State Park Schoharie County (P) D005304Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D005304 | Feb 1, 2018to May 3, 2019 | Feb 1, 2018 | May 3, 2019 | $148,100$148,100 spent | $148,100 | |
Park Office Addition at Minekill State Park Schoharie County (P) D004982Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D004982 | Aug 23, 2017to Jun 18, 2018 | Aug 23, 2017 | Jun 18, 2018 | $62,200$62,017 spent | $62,017 | |
Park Office Addition at Minekill State Park Schoharie County (M) D004981Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D004981 | Aug 23, 2017to Jun 18, 2018 | Aug 23, 2017 | Jun 18, 2018 | $39,900$39,728 spent | $39,728 | |
Project SA-SX 2015-01 Visitors Center Rehab Schoharie Crossing Montgomery County(P) D004920Construction: Building | Office of Parks Recreation & Historic Preservation | Construction: BuildingConstruction | D004920 | Dec 21, 2016to Jun 19, 2017 | Dec 21, 2016 | Jun 19, 2017 | $47,811$47,591 spent | $47,591 | |
Provide plumbing materials and T000591Contract not subject to state pre-audit | College of Agriculture and Technology at Cobleskill | Contract not subject to state pre-auditNot pre-audited | T000591 | Dec 17, 2016to Jan 31, 2017 | Dec 17, 2016 | Jan 31, 2017 | $56,775$56,775 spent | $56,775 | |
Renovate medical clinic, brookwood SC, columbia county D44810PConstruction: Building | Office of General Services - Design & Construction | Construction: BuildingConstruction | D44810P | Sep 15, 2016to Nov 11, 2017 | Sep 15, 2016 | Nov 11, 2017 | $111,800$111,746 spent | $111,746 |
HVAC Install backup generator Administration Building at Saratoga Spa State Park Saratoga CountyOffice of Parks Recreation & Historic PreservationFeb 19, 2025 – Feb 19, 2026$51,000
- Description
- HVAC Install backup generator Administration Building at Saratoga Spa State Park Saratoga County
- Contract number
- D006256
- Type
- Construction: BuildingConstruction
- Term
- Feb 19, 2025 → Feb 19, 202612 months
- Approved
- Feb 19, 2025
- Status
- Ended
- Amount
- $51,000
- Spent to date
- $48,942 · 96% of the amount
PC Lincoln Bathhouse office rehabilitation at Saratoga Spa State Park in Saratoga CountyOffice of Parks Recreation & Historic PreservationJan 17, 2025 – May 17, 2025$48,400
- Description
- PC Lincoln Bathhouse office rehabilitation at Saratoga Spa State Park in Saratoga County
- Contract number
- D006350
- Type
- Construction: BuildingConstruction
- Term
- Jan 17, 2025 → May 17, 20254 months
- Approved
- Jan 17, 2025
- Status
- Ended
- Amount
- $48,400
- Spent to date
- $46,964 · 97% of the amount
Provide garage addition DOT Region 2 Hamilton CountyOffice of General Services - Design & ConstructionAug 6, 2024 – Aug 21, 2026$227,921
- Description
- Provide garage addition DOT Region 2 Hamilton County
- Contract number
- D46180P
- Type
- Construction: BuildingConstruction
- Term
- Aug 6, 2024 → Aug 21, 20262 years
- Approved
- Aug 6, 2024
- Status
- Ended
- Amount
- $227,921
- Spent to date
- $226,203 · 99% of the amount
Renovate 41st Floor Corning Tower Empire State Plaza Albany CountyOffice of General Services - Design & ConstructionJun 16, 2023 – Mar 24, 2025$403,792
- Description
- Renovate 41st Floor Corning Tower Empire State Plaza Albany County
- Contract number
- D45957P
- Type
- Construction: BuildingConstruction
- Term
- Jun 16, 2023 → Mar 24, 20251.8 years
- Approved
- Jun 16, 2023
- Status
- Ended
- Amount
- $403,792
- Spent to date
- $400,357 · 99% of the amount
Plumbing work for emergency generator provision Bldg 18 1220 Washington Ave Albany CountyOffice of General Services - Design & ConstructionSep 1, 2022 – Dec 26, 2024$94,943
- Description
- Plumbing work for emergency generator provision Bldg 18 1220 Washington Ave Albany County
- Contract number
- D45976P
- Type
- Construction: BuildingConstruction
- Term
- Sep 1, 2022 → Dec 26, 20242.3 years
- Approved
- Sep 1, 2022
- Status
- Ended
- Amount
- $94,943
- Spent to date
- $92,916 · 98% of the amount
Rehabilitate office & building entrance DMNA Headquarters plumbing Albany CountyOffice of General Services - Design & ConstructionAug 8, 2022 – Jan 9, 2024$82,704
- Description
- Rehabilitate office & building entrance DMNA Headquarters plumbing Albany County
- Contract number
- D46227P
- Type
- Construction: BuildingConstruction
- Term
- Aug 8, 2022 → Jan 9, 202417 months
- Approved
- Aug 8, 2022
- Status
- Ended
- Amount
- $82,704
- Spent to date
- $82,385 · 100% of the amount
Provide Sub-headquarters & Loader Storage Building #4 DOT Region 8 Valatie Columbia CountyOffice of General Services - Design & ConstructionMay 27, 2022 – Mar 16, 2024$43,995
- Description
- Provide Sub-headquarters & Loader Storage Building #4 DOT Region 8 Valatie Columbia County
- Contract number
- D46040P
- Type
- Construction: BuildingConstruction
- Term
- May 27, 2022 → Mar 16, 20241.8 years
- Approved
- May 27, 2022
- Status
- Ended
- Amount
- $43,995
- Spent to date
- $9,423 · 21% of the amount
Provide Sub-headquarters & Loader Storage Building #4 DOT Region 8 Valatie Columbia CountyOffice of General Services - Design & ConstructionMay 27, 2022 – Mar 16, 2024$9,500
- Description
- Provide Sub-headquarters & Loader Storage Building #4 DOT Region 8 Valatie Columbia County
- Contract number
- D46040H
- Type
- Construction: BuildingConstruction
- Term
- May 27, 2022 → Mar 16, 20241.8 years
- Approved
- May 27, 2022
- Status
- Ended
- Amount
- $9,500
- Spent to date
- $9,153 · 96% of the amount
Provide training academy firing range & training building Coxsackie CF Greene CountyOffice of General Services - Design & ConstructionMar 18, 2022 – Apr 29, 2024$231,729
- Description
- Provide training academy firing range & training building Coxsackie CF Greene County
- Contract number
- D45248P
- Type
- Construction: BuildingConstruction
- Term
- Mar 18, 2022 → Apr 29, 20242.1 years
- Approved
- Mar 18, 2022
- Status
- Ended
- Amount
- $231,729
- Spent to date
- $219,715 · 95% of the amount
MineKill BH rehab 4 trade w TOffice of Parks Recreation & Historic PreservationMar 16, 2022 – Apr 28, 2023$17,200
- Description
- MineKill BH rehab 4 trade w T
- Contract number
- T005907
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Mar 16, 2022 → Apr 28, 202313 months
- Approved
- Mar 16, 2022
- Status
- Ended
- Amount
- $17,200
- Spent to date
- $16,575 · 96% of the amount
Provide training academy firing range & training building Coxsackie CF Greene CountyOffice of General Services - Design & ConstructionNov 9, 2021 – Nov 10, 2021$206,900
- Description
- Provide training academy firing range & training building Coxsackie CF Greene County
- Contract number
- D45248P
- Type
- Construction: BuildingConstruction
- Term
- Nov 9, 2021 → Nov 10, 2021
- Approved
- Nov 9, 2021
- Status
- Ended
- Amount
- $206,900
- Spent to date
- $0 · 0% of the amount
Rehabilitate various cottage bathrooms Hudson CF Columbia CountyOffice of General Services - Design & ConstructionNov 5, 2021 – Nov 26, 2023$215,500
- Description
- Rehabilitate various cottage bathrooms Hudson CF Columbia County
- Contract number
- DM3096P
- Type
- Construction: BuildingConstruction
- Term
- Nov 5, 2021 → Nov 26, 20232.1 years
- Approved
- Nov 8, 2021
- Status
- Ended
- Amount
- $215,500
- Spent to date
- $215,500 · 100% of the amount
North Campground Shower House & C-Station Taconic State Park Copake Falls Columbia County (P)Office of Parks Recreation & Historic PreservationDec 16, 2019 – Feb 13, 2021$243,172
- Description
- North Campground Shower House & C-Station Taconic State Park Copake Falls Columbia County (P)
- Contract number
- D005536
- Type
- Construction: BuildingConstruction
- Term
- Dec 16, 2019 → Feb 13, 202114 months
- Approved
- Dec 16, 2019
- Status
- Ended
- Amount
- $243,172
- Spent to date
- $242,580 · 100% of the amount
Rehabilitate Concession Stand Beach Bathhouse Moreau Lake State Park (P)Office of Parks Recreation & Historic PreservationMar 13, 2019 – Dec 27, 2019$74,627
- Description
- Rehabilitate Concession Stand Beach Bathhouse Moreau Lake State Park (P)
- Contract number
- D005409
- Type
- Construction: BuildingConstruction
- Term
- Mar 13, 2019 → Dec 27, 20199 months
- Approved
- Mar 13, 2019
- Status
- Ended
- Amount
- $74,627
- Spent to date
- $74,627 · 100% of the amount
Comfort Station Replacement Max V Shaul State Park Schoharie County (P)Office of Parks Recreation & Historic PreservationFeb 1, 2018 – May 3, 2019$148,100
- Description
- Comfort Station Replacement Max V Shaul State Park Schoharie County (P)
- Contract number
- D005304
- Type
- Construction: BuildingConstruction
- Term
- Feb 1, 2018 → May 3, 201915 months
- Approved
- Feb 1, 2018
- Status
- Ended
- Amount
- $148,100
- Spent to date
- $148,100 · 100% of the amount
Park Office Addition at Minekill State Park Schoharie County (P)Office of Parks Recreation & Historic PreservationAug 23, 2017 – Jun 18, 2018$62,200
- Description
- Park Office Addition at Minekill State Park Schoharie County (P)
- Contract number
- D004982
- Type
- Construction: BuildingConstruction
- Term
- Aug 23, 2017 → Jun 18, 201810 months
- Approved
- Aug 23, 2017
- Status
- Ended
- Amount
- $62,200
- Spent to date
- $62,017 · 100% of the amount
Park Office Addition at Minekill State Park Schoharie County (M)Office of Parks Recreation & Historic PreservationAug 23, 2017 – Jun 18, 2018$39,900
- Description
- Park Office Addition at Minekill State Park Schoharie County (M)
- Contract number
- D004981
- Type
- Construction: BuildingConstruction
- Term
- Aug 23, 2017 → Jun 18, 201810 months
- Approved
- Aug 23, 2017
- Status
- Ended
- Amount
- $39,900
- Spent to date
- $39,728 · 100% of the amount
Project SA-SX 2015-01 Visitors Center Rehab Schoharie Crossing Montgomery County(P)Office of Parks Recreation & Historic PreservationDec 21, 2016 – Jun 19, 2017$47,811
- Description
- Project SA-SX 2015-01 Visitors Center Rehab Schoharie Crossing Montgomery County(P)
- Contract number
- D004920
- Type
- Construction: BuildingConstruction
- Term
- Dec 21, 2016 → Jun 19, 20176 months
- Approved
- Dec 21, 2016
- Status
- Ended
- Amount
- $47,811
- Spent to date
- $47,591 · 100% of the amount
Provide plumbing materials andCollege of Agriculture and Technology at CobleskillDec 17, 2016 – Jan 31, 2017$56,775
- Description
- Provide plumbing materials and
- Contract number
- T000591
- Type
- Contract not subject to state pre-auditNot pre-audited
- Term
- Dec 17, 2016 → Jan 31, 20171 month
- Approved
- Dec 8, 2016
- Status
- Ended
- Amount
- $56,775
- Spent to date
- $56,775 · 100% of the amount
Renovate medical clinic, brookwood SC, columbia countyOffice of General Services - Design & ConstructionSep 15, 2016 – Nov 11, 2017$111,800
- Description
- Renovate medical clinic, brookwood SC, columbia county
- Contract number
- D44810P
- Type
- Construction: BuildingConstruction
- Term
- Sep 15, 2016 → Nov 11, 201714 months
- Approved
- Sep 15, 2016
- Status
- Ended
- Amount
- $111,800
- Spent to date
- $111,746 · 100% of the amount
Contract-type mix
Share of contract value by type
- Construction24 contracts$3.5M
- Contract not subject to state pre-audit6 contracts$244.5K
Contracts over time
Contracts started per year
View as table
| Year | Contracts |
|---|---|
| 2009: 2 contracts, $584.2K | 2 |
| 2010: 1 contracts, $82.9K | 1 |
| 2011: 0 contracts, $0.0 | 0 |
| 2012: 0 contracts, $0.0 | 0 |
| 2013: 2 contracts, $319.4K | 2 |
| 2014: 1 contracts, $40.4K | 1 |
| 2015: 2 contracts, $201.0K | 2 |
| 2016: 5 contracts, $328.7K | 5 |
| 2017: 2 contracts, $102.1K | 2 |
| 2018: 1 contracts, $148.1K | 1 |
| 2019: 2 contracts, $317.8K | 2 |
| 2020: 0 contracts, $0.0 | 0 |
| 2021: 2 contracts, $422.4K | 2 |
| 2022: 6 contracts, $480.1K | 6 |
| 2023: 1 contracts, $403.8K | 1 |
| 2024: 1 contracts, $227.9K | 1 |
| 2025: 2 contracts, $99.4K | 2 |
| 2026: 0 contracts, $0.0 | 0 |
How the Contractor Score adds up
Established (B, 77/100): works with 4 agencies, $3.8M in contracts.
- Contract volume+7.1measured
$3.8M in current contract value across 30 contracts, more than 77% of scored contractors.
- Recent activity+3.2measured
No active contracts today; the most recent was approved in February 2025.
- Agency breadth+8.3measured
Contracts with 4 different state agencies and facilities.
- Experience+1.8measured
First contract started in March 2009 (17 years of contract history).
- Contract-type mix+6.0measured
3 contract types; the largest group is construction (93% of value). Goods and services contracts are 93% of the total.
- Spending vs. value+0.1measured
On 29 completed contracts with spending recorded, spending is 98% of the contract value. Spending below the full value is common (work can finish under budget) and isn't treated as a problem.
- Federal award history0.0unknown
No federal award history found. Scored as neutral.
- Federal registration0.0unknown
No federal contractor registration found. Scored as neutral.
50 + contributions = 77 (B, Established)Starts at 50. Bars: cool adds, warm subtracts.
Agencies served
Contract value with each agency or facility
Similar contractors
- A
Harold R Clune Inc
Ballston Spa, NYConstruction & Renovation
Since 20095 agencies
- Contract value
- $2.7M
- Contracts
- 22
- Active
- 2
- B
Family Danz Heating & Air Conditioning Inc
Construction & Renovation
Since 20094 agencies
- Contract value
- $5.6M
- Contracts
- 22
- Active
- 0
- B
General Roofing Contractors LLC
Construction & Renovation
Since 20158 agencies
- Contract value
- $17.2M
- Contracts
- 21
- Active
- 0
- A
Stilsing Electric Inc
Rensselaer, NYConstruction & Renovation
Since 20087 agencies
- Contract value
- $68.4M
- Contracts
- 133
- Active
- 23
- A
Upstate Electrical LLC
New Windsor, NYConstruction & Renovation
Since 20173 agencies
- Contract value
- $3.7M
- Contracts
- 3
- Active
- 1
- A
Pipeline Mechanical of Plattsburgh LLC
Plattsburgh, NYConstruction & Renovation
Since 20194 agencies
- Contract value
- $3.8M
- Contracts
- 18
- Active
- 4
- More construction & renovation contractors Ranked by contract value
Browse more
- Office of General Services - Design & Construction contractors
- Office of Parks Recreation & Historic Preservation contractors
- Department of Environmental Conservation contractors
- College of Agriculture and Technology at Cobleskill contractors
- Construction & Renovation contractors
- Top contractors
- All contractors
Contract figures are public New York State contract records as of Nov 13, 2026: current contract amounts and spending to date as reported. Company details are shown when we can match this contractor to a registered business with confidence.
RFP Detector is an independent service and is not affiliated with any government agency. Scores are informational.