Past Performance, Case Study and Resume Templates

Six copy-ready templates for proving you have done this work before: a past performance project profile, a reference permission email, a one-page case study, a key personnel resume, a questionnaire cover email and a letter of commitment, with guidance on adapting each one.

34 min readUpdated All levels

Key takeaways

  • Evaluators judge past performance on recency, relevance and quality. Write every profile so relevance in size, scope and complexity is obvious without the evaluator having to infer it.
  • Build a past performance library as each project closes, so every bid starts from verified facts instead of memory.
  • Never list a reference you have not called first. Confirm their willingness, their current contact details and the project facts.
  • Case studies follow challenge, solution, results, and the results need numbers your client would confirm if asked.
  • Key personnel resumes must use the RFP's own position titles and requirements, and must agree with your project profiles line for line.

Past performance is the part of a proposal where you stop promising and start proving. Evaluators read it to answer one question: has this team done work like ours, recently, and done it well? This chapter gives you copy-ready past performance templates for the documents that answer that question: a project profile, a reference permission email, a one-page case study, a key personnel resume, a past performance questionnaire (PPQ) cover email and a letter of commitment. Each comes with a fields list, a filled-in example where it helps, and notes on adapting it for construction, IT, professional services and nonprofit bids.

What do evaluators look for in past performance?

Almost every past performance evaluation, public or private, comes down to three factors. Recency asks whether the work happened within the window the buyer cares about. Relevance asks whether it resembles the new job in scope, size and complexity. Quality asks how well you performed, judged by references, questionnaires and any formal evaluations on record.

Federal evaluation rules tell agencies to weigh how current and relevant the information is, where it came from and the context around it, as well as overall performance trends. Many solicitations spell out the recency window (three or five years is common, but the RFP decides) and say how they will judge relevance. State agencies, cities, school districts and authorities in New York, New Jersey and Connecticut usually score past performance inside an 'experience and qualifications' criterion and check references by phone or with a reference form. Private companies and foundations tend to ask for case studies and client references instead. The full evaluator's view is in what evaluators look for in the proposal-writing handbook.

How evaluators read a past performance entry, and how to show each factor
How evaluators read a past performance entry, and how to show each factor
FactorWhat the evaluator asksHow to show it in your profile
RecencyWas the work performed inside the window the RFP sets?Give exact start and end dates, and say 'ongoing' when it is. Lead with your most recent projects.
Relevance: scopeDid you do the same kind of work?Name the tasks you performed and cite the matching statement of work (SOW) paragraphs of the new RFP.
Relevance: sizeWas the job comparable in dollars, staff, sites or volume?State the contract value, annual value, team size and volumes (users, tickets, square feet, clients served).
Relevance: complexityDid you face the same constraints?Call out occupied buildings, regulated data, multiple locations, tight schedules, union labor or difficult stakeholders.
QualityDid you perform well?Give measurable results, formal ratings or awards, and an honest account of any problem and how you fixed it.
Your roleWas this your work, or a partner's?Say whether you were prime, subcontractor or joint venture partner, and what share of the work you performed.

Build a past performance library before you need it

The firms that write strong past performance sections in a few hours are not better writers. They capture the facts while a project is fresh and keep them in one place. When an RFP arrives, they pick the closest matches from the library and tailor the relevance section, instead of chasing old contract numbers and former client contacts under deadline.

The past performance library cycle
  1. Stage 1: Project closes

    Or reaches a milestone on a multi-year job.

  2. Stage 2: Capture the facts

    Contract data, scope, results, problems and photos while the team remembers.

  3. Stage 3: Confirm the reference

    Ask the client contact now, while the relationship is warm.

  4. Stage 4: Write the profile and case study

    Use the templates below; store both versions.

  5. Stage 5: Update resumes

    Add the project to every key person who worked on it.

  6. Stage 6: Review twice a year

    Recheck contacts, retire stale projects and add new results.

Facts to capture when every project closes0 of 11 done

Past performance project profile template

The project profile (also called a past performance write-up, reference sheet or contract summary) is the core document. Write one profile per contract. If the RFP limits you to three or five projects, choose the closest matches in scope first, then size, then recency, and fill every field the solicitation asks for, even when the answer is 'none'.

The template below follows the structure that federal past performance information forms and most state reference forms share: identification, contacts, a one-sentence summary, scope, an explicit relevance argument, results, and an honest account of problems. That last section matters. Federal forms often ask you to discuss difficulties and corrective actions directly, and evaluators in every sector trust a profile more when it admits a problem and shows how you solved it.

Template

Past performance project profile

A complete one-to-two page profile for a single contract, with an explicit relevance section that maps your old work to the new requirement.

When to use it

Any RFP that asks for similar projects, past performance, relevant experience or contract references. Use one profile per contract and tailor sections 5 and 8 for each bid.

PAST PERFORMANCE PROJECT PROFILE
Profile [NUMBER] of [TOTAL]  |  Solicitation: [SOLICITATION_NUMBER], [SOLICITATION_TITLE]
Offeror: [COMPANY_NAME]  |  UEI or vendor ID (if requested): [VENDOR_ID]

1. CONTRACT IDENTIFICATION
Project or contract title: [PROJECT_TITLE]
Contract or purchase order number: [CONTRACT_NUMBER]
Client: [CLIENT_LEGAL_NAME], [CLIENT_DEPARTMENT]
Prime contractor (if we were a subcontractor): [PRIME_CONTRACTOR_OR_NA]
Our role: [PRIME / SUBCONTRACTOR / JOINT VENTURE PARTNER]  |  Share of work we performed: [PERCENT_OF_WORK]%
Contract type: [CONTRACT_TYPE]
Place of performance: [CITY_STATE]
Period of performance: [START_DATE] to [END_DATE] ([COMPLETED / ONGOING])
Contract value: original [ORIGINAL_VALUE]; current or final [FINAL_VALUE], including [NUMBER_OF_MODIFICATIONS] modifications
Average annual value: [ANNUAL_VALUE]

2. CLIENT POINTS OF CONTACT (confirmed on [DATE_CONFIRMED])
Technical or program contact: [TECH_CONTACT_NAME], [TECH_CONTACT_TITLE], [TECH_CONTACT_PHONE], [TECH_CONTACT_EMAIL]
Contracting contact: [CONTRACTING_CONTACT_NAME], [CONTRACTING_CONTACT_TITLE], [CONTRACTING_CONTACT_PHONE], [CONTRACTING_CONTACT_EMAIL]

3. SUMMARY OF WORK
Under contract [CONTRACT_NUMBER], [COMPANY_NAME] provided [SERVICES_OR_PRODUCTS] to [CLIENT_LEGAL_NAME] at [NUMBER_OF_SITES_OR_LOCATION] under a [CONTRACT_TYPE] contract.

4. SCOPE OF WORK
[SCOPE_DESCRIPTION: three to five sentences on what we delivered, for whom and at what scale. Name the deliverables and the volumes: sites, users, square feet, tickets, participants or units.]

5. RELEVANCE TO THIS SOLICITATION
Scope: [HOW_THE_TASKS_MATCH, citing the SOW or specification paragraphs of this RFP, for example "SOW 3.1 to 3.4"]
Size: [COMPARISON_OF_VALUE_STAFF_OR_VOLUME, for example "about 80% of the estimated annual value of this contract"]
Complexity: [COMPARABLE_CONSTRAINTS, for example occupied buildings, regulated data, multiple sites, compressed schedule, union labor]

6. RESULTS
- [RESULT_1: a measurable outcome with a baseline and a timeframe]
- [RESULT_2]
- [RESULT_3]
Formal evaluations, ratings or awards: [RATINGS_OR_RECOGNITION_OR_NONE]

7. CHALLENGES AND CORRECTIVE ACTIONS
Challenge: [WHAT_WAS_DIFFICULT_OR_WENT_WRONG, stated plainly]
Action taken: [WHAT_WE_DID]
Outcome: [RESULT_OF_THE_CORRECTIVE_ACTION]

8. PROPOSED KEY PERSONNEL WHO WORKED ON THIS PROJECT
[NAME_1]: [ROLE_ON_THIS_PROJECT]; proposed as [PROPOSED_ROLE]
[NAME_2]: [ROLE_ON_THIS_PROJECT]; proposed as [PROPOSED_ROLE]

Fields to fill in

[SOLICITATION_NUMBER], [SOLICITATION_TITLE]
Copy exactly from the RFP cover page so the profile is traceable if pages get separated.
[VENDOR_ID]
Only if the RFP asks: your Unique Entity ID (UEI) for federal bids, or the state or city vendor ID it names.
[CLIENT_LEGAL_NAME], [CLIENT_DEPARTMENT]
The contracting entity's official name plus the office you served, for example a county's Department of Public Works.
[PRIME_CONTRACTOR_OR_NA]
If you were a subcontractor, name the prime and the end client. Never present subcontract work as prime work.
[PERCENT_OF_WORK]
Your share of the contract's work or value. Evaluators use it to judge how much of the experience is really yours.
[CONTRACT_TYPE]
Firm fixed price, time and materials, unit price, cost reimbursement, grant-funded service contract, and so on.
[ORIGINAL_VALUE], [FINAL_VALUE]
Show both when they differ and be ready to explain why (added scope, options exercised, quantity changes).
[DATE_CONFIRMED]
The date you last spoke with each contact. Recheck any contact older than six months before submitting.
[SCOPE_DESCRIPTION]
Facts and volumes, not adjectives. Three to five sentences.
[Relevance lines (scope, size, complexity)]
The most important section. Cite the new RFP's paragraph numbers and compare like with like.
[RESULT_1] to [RESULT_3]
Each result should be a number the client would confirm: on-time rate, cost saved, backlog cleared, safety record.
[Challenge, action, outcome]
One real problem handled well builds more trust than a perfect record. Keep it factual and short.
[NAME_1], [NAME_2]
Link the project to people you are proposing now. Their resumes must list this project with the same dates and role.
Strong exampleFilled-in example: sections 3, 5, 6 and 7 for a facilities contract (illustrative; names and numbers are fictional)

3. Summary of work. Under contract PW-2023-118, Harborline Facility Services provided custodial, day porter and minor maintenance services to the fictional Bayview County Department of Public Works at 14 occupied county buildings under a three-year firm fixed price contract.

5. Relevance. Scope: the same custodial, porter and work-order tasks as SOW 3.1 to 3.5 of this RFP, including the green-cleaning products required by SOW 3.6. Size: 610,000 cleanable square feet and 42 staff, about 85 percent of the 720,000 square feet in this solicitation. Complexity: all buildings stayed open to the public during service, two operated 24 hours a day, and staff worked under a collective bargaining agreement, as this contract requires.

6. Results. Inspection scores rose from an average of 82 to 96 out of 100 within six months; 98 percent of work orders were closed within the 48-hour standard over the contract term; zero lost-time injuries in three years.

7. Challenge and corrective action. In month two, night-shift turnover left two buildings understaffed. We added a floating crew of four, moved a supervisor to nights and brought staffing back to the contract level within three weeks; no further staffing deficiencies were recorded.

Relevance statements: strong versus weak

Strong

  • Do: Cites the new RFP's SOW paragraphs and maps each to work you actually did
  • Do: Compares size in the buyer's terms: square feet, users, sites, annual value
  • Do: Names the constraints the two jobs share, such as occupied buildings or regulated data
  • Do: Admits a size gap and explains why the experience still transfers

Weak

  • Don't: 'This project is highly relevant to the requirement' with no evidence
  • Don't: Lists every service your company offers instead of what this contract required
  • Don't: Claims a large delivery capacity based on a much smaller job
  • Don't: Uses different values or dates than the reference will remember

Reference request and PPQ cover email templates

References are a two-step process. First you ask permission and confirm the facts, ideally by phone with an email to follow. Second, if the RFP requires a past performance questionnaire, you send the agency's form with a cover email that tells the reference exactly what to do, where to send it and by when. Skipping the first step is the most common reason a PPQ never arrives.

A past performance questionnaire (PPQ) is a standard form, usually attached to the RFP, that your former client fills out and sends to the buying agency. Federal and many state solicitations require the reference to return it directly to the contracting officer or designated contact, not to you. Federal PPQ cover letters often reassure references that the agency will not tell the offeror who said what. Some agencies say they may disregard questionnaires that arrive after the proposal due date, so build in time.

A typical PPQ schedule for a 30-day response window
  1. Days 1 to 3

    Choose and call references

    Pick the closest-match projects, call each contact, and confirm willingness, availability and facts.

  2. Days 3 to 5

    Send the permission email, then the PPQ

    Use the two templates below. Send the PPQ as soon as the reference agrees.

  3. Day 12

    First reminder

    A short, friendly note with the deadline and the return address repeated.

  4. Day 20

    Confirm it was sent

    Ask the reference for a one-line confirmation. If someone cannot do it, switch to a backup reference now.

  5. Days 25 to 30

    Proposal due

    Check whether the RFP lets you confirm receipt with the designated contact. Late questionnaires may not count.

Template

Reference permission and fact-check email

Asks a former client for permission to list them, confirms their contact details and the project facts, and tells them what evaluators are likely to ask.

When to use it

Send after a short phone call, or as the first contact if you cannot reach the person by phone, as soon as you decide to bid. Send one per reference; never blind-copy several references on one email.

Subject: Permission to list you as a reference: [SOLICITATION_TITLE]

Dear [REFERENCE_NAME],

I hope all is well at [REFERENCE_ORGANIZATION]. [COMPANY_NAME] is preparing a proposal for [SOLICITATION_TITLE] ([SOLICITATION_NUMBER]), issued by [ISSUING_AGENCY]. The work is closely related to what we delivered for you on [PROJECT_TITLE], and we would be grateful to list you as a reference.

Before we do, could you confirm three things?

1. You are willing to serve as a reference and expect to be reachable between [EVALUATION_START_DATE] and [EVALUATION_END_DATE].
2. Your contact details are current: [REFERENCE_TITLE], [REFERENCE_PHONE], [REFERENCE_EMAIL].
3. The project facts below match your records.

Project: [PROJECT_TITLE]
Contract number: [CONTRACT_NUMBER]
Period of performance: [START_DATE] to [END_DATE]
Contract value: [CONTRACT_VALUE]
Our role: [ROLE]
Key results: [RESULT_1]; [RESULT_2]

The evaluators may call you, email you or send a short questionnaire. If they do, they will most likely ask about [TOPIC_1], [TOPIC_2] and [TOPIC_3], since those carry the most weight in this solicitation. You do not need to prepare anything; we simply want you to know what to expect.

If a questionnaire is required, we will send it separately with the agency's instructions on where and when to return it.

If you would prefer that we ask a colleague of yours instead, just say so. Either way, thank you for the opportunity to work with you on [PROJECT_TITLE]. I am happy to talk by phone if that is easier: [YOUR_PHONE].

Best regards,

[YOUR_NAME]
[YOUR_TITLE], [COMPANY_NAME]
[YOUR_EMAIL] | [YOUR_PHONE]

Fields to fill in

[REFERENCE_NAME], [REFERENCE_ORGANIZATION]
The person who directly oversaw your work, such as the project manager or contract administrator, not a senior official who only knows your name.
[ISSUING_AGENCY]
The buyer for the new bid. Some references need to know who will contact them before they agree.
[EVALUATION_START_DATE], [EVALUATION_END_DATE]
Your best estimate of when evaluators will call: usually from the due date to a few weeks after. Use the RFP's schedule if it gives one.
[CONTRACT_VALUE], [START_DATE], [END_DATE]
Must match your project profile exactly. Asking the reference to confirm them catches mismatches before evaluators do.
[TOPIC_1] to [TOPIC_3]
Take these from the evaluation criteria: for example schedule control, responsiveness to issues, quality of staff.
[YOUR_PHONE]
A direct line. References who have questions should reach a person, not a general inbox.

Template

Past performance questionnaire (PPQ) cover email

Sends the agency's questionnaire to a reference who has already agreed, with clear instructions, a deadline, a project summary and a return path that goes straight to the agency.

When to use it

Whenever the RFP requires references to complete a questionnaire or reference form. Send it as soon as the reference agrees, and attach the agency's form in the exact file format the RFP provides.

Subject: Action requested by [PPQ_DUE_DATE]: past performance questionnaire for [SOLICITATION_NUMBER]

Dear [REFERENCE_NAME],

Thank you again for agreeing to serve as a reference for [COMPANY_NAME]. As we discussed on [CALL_DATE], [ISSUING_AGENCY] asks each reference to complete a past performance questionnaire as part of its evaluation of proposals for [SOLICITATION_TITLE] ([SOLICITATION_NUMBER]).

The questionnaire is attached. Here is what the agency asks you to do:

What to do: Complete the attached form based on your own assessment of our work on [PROJECT_TITLE] (contract [CONTRACT_NUMBER], [START_DATE] to [END_DATE]).

Where to send it: Return it directly to [AGENCY_CONTACT_NAME], [AGENCY_CONTACT_TITLE], at [AGENCY_RETURN_ADDRESS_OR_PORTAL]. Please do not send the completed form to us; the agency requires it to come straight from you.

Deadline: [PPQ_DUE_DATE] at [DUE_TIME] [TIME_ZONE]. The agency may not consider questionnaires received after this date.

Subject line or file name the agency requested: [REQUIRED_SUBJECT_OR_FILE_NAME]

To save you time, here is a short summary of the project you will be rating:
- Scope: [ONE_SENTENCE_SCOPE]
- Value and our role: [CONTRACT_VALUE]; [ROLE]
- Key outcomes: [OUTCOME_1]; [OUTCOME_2]
- Our staff you worked with: [STAFF_NAMES]

The new contract involves [ONE_SENTENCE_DESCRIPTION_OF_NEW_WORK], which is why your perspective on [RELEVANT_ASPECT] will be especially useful to the evaluators.

The form usually takes about [ESTIMATED_MINUTES] minutes. If you have any trouble with it or with the deadline, please call me at [YOUR_PHONE].

I will send a brief reminder on [REMINDER_DATE]. Once you have sent the form, a one-word reply to this email ("Sent") would help us keep track.

With thanks,

[YOUR_NAME]
[YOUR_TITLE], [COMPANY_NAME]
[YOUR_EMAIL] | [YOUR_PHONE]

Attachment: [PPQ_FILE_NAME]

Fields to fill in

[CALL_DATE]
The date of your permission call. Mentioning it reminds a busy reference that they already said yes.
[AGENCY_CONTACT_NAME], [AGENCY_RETURN_ADDRESS_OR_PORTAL]
Copy exactly from the RFP's past performance instructions. A wrong address is the same as no questionnaire.
[PPQ_DUE_DATE], [DUE_TIME], [TIME_ZONE]
Use the deadline the RFP sets for questionnaires, which may be earlier than the proposal due date.
[REQUIRED_SUBJECT_OR_FILE_NAME]
Many agencies ask for the solicitation number and your company name in the subject line so they can match forms to offerors. Delete the line if the RFP is silent.
[ONE_SENTENCE_SCOPE], [OUTCOME_1], [OUTCOME_2]
Facts the reference can verify. Do not suggest ratings or wording for their answers.
[RELEVANT_ASPECT]
The part of their experience with you that matters most for the new job, for example managing work in occupied schools.
[ESTIMATED_MINUTES]
Look at the form and estimate honestly; most take 15 to 30 minutes.
[REMINDER_DATE]
About a week after sending, and at least a week before the deadline.

Case study template: challenge, solution, results

A case study tells the story of one project in a form a non-specialist can follow in two minutes. Private companies, foundations, hospitals and universities often ask for case studies instead of formal past performance forms. Public RFPs use them too, usually under headings like 'describe similar projects' or 'demonstrated experience', and they double as capability statement and website content.

The structure is simple: the challenge (what the client needed, in numbers), the solution (what you did and how), and the results (what changed, in numbers). Add a short paragraph that connects the story to the new buyer's requirement, and a client quote only if you have written permission to use it.

Template

One-page project case study

A challenge, solution, results case study with a headline result, project facts and a 'why it matters' paragraph tailored to the new buyer.

When to use it

Private sector and nonprofit RFPs, 'similar projects' sections, capability statements, and the work samples on your vendor profile. Keep it to one page.

CASE STUDY: [HEADLINE_RESULT, for example "Cut permit review time by 38% for a mid-size city"]

Client: [CLIENT_NAME] ([CLIENT_TYPE, for example county agency, school district, hospital, nonprofit])
Location: [CITY_STATE]
Period: [START_MONTH_YEAR] to [END_MONTH_YEAR]
Contract value: [VALUE_OR_RANGE]
Our role: [PRIME / SUBCONTRACTOR / PARTNER]
Services: [SERVICE_1], [SERVICE_2], [SERVICE_3]

THE CHALLENGE
[CLIENT_NAME] needed to [GOAL]. [THE_PROBLEM_IN_NUMBERS: baseline metric, backlog, cost, risk or deadline]. The work had to happen [CONSTRAINTS: within a fixed budget, without closing the building, on legacy systems, with limited client staff]. [WHY_IT_MATTERED: the effect on residents, students, patients, clients or operations].

OUR SOLUTION
We [APPROACH_IN_ONE_SENTENCE].
- [ACTION_1: what we did first, and the method or tool we used]
- [ACTION_2]
- [ACTION_3]
Team: [TEAM_SIZE_AND_KEY_ROLES]. [DIFFERENTIATOR: the one thing we did that another firm likely would not have].

THE RESULTS
- [RESULT_1: metric, before and after, and timeframe]
- [RESULT_2]
- [RESULT_3]
- Completed [ON_SCHEDULE_DETAIL] and [BUDGET_DETAIL].

WHY THIS MATTERS FOR [PROSPECTIVE_CLIENT_NAME]
[ONE_OR_TWO_SENTENCES connecting this project to a specific requirement in the new RFP, citing its section number].

"[CLIENT_QUOTE, approved in writing]"
[QUOTE_NAME], [QUOTE_TITLE], [CLIENT_NAME]

Reference: [AVAILABLE_ON_REQUEST / CONTACT_DETAILS_IF_THE_RFP_ASKS]

Fields to fill in

[HEADLINE_RESULT]
Lead with the outcome, not the client's name. A number in the headline gets read.
[CLIENT_NAME]
Use the real name only with permission. Otherwise describe the client ('a 2,000-student Westchester school district').
[THE_PROBLEM_IN_NUMBERS]
The baseline makes the result meaningful: 'a 1,400-application backlog' or '21-day average turnaround'.
[ACTION_1] to [ACTION_3]
Specific actions in order. Name the method, tool or standard you used.
[DIFFERENTIATOR]
Ties the case study to your win themes; see the executive summary chapter for how to choose them.
[RESULT_1] to [RESULT_3]
Before and after, with timeframe. Only numbers the client would confirm.
[PROSPECTIVE_CLIENT_NAME] paragraph
Rewrite for every bid. This is what turns a marketing piece into proposal evidence.
[CLIENT_QUOTE]
Optional. Get written approval of the exact wording and keep it in your library.
Weak exampleWeak results section

We delivered an outstanding solution that exceeded the client's expectations. The new system was a big improvement and staff love it. The project was a great success and showcases our commitment to excellence.

Nothing here can be verified or scored. 'Outstanding', 'big improvement' and 'great success' are claims, not evidence.

Strong exampleStrong results section

Average permit review time fell from 21 business days to 13 within four months of go-live (38 percent faster). The pending backlog dropped from 1,400 applications to under 200. Online submissions rose from 35 to 82 percent of all applications in the first year. We went live on the scheduled date and finished 4 percent under the approved budget.

Every sentence has a baseline, a result and a timeframe the client could confirm.

Where do the numbers come from? Look at your close-out report, monthly status reports, the client's own dashboards, inspection or audit results, invoices against budget, schedule baselines, and satisfaction surveys. If you never measured anything, start now: add two or three measurable outcomes to every new project plan so your next case study writes itself.

Key personnel resume template and letter of commitment

Key personnel are the people the RFP names as essential, such as the project manager, superintendent, lead engineer or program director. The buyer evaluates their resumes and often makes them contractually required: you generally cannot swap them out after award without the buyer's approval. Many RFPs set a page limit per resume, require a specific format, ask for references, or require a signed letter of commitment from each person.

Write each resume against the requirement, not as a career history. Open with a short qualifications summary that uses the RFP's own position title and words, add a crosswalk from each stated requirement to the evidence, and list relevant projects with dates, values and results. Architect-engineer firms answering federal and many state and local solicitations use the SF 330 form instead, where the key personnel resumes (Section E), example projects (Section F) and the participation matrix (Section G) must all agree with each other.

Map each RFP requirement to the line of the resume that proves it (sample for a help desk project manager)
Map each RFP requirement to the line of the resume that proves it (sample for a help desk project manager)
RFP requirement for the positionWhere the resume proves it
Ten years managing IT service desk operationsExperience entries with month-and-year dates that add up to ten or more years, each naming the service desk scope
Project management certification or equivalentLicenses and certifications line with the issuing body and expiration date
Experience supporting public sector clientsProject lines naming the agency or district, value and number of users supported
Managed teams of 15 or moreA bullet with the team size on at least one recent project
Experience with the ITIL service frameworkA bullet describing the processes implemented, plus any certification held

Template

Key personnel resume

A requirement-driven resume with a crosswalk, relevant projects with numbers, and a signed certification. Fits two to three pages.

When to use it

For each person the RFP designates as key personnel, or any resume the RFP requests, unless the RFP supplies its own resume format (then use that format and move this content into it).

KEY PERSONNEL RESUME
Solicitation: [SOLICITATION_NUMBER]  |  Offeror: [COMPANY_NAME]

Name: [FULL_NAME]
Proposed position: [POSITION_TITLE_EXACTLY_AS_IN_RFP]
Labor category (if applicable): [LABOR_CATEGORY]
Relationship to offeror: [EMPLOYEE_SINCE_YEAR / CONTINGENT_HIRE / EMPLOYEE_OF_SUBCONTRACTOR_NAME]
Availability: [PERCENT]% of working time, available from [START_DATE]
Years of relevant experience: [YEARS] (RFP minimum: [REQUIRED_YEARS])

QUALIFICATIONS SUMMARY
[TWO_TO_THREE_SENTENCES that restate the RFP's requirements for this position and show how this person meets each one, using the RFP's own wording.]

REQUIREMENT CROSSWALK
RFP requirement: [REQUIREMENT_1]  ->  Evidence: [WHERE_AND_HOW_MET]
RFP requirement: [REQUIREMENT_2]  ->  Evidence: [WHERE_AND_HOW_MET]
RFP requirement: [REQUIREMENT_3]  ->  Evidence: [WHERE_AND_HOW_MET]

EDUCATION
[DEGREE], [FIELD_OF_STUDY], [INSTITUTION], [YEAR]

LICENSES AND CERTIFICATIONS
[LICENSE_OR_CERTIFICATION], [ISSUING_BODY], [NUMBER_IF_REQUIRED], valid through [EXPIRATION_DATE]

RELEVANT EXPERIENCE (most recent first)
[MONTH_YEAR] to [MONTH_YEAR_OR_PRESENT]  |  [EMPLOYER]  |  [JOB_TITLE]
Project: [PROJECT_NAME] for [CLIENT_NAME] ([PROJECT_VALUE], team of [TEAM_SIZE])
- [RESPONSIBILITY_THAT_MATCHES_THE_PROPOSED_ROLE]
- [ACCOMPLISHMENT_WITH_A_NUMBER]
- [ACCOMPLISHMENT_WITH_A_NUMBER]

[MONTH_YEAR] to [MONTH_YEAR]  |  [EMPLOYER]  |  [JOB_TITLE]
Project: [PROJECT_NAME] for [CLIENT_NAME] ([PROJECT_VALUE])
- [RESPONSIBILITY]
- [ACCOMPLISHMENT_WITH_A_NUMBER]

EARLIER EXPERIENCE (summary)
[YEAR] to [YEAR]: [ONE_LINE_SUMMARY_OF_EARLIER_ROLES]

CLEARANCE OR BACKGROUND CHECK (only if the RFP requires it)
[STATUS_OR_NOT_APPLICABLE]

REFERENCES (only if the RFP requires them)
[REFERENCE_NAME], [REFERENCE_TITLE], [REFERENCE_ORGANIZATION], [REFERENCE_PHONE], [REFERENCE_EMAIL]

CERTIFICATION
I certify that this resume accurately describes my education, licenses and experience, and that I have agreed to be proposed for the position named above.
Signature: ______________________   Date: [DATE]
[FULL_NAME]

Fields to fill in

[POSITION_TITLE_EXACTLY_AS_IN_RFP]
Use the buyer's title, not your internal one. If the RFP says 'Program Manager', do not write 'Engagement Director'.
[RELATIONSHIP_TO_OFFEROR]
Be truthful. Contingent hires and subcontractor staff are common and acceptable when disclosed.
[PERCENT], [START_DATE]
Must match your staffing plan and price volume. A full-time role priced at half time is a red flag.
[YEARS], [REQUIRED_YEARS]
Show the math. Overlapping jobs do not add up twice.
[Requirement crosswalk]
One line per stated requirement for the position, in the RFP's order. If the page limit is tight, merge it into the summary.
[EXPIRATION_DATE]
Licenses that lapse before the contract starts can make the person unqualified. Check before you submit.
[ACCOMPLISHMENT_WITH_A_NUMBER]
Same rule as case studies: baseline, result, timeframe.
[Certification and signature]
Include it when the RFP requires a signed resume. Otherwise you can drop the signature line and keep the certification sentence.

Template

Key personnel letter of commitment

A short signed letter in which a proposed key person confirms the position, start date, time commitment and accuracy of their resume.

When to use it

When the RFP requires letters of commitment or intent, and as good practice for any contingent hire or subcontractor employee you name as key personnel, unless the RFP forbids extra documents.

LETTER OF COMMITMENT

[DATE]

[ISSUING_AGENCY]
Attn: [CONTRACTING_OFFICER_OR_DESIGNATED_CONTACT]
Re: [SOLICITATION_NUMBER], [SOLICITATION_TITLE]

I, [FULL_NAME], confirm that I have agreed to be proposed by [COMPANY_NAME] as [POSITION_TITLE] for the contract resulting from the solicitation above.

If [COMPANY_NAME] receives the award, I commit to:
- Serve as [POSITION_TITLE] beginning on [START_DATE];
- Devote [PERCENT]% of my working time, about [HOURS_PER_WEEK] hours per week, to this contract; and
- Remain in this position for at least [COMMITMENT_PERIOD], barring circumstances beyond my control.

My current relationship with [COMPANY_NAME] is: [EMPLOYEE_SINCE_YEAR / OFFER_ACCEPTED_CONTINGENT_ON_AWARD / EMPLOYEE_OF_SUBCONTRACTOR_NAME].

I have reviewed the resume submitted with this proposal and confirm that it accurately describes my education, licenses and experience. I authorize [COMPANY_NAME] to include it in its proposal.

[LICENSE_OR_CLEARANCE_SENTENCE_IF_REQUIRED]

Signature: ______________________
[FULL_NAME]
[CURRENT_TITLE], [CURRENT_EMPLOYER]
[PHONE] | [EMAIL]

Fields to fill in

[CONTRACTING_OFFICER_OR_DESIGNATED_CONTACT]
The person the RFP names for all communications. Some RFPs prefer letters addressed to the offeror; follow the instructions.
[START_DATE]
The expected contract start date, or 'the contract start date' if the RFP does not give one.
[PERCENT], [HOURS_PER_WEEK]
Firm numbers. Hedged language such as 'intends to be available' weakens the letter.
[COMMITMENT_PERIOD]
Often the base period of the contract, or a minimum such as 12 months. Use what the RFP asks for.
[OFFER_ACCEPTED_CONTINGENT_ON_AWARD]
For people you will hire if you win. Keep the signed offer letter in your files.
[LICENSE_OR_CLEARANCE_SENTENCE_IF_REQUIRED]
For example: 'I hold New York State Professional Engineer license [NUMBER], current through [DATE].' Delete if not needed.

How to adapt these templates for construction, IT, professional services and nonprofits

The structure of each template works in every sector. What changes is the evidence evaluators expect and the vocabulary they use. Use the table to decide what to emphasize, then rewrite the relevance and results sections in the buyer's language.

What to emphasize by industry
What to emphasize by industry
IndustryProject profile and case studyResults that scoreKey personnel focus
Construction and facilitiesBuilding type, square footage, contract value, delivery method, occupied or vacant site, prevailing wage and union labor, bondingOn-schedule completion, change order rate, punch list closeout time, safety record (for example the experience modification rate and recordable incidents), inspection scoresSuperintendent and project manager licenses, OSHA training, years on similar building types, the same superintendent on the cited projects
IT and softwareUsers and sites supported, systems and integrations, hosting model, security and privacy requirements, legacy migrationUptime, ticket resolution times against service levels, defect rates, migration completed without data loss, adoption ratesCertifications tied to the stack, security background checks, experience with the agency's platforms, named architect and lead developer
Professional services and consultingClient type, engagement scope and deliverables, stakeholder groups, methods used, labor categoriesRecommendations adopted, savings identified and realized, deliverables accepted on first submission, reports delivered on scheduleCredentials (CPA, PE, PMP, licensed attorney), subject expertise, prior work for similar agencies, hours committed
Nonprofits and human servicesPopulation served, program model, funding source, geographic area, partners, compliance with funder reportingParticipants served against targets, outcome measures (placements, completions, health indicators), retention, audit results, cost per participantProgram director and clinical leads with licenses, lived experience or community ties, supervision ratios, bilingual staff

Two adaptations deserve a closer look. Construction owners often use a contractor qualification statement that asks for completed projects, current backlog, bonding capacity and safety data in one form; your project profiles should feed it directly, and the projects you list should match what your surety and insurance records show (see Bonding, Insurance and Compliance Requirements). Nonprofits answering government human services RFPs should report outcomes, not just outputs: 'served 420 families' is an output, while '71 percent of families remained stably housed after 12 months' is an outcome, and outcomes are what evaluators score.

What if you have little or no past performance?

Every contractor starts with zero. Evaluators know that, and most solicitations allow you to draw on experience beyond your own company's contract history. Federal evaluation rules, for example, tell agencies to take into account relevant experience of key personnel, predecessor companies and subcontractors who will perform major or critical parts of the work. Be transparent about what you are citing and why it is relevant. For the rules on neutral ratings and new contractors, see little or no past performance.

Five ways to build a credible past performance section from a thin record
  1. Step 1: Use your key people's experience

    Write project profiles for work your principals and key staff performed at previous employers, clearly labeled with the firm they worked for at the time. Pair them with strong resumes.

    Tip: Never imply that your company performed work an employee did elsewhere.
  2. Step 2: Count commercial and private work

    Commercial, nonprofit and private projects are past performance too. A property manager's building contract or a hospital's IT project can be highly relevant to a public job of the same kind.

  3. Step 3: Cite subcontract work

    Work as a subcontractor counts. Name the prime and the end client, and describe only your share. See Subcontracting and Teaming Opportunities for how to get it.

  4. Step 4: Team with an experienced partner

    A teaming partner or mentor firm with relevant contracts can strengthen the team's record, if the RFP allows team member past performance. Their projects go in with their name on them.

  5. Step 5: Start smaller

    Smaller purchases and quick-turn quotes usually weigh price and responsiveness more than a long track record. Use them to build the record you need for larger bids; in RFP Detector search, set a Value maximum and pick the RFQ notice type to find them.

Past performance mistakes that cost points

Do and don't

Do

  • Do: Provide exactly the number of projects and references the RFP asks for
  • Do: Choose the most similar project over the most impressive one
  • Do: Call every reference before listing them, and recheck contacts older than six months
  • Do: Keep values, dates and roles identical across profiles, resumes, case studies and forms
  • Do: Explain a problem and the corrective action before the evaluator hears about it elsewhere
  • Do: Comment on every formal performance evaluation you receive, within the window allowed

Don't

  • Don't: List a contact who has left the organization or never agreed to be a reference
  • Don't: Pad the section with extra projects the RFP did not ask for
  • Don't: Present subcontract or employee experience as your company's prime work
  • Don't: Use round, unverifiable claims such as 'saved millions' or '100% satisfaction'
  • Don't: Ignore a required reference form and attach your own instead
  • Don't: Recycle a resume from the last bid without updating the position title and crosswalk
Key terms
Past performance

Evidence of how well you performed on recent, similar contracts, judged through references, questionnaires and formal evaluations.

Recency

Whether the work falls inside the time window the solicitation sets, often the last three to five years.

Relevance

How closely a past contract resembles the new one in scope (type of work), size (dollars, staff, volume) and complexity (constraints and risk).

PPQ (past performance questionnaire)

A form, usually attached to the RFP, that your former client completes and returns directly to the buying agency.

CPARS

The Contractor Performance Assessment Reporting System, where federal agencies record formal evaluations of contractor performance. Contractors are notified and can comment on each evaluation.

Key personnel

People the solicitation designates as essential to the contract. Their resumes are evaluated, and replacing them after award usually needs the buyer's approval.

Letter of commitment

A signed statement in which a proposed person confirms they will fill the named role if you win.

Neutral rating

The rating federal evaluators generally give an offeror with no relevant past performance record: neither favorable nor unfavorable.

SF 330

The federal Architect-Engineer Qualifications form, also used by some state and local agencies, with sections for key personnel resumes, example projects and a participation matrix.

Frequently asked questions

What is a past performance template?

A past performance template is a reusable form for describing one completed or ongoing contract in a proposal: the contract details, client contacts, scope, how the work relates to the new requirement, measurable results and any problems you solved. Using the same template for every project keeps your facts consistent and lets you tailor only the relevance section for each bid. If the RFP supplies its own past performance form, use that form and copy your content into it.

How do I ask a client to be a past performance reference?

Ask in writing before you list them. Name the solicitation and the agency, remind them of the project you delivered for them, and ask three things: that they are willing and reachable during the evaluation window, that their title, phone and email are current, and that the project facts (contract number, dates, value, your role and key results) match their records. Tell them which topics evaluators are likely to ask about. The reference permission email covers all of this in one message.

How do I send a past performance questionnaire to my references?

If the instructions allow it, fill in your company and contract details at the top of the form, then send it to each reference with a short cover email that gives the agency's return address or portal and the exact deadline. The reference sends the completed questionnaire straight to the agency, never back to you. Check in with the reference a few days before the deadline, and never fill in or ask to see the ratings.

Can a key employee's or subcontractor's experience count as past performance?

Sometimes. Federal evaluation rules let agencies consider the past performance of predecessor companies, key personnel with relevant experience and subcontractors that will perform major parts of the work, and many state and local RFPs do the same, but only where the solicitation allows it. Say whose experience it is and what share of the new work they will do. Never present an employee's work for a former employer, or a subcontract, as your own company's prime contract.

What is a letter of commitment for key personnel?

It is a short letter, signed by the person you propose, confirming that they agree to be named in your proposal, that they will serve in the stated position from a given start date for a stated share of their time if you win, and that their resume is accurate. Solicitations often require one for key personnel, especially people who are not yet your employees, and a missing required letter can make a proposal unacceptable. Collect it early, address it to the agency and use the position title exactly as the RFP names it.

What should a key personnel resume include?

The proposed position title exactly as the RFP names it, availability and time commitment, a short qualifications summary in the RFP's words, education, current licenses and certifications with expiration dates, and relevant experience with dates, project values, team sizes and measurable accomplishments. Add references, a clearance statement or a signed certification only when the RFP requires them, and stay within any page limit.

What is the difference between a case study and a past performance write-up?

A past performance write-up is a structured record of one contract, built around the facts evaluators need to score recency, relevance and quality: contract number, value, dates, contacts and results. A case study tells the same project as a short story, challenge then solution then results, for readers who want to understand the outcome quickly. Formal public RFPs usually want the write-up; private and nonprofit buyers often prefer case studies. Keep both versions of every major project in your library.

Complete handbook

Download the complete handbook (PDF)

All 8 chapters, templates and checklists, ready to print or share.

Put it into practice

Search open RFPs from federal, state, local, education, private and non-profit issuers, each with the RFP Detector Score.

Find RFPs

Free handbooks

Keep learning

All guides and templates